ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
884
|
Wednesday, June 30, 2021, 19:08 |
Fernando Maldonado | | LP-FEBIAD | | | | | Failed | FEBIAD parameter scan - efficiency measurements | Wednesday, June 30, 2021, 19:08: Roughing
Thursday, July 01, 2021,
08:57: Turbos on |
|
883
|
Monday, June 28, 2021, 09:22 |
Aaron Schmidt | | | | | | | | Empty Chamber | Monday, June 28, 2021, 09:22: Roughing.
Monday, June 28, 2021, 10:10: TP1B
on. |
|
882
|
Friday, June 25, 2021, 11:18 |
Aaron Schmidt | Ta#62 | LP-SIS | ITE | TM4 | 44691-4 | 44378-4 | Done | Ta#62 Conditioning - New | Replacement Ta target for the previous
one (44139-10) https://elog.triumf.ca/TIS/Test-Stand/880
Friday, June 25, 2021, 11:16: Roughing. |
|
881
|
Wednesday, June 23, 2021, 12:24 |
Aaron Schmidt | SiC#40 | HP-SIS | ITE | TM4 | 42218-8 | 43515-8 | In progress | SiC#40 Conditioning-2 | Wednesday, June 23, 2021, 12:22: Roughing.
Wednesday, June 23, 2021, 13:22:
TP1B on. |
|
880
|
Monday, June 21, 2021, 11:53 |
Aaron Schmidt | Ta#62 | LP-SIS | ITE | TM4 | 44139-10 | 44378-4 | Failed | Ta#62 Conditioning - 2 | Replace 9-pin back to normal grounded setup.
Re-salt Ta#62. (Cu Gaskets in-use on FS#5)
Monday, June 21, 2021, 11:30: Roughing |
|
879
|
Wednesday, June 09, 2021, 14:31 |
Aaron Schmidt | Ta#62 | LP-SIS | ITE | TM4 | 44139-10 | 44378-4 | In progress | Install MB1 window & 9 pin for V test. | Installed a new window on MB1 as per Aurelia.
Connect modified 9 pin connector & voltage
meters for Ta#62 testing. |
|
878
|
Wednesday, June 09, 2021, 11:51 |
Aaron Schmidt | | | | | | | Problems/Solutions | TPS:CB2 issue. | Tuesday, June 08, 2021, 08:25: IV4 open.
Optics set minus TPS:CB2. Shows as green
'on', set to 500V, however read back shows |
|
877
|
Monday, June 07, 2021, 14:40 |
Aaron Schmidt | | | | | | | Done | FC6 re-installed | Monday, June 07, 2021, 14:39: Roughing
beam line section.
Monday, June 07, 2021, 14:46: TMS:TP6 |
|
876
|
Monday, June 07, 2021, 13:45 |
Aaron Schmidt | Ta#62 | LP-SIS | ITE | TM4 | 44139-10 | 44378-4 | In progress | Ta#62 Conditioning | Monday, June 07, 2021, 13:44: Roughing.
Monday, June 07, 2021, 14:16: TP1B
on. (Tripped shortly after?) |
|
875
|
Wednesday, June 02, 2021, 10:45 |
Aaron Schmidt | UC#34 HS | LP-SIS | | TM2 | 43044-13 | 44378-1 | In progress | UC#34 HS conditioning | Straight tube target / TGHT for outgassing.
Wednesday, June 02, 2021, 11:06:
Roughing. |
|
874
|
Wednesday, May 26, 2021, 14:29 |
Aaron Schmidt | UC#33 (HS) | LP-SIS | ITW | TM2 | | 44378-3 | In progress | UC#33 HS conditioning | HS waterlines were very tight to line up.
Wednesday, May 26, 2021, 14:29: Roughing.
Wednesday, May 26, 2021, 15:09: TP1B |
|
873
|
Wednesday, May 19, 2021, 16:02 |
Aaron Schmidt | | | | | | | | P2N HS conditioning | Parasitic assemblies on the lid & end
plate included. Online HS.
Wednesday, May 19, 2021, 16:00: Roughing. |
|
872
|
Wednesday, April 28, 2021, 22:34 |
Luca Egoriti | P2N test - Apr 2021 | P2N-SIS | ITE | TM4 | | | In progress | P2N heating test | Wednesday, April 28, 2021, 22:30
First P2N heating test ongoing.
At P2NHT ~ 570 A and TBHT ~ 100 A |
|
871
|
Monday, April 19, 2021, 14:58 |
Anders Mjos | | P2N-SIS | | | | | Problems/Solutions | Water leak on coil neg (H and F) | Determined on Friday April 16th that the
water leak was on the coil negative circuit.
This was determined by circulating water |
|
870
|
Wednesday, April 14, 2021, 10:21 |
Luca Egoriti | P2N test - Apr 2021 | HP-SIS | | | | | In progress | P2N test - Electrical reconfiguration | Wednesday, April 14, 2021, 10:18
Work started to bring the ATTS PS
inside the ITS HV cage. HV grounding rod |
|
869
|
Tuesday, April 13, 2021, 13:27 |
Aaron Schmidt | | | | | | | | Indium gaskets installed FS#3 | Changed the gaskets from C-seals on FS#3
water blocks E, F,& H. G was already
done. |
|
868
|
Sunday, April 04, 2021, 14:16 |
Carla Babcock | | | | | | | | Water leak problem persists | IG1 has been spiking randomly, causing
everything to turn off. Looks like the water
leak is still there. |
|
867
|
Tuesday, March 30, 2021, 13:19 |
Carla Babcock | | | | | | | | Second emittance meter testing | Emittance meter number 2 ready for beam
shortly - installed and pumping down.
No beam found by Thursday evening, |
|
866
|
Friday, March 26, 2021, 17:04 |
Carla Babcock | | | | | | | | Beam line vented for emittance meter exchange | Vented beamline and removed ARIEL emittance
meter. In the process of swapping components,
beamline left vented until Monday when we |
|
865
|
Thursday, March 25, 2021, 08:11 |
Aaron Schmidt | | | | | | | | Test Stand Tripped. (Water leak) | |
|
|