  582   Friday, May 05, 2017, 14:28 Aaron SchmidtUC#20LP-IG-LIS     Conditioning Heat shield for UC#20 (2) New O-rings installed on FS#3.
Friday, May 05, 2017, 14:24: Roughing.
Friday, May 05, 2017, 14:34: Waterlines
 UC#20_Heat_shield_conditioning-2.docxTS-2017-05-05-17-11.rgaTS-2017-05-11-07-50.rga 
  686   Friday, September 21, 2018, 11:41 Aaron SchmidtUC#26LP-IG-LISITETM4 42132-1In progressConditioning Heat Shield for UC#26Friday, September 21, 2018, 11:40: Roughing
Friday, September 21, 2018, 11:41:
Doors sealed for roughing.
 TS-2018-09-21-14-53.rgaUC#26.docx 
  901   Monday, October 04, 2021, 15:38 Aaron Schmidt LP-IG-LISITETM4 42132-7In progressConditioning UC#35 IG-LIS HSMonday, October 04, 2021, 15:38: Roughing.
Monday, October 04, 2021, 16:08:
TP1B on. 
 UC#35.docx 
  936   Thursday, July 07, 2022, 16:52 Aaron Schmidt LP-IG-LISITWTM2 42132-3In progressConditioning UC#39 assemblyNo UCx target installed. Straight / blank
oven in use for out gassing.
Thursday, July 07, 2022, 16:50: Roughing.
  
  971   Thursday, July 06, 2023, 16:55 Aaron SchmidtNb#10LP-IG-LISITWTM245447-742132-2In progressConditioning Nb#10Thursday, July 06, 2023, 16:13: Roughing.
Thursday, July 06, 2023, 16:41: TP1B
on.
 Nb#10_Conditioning.docx 
  978   Friday, August 25, 2023, 17:21 Aaron SchmidtNb#11LP-IG-LISITWTM245447-942132-4In progressConditioning Nb#11Replacement for Nb#10
Friday, August 25, 2023, 17:15: Roughing.
Friday, August 25, 2023, 17:57: Vacuum
 Nb#11_Conditioning.docx 
  1026   Tuesday, October 29, 2024, 18:25 Aaron SchmidtUC#46 (assembly only)LP-IG-LISITWTM4 42972-6 / 39956-1In progressConditioning UC#46 Assembly 42972-6 Base / 39956-1 Lid
Tuesday, October 29, 2024, 18:20:
Roughing. 
  
  1028   Tuesday, November 05, 2024, 16:40 Brady BorrmannUC #24D (Assembly only)LP-IG-LIS   44972-5 / 42972-9In progressConditioning UC#24D Assembly42972-5 Base / 42972-9 Lid
  
  675   Monday, July 23, 2018, 14:25 Aaron SchmidtUC#23LP-FEBIAD-CTLITETM2  In progressConditioning Heat Shield for UC#23Monday, July 23, 2018, 14:20: Roughing.
Monday, July 23, 2018, 14:54: Turbo
pumps on. 
 UC#23_emit.dat_error.docxTS-2018-07-2-08-07.rgaTS-2018-07-24-07-20.rgaUC#23.docx 
  36   Tuesday, February 28, 2012, 10:29 Pierre Bricault LP-FEBIAD    In progressTest FEBIAD at ISAC test statnd    
  108   Thursday, June 28, 2012, 11:04 Pierre BricaultTest FEBIADLP-FEBIAD    In progressReady to bias the high voltage.    
  109   Thursday, June 28, 2012, 11:13 Pierre Bricault LP-FEBIAD     ISAC test stand ready for cathode heatingThe ISAC test stand is ready for cathode
heating.
Bias voltage: 30000 V
  
  110   Thursday, June 28, 2012, 11:19 Pierre Bricault LP-FEBIAD    In progressCathode ramping to 230 A in progress    
  111   Thursday, June 28, 2012, 11:27 Pierre Bricault LP-FEBIAD    In progressCathode heating in progress, pressure 8.3e-7 T    
  112   Thursday, June 28, 2012, 11:29 Pierre Bricault LP-FEBIAD    In progressLost all cnntrol interface, complete whiteout of the epics system.    
  113   Thursday, June 28, 2012, 15:14 Aurelia Laxdal LP-FEBIAD     Quick checkJust a quick check at the Test Stand:
1. The system operational ( 
white out not present ) with TSH:TBHT heating
  
  114   Thursday, June 28, 2012, 17:00 Pierre Bricault LP-FEBIAD    In progressCathode heater reached its value of 230 A and stoped. good test.Now ramp cathode current up to 290 A. The
total current out is 1.e-7 A.
 
  
  115   Thursday, June 28, 2012, 17:18 Pierre Bricault LP-FEBIAD    In progressLeave the cathode heater at 275 A overninght.    
  116   Friday, June 29, 2012, 08:57 Pierre Bricault LP-FEBIAD    In progressContinue cathode heating This morning the pressure was 3.5E-7
T. Current at 275 A is 30nA.
Continue cathode heating to 290 A
  
  157   Friday, August 10, 2012, 12:44 Pierre BricaultNALP-FEBIAD  NANAIn progressFEBIAD testRick put the helium bottle back in the
rack.
Waiting for status of the gas lines.
  