Entry  Thu Oct 30 22:09:02 2014, Keerthi Jayamanna, , , Suoernanogan steering 
IOS mass scan does not work.
A/Q            FC6                X         
Y          CCB1
Entry  Thu Oct 30 13:14:51 2014, Brian Minato, Other, Other, OLIS Update 
MCIS-
a new oven assembly was installed on the MCIS yesterday.  The cart has been installed in the cage and is connected.
The power is connected to the cart oven as is the MCIS bias.  it is currently on and being tested for Se
Entry  Tue Oct 28 13:30:47 2014, Brian Minato, Other, Other, MCIS Update 
MCIS-
the cleaning has been completed.  The oven assembly is removed and the gate valve closed.
The quartz tubes on the ground electrode have been installed with the larger diameter tube pushed as far downstream (toward the optics box) as
Entry  Mon Oct 27 15:13:18 2014, Brian Minato, , ,  
MCIS-
cleaning out source to remove potassium and calcium.
Areas cleaned with scotch-brite and then wiped with methanol:  plasma chamber, tuning chamber (ports opened for access), TP3 tube.  The
Entry  Fri Oct 24 10:50:20 2014, Brian Minato, Other, Other, OLIS Update 
The nitrogen bottle needs to be replaced.
 
MCIS-
Entry  Thu Oct 23 10:52:21 2014, Brian Minato, Routine, General, ALGA Amplifier 
The ALGA amplifier and its signal generator have been turned off at the request of Controls.  They have had communication issues and are looking
for any recent changes.
Entry  Wed Oct 22 07:58:32 2014, Brian Minato, Other, General, MCIS Work 
The remaining connections were done on the MCIS. 
A piece of 1/8" teflon was installed between the back of the sputtering tube/motor and the HV cage.
Ray confirmed the cart power supplies (heater and sputtering) Epics page readouts for Voltage and Current are okay.  The Heater p/s was left
Entry  Tue Oct 21 07:14:26 2014, Brian Minato, Other, General, OLIS Work 
MCIS-
the cart was moved into the HV cage.  The facilities will be connected and an oven will be tested for the upcoming Se experiment.
Will take measurements for installation of key interlocks on cart power supplies.
Entry  Tue Oct 14 08:31:53 2014, Brian Minato, Other, General, Water Flow Switch #3 
This entry was incorrectly added to the OLIS logbook.  it has been moved to the I3 logbook.
Entry  Fri Oct 10 14:02:56 2014, Raymond Dube, Routine, General, Test with new Alga, ALPA 50W RF AMP ALPA-RF_AMP-50W.pdf
We did a test yesterday with the new Alga Microwave RF AMP, model # ALPA 50 Watt, serial # 130684 to be used for the MCIS.  We used the RF Generator
from MISTIC and set the frequency to 13.80 Ghz, note that the RF Generator was/is  limited to 16DB maxiumum RF output.
The RF cable that we used was from the 200W RF AMP, it has a 20DB SMA attenuator at the Generator end, so we could only get about 25 Watts maximum
Entry  Tue Sep 16 11:55:28 2014, Raymond Dubé, Routine, General, MCIS info Cart-Power1.pdfSuperNanogan_Control-R1.pdfSupernanogan_Interlocks-R1.pdf
I found these files about the MCIS in Geoff folders in M:\ISIS\Geoff-110715\OLIS\SuperNanogan
Entry  Wed Aug 13 15:09:42 2014, Raymond Dubé, Routine, General, OLIS Attenuators #2 fixed, #1 gone! 
Today Probe group (Scott K.) installed the OLIS Attenuator, they fixed the vacuum leak on Attenuator #2,  Marco
M. asked them to remove Attenuator #1 because it is not needed and confusing for Ops;
 
Entry  Wed Aug 13 15:04:05 2014, Raymond Dubé, , , OLIS Bender Magnet PS (0-500 amps) 
Arthur and Derek had a look at the OLIS Bender Magnet P/S and found a problem with the Polarity Switch, it was set up
upside down, they fixed that.
Note: We do not need a Polarity Switch for OLIS may be we should remove or bypass it, at the moment when the PS
Entry  Wed Aug 13 15:00:27 2014, Raymond Dubé, Routine, General, OLIS Surface Source broken Ionizer Coil ISK4386D-rev5.pdfISK4583D-rev7.pdfISK4584D-rev1.pdfPE-R5-FAN_ON.jpg
We spent most of the day looking at OLIS to find out why the "Ionizer Coil" keeps breaking down, we found
the following:
1.  The FAN to cool R5 (ref: ISK4583D rev.7) a 25 Ohm 200W Resistor (2x50 ohm/100W ea.) was not ON, the nylon
Entry  Fri May 16 08:44:27 2014, Raymond Dubé, Routine, General, OLIS work next week OLIS-Work-05.pdf
Attached is the scheduled work for OLIS next week.
Entry  Wed Jan 29 12:27:57 2014, Raymond Dubé, , , OLIS Skimmers BOP & Labels isk4363d-rev4.pdfisk4365d-rev2.pdf
I updated 2 drawings that show the OLIS skimmers.
A.  ISK4363D for the OLIS Skimmers BOP connections, we have 7 skimmers cables (6 wires per cable) going in
and 16 skimmers channel going out to Controls.
Entry  Fri Jan 24 09:15:10 2014, Raymond Dubé, , , New ISK4586D for OLIS with 3 Ion Source ISK4586D-rev1.pdf
I created a new drawing: ISK4586D that shows the Optics for OLIS with 3 Ion Source.
Entry  Thu Jan 23 12:56:14 2014, Raymond Dubé, , , New & updated drawings for S.S. ISK4478D-rev5.pdfISK4585D-rev2.pdfISK4583D-rev5.pdf
I updated an old drawing ISK4478D (MS & MCIS Optics) and created 2 new ones: ISK4583D (Electrical Diagram for SS
& MS) and ISK4585D (SS & MS Optics)
If you see any errors please let me know.
Entry  Wed Jan 22 10:34:58 2014, Raymond Dubé, , , IN-line 100K for IOS:YCB1A removed 
Last January 17th 2014 we removed an in-line resistor (100K 10W) from IOS:YCB1A because we do not think that it is needed.
 
Entry  Mon Dec 17 14:10:22 2012, Keerthi Jayamanna, , , Gas flow controller fault 
Controls group may need some assistance from OLIS group in order to trouble shoot the problem.