57
|
Friday, August 24, 2012, 16:44 |
John Wong | UC2 | 39165-5 | LP-SIS | In progress | Conditioning UCx#5 | Friday, August 24, 2012, 16:40
Target is loaded with 245 discs of
UCx (material from batch#02-13062012), |
|
56
|
Thursday, July 19, 2012, 17:14 |
John Wong | UO2/C | Target boat #2 | | Done | Processing UC2 flakes for UCx#5 - (batch#02-13062012) | Thursday, July 19, 2012, 17:09
UO2/C green was prepared on June
13, 2012. |
 |
55
|
Tuesday, July 10, 2012, 12:54 |
John Wong | UC2 | 38634-9 | LP-SIS | Done | UCx#4 final conditioning completed | Tuesday, July 10, 2012, 12:44
Target contains 230 discs of UCx
(material from UC2 flakes, batch#01-04062012). |
 |
54
|
Monday, June 25, 2012, 16:00 |
John Wong | UO2/C | UCx-heatboat#2 | | Problems resolved | UC2 flakes - batch#01-04062012: Fiber converters failed |
|
|
53
|
Sunday, June 24, 2012, 22:52 |
John Wong | UO2/C | UCx-heatboat#2 | | Problems | UC2 flakes - batch#01-04062012: IOC problems |
|
|
52
|
Tuesday, June 12, 2012, 14:43 |
John Wong | | | | Maintenance | Changing backing pump oil | Tuesday, June 12, 2012, 14:38
The backing pump oil was changed
(ISAC WP#2012-06-12-1). |
|
51
|
Tuesday, June 12, 2012, 11:38 |
John Wong | UO2/C | UCx-heatboat#2 | | Problems resolved | UC2 flakes - batch#01-04062012: broken seal & TGHT power supply |
|
|
50
|
Monday, June 11, 2012, 10:48 |
John Wong | UO2/C | UCx-heatboat#2 | | Problems | UC2 flakes - batch#01-04062012: broken seal & TGHT power supply |
|
|
49
|
Wednesday, June 06, 2012, 16:58 |
John Wong | UO2/C | UCx-heatboat#2 | | Done | UC2 flakes for UCx#4: batch#01-04062012 | Wednesday, June 06, 2012, 16:55
The UO2/C green was prepared on June
04, 2012. |
7x |
48
|
Monday, May 14, 2012, 15:22 |
John Wong | | Target boat | | | Testing the new graphite foil from Ceramaterial | Monday, May 14, 2012, 15:04
Due to the differences in the use
of the graphite foils in past SiC targets |
   |
47
|
Tuesday, May 08, 2012, 07:42 |
John Wong | SiC | 38817-3 | HP-SIS | Done | Sintering SiC | Tuesday, May 08, 2012, 07:32
Target oven is filled with 240 discs
of SiC/C, and wrapped with 3 Ta-foils. |
 |
46
|
Thursday, April 05, 2012, 16:47 |
John Wong | Empty | 38817-3 | HP-SIS | Done | Coating target oven /w TaC & sintering | Thursday, April 05, 2012, 16:43
Target oven is coated with TaC.
The oven is wrapped with 3 Ta-heat shields. |
|
45
|
Tuesday, February 14, 2012, 21:56 |
John Wong | UO2 | 38481-9 | LP-FEBIAD | Done | UO2/Nb sintering process | Tuesday, February 14, 2012, 20:58
Evaporator is setup for UO2/Nb sintering
process. |
 |
44
|
Monday, November 14, 2011, 11:56 |
Peter Kunz | UC2 | 38634-10 | LP-SIS | Done | UCx03: Conditioning up to 175A | Evaporator was cleaned Nov 11 from after
target was conditioned up to 175A. There
was significant condensation of oily fluid |
 |
43
|
Thursday, November 03, 2011, 09:24 |
John Wong | UC2 | 38634-10 | LP-SIS | Done | UCx#3: Final conditioning | Thursday, November 03, 2011, 08:59
Target was previously coated/sintered
with TaC & wrapped with 3 Ta-heat shields, |
    |
42
|
Thursday, October 06, 2011, 12:22 |
John Wong | UO2/C | UCx-heatboat#2 | | Done | UCx#3: Batch#2 - UO2/C mixture of carbonization | Thursday, October 06, 2011, 12:19
|
  |
41
|
Thursday, September 29, 2011, 10:58 |
John Wong | UO2/C | UCx-heatboat#2 | | Done | UCx#3: Batch#1 - UO2/C mixture of carbonization | Thursday, September 29, 2011, 10:54
UO2/C mixture was made on Tuesday
Sept 27, casted on a piece of glass and let |
6x |
40
|
Thursday, September 22, 2011, 20:34 |
John Wong | Empty | 38634-9 | LP-SIS | Done | Sintering TaC coating for UCx#2 (spare) | Thursday, September 22, 2011, 20:21
Target oven was wrapped with 3 Ta-heat
shields and has been pumping down. |
|
39
|
Wednesday, September 21, 2011, 13:23 |
John Wong | Empty | 38634-10 | LP-SIS | Done | Sintering TaC coating on target oven for UCx#3 | Wednesday, September 21, 2011, 13:23
Target oven was wrapped with 3-Ta
heatshields including the back block. |
|
38
|
Tuesday, September 13, 2011, 16:53 |
John Wong | SiC | 38295-9 | HP-FEBIAD | Done | Ready | Tuesday, September 13, 2011, 16:51
Target is wrapped with 3-Ta heat
shields. |