Entry  Wednesday, June 30, 2021, 19:08, Fernando Maldonado, , LP-FEBIAD, , , , , Failed, FEBIAD parameter scan - efficiency measurements  anomalous-ionization-regime.pngFernando_screenshots.docx
Wednesday, June 30, 2021, 19:08: Roughing

Thursday, July 01, 2021, 08:57: Turbos on 
Thursday, July 01, 2021, 09:11: TP1A timed out. Reset it. Waiting for CG1A to drop a bit more. 
Entry  Monday, June 28, 2021, 09:22, Aaron Schmidt, , , , , , , , Empty Chamber 
Monday, June 28, 2021, 09:22: Roughing.
Monday, June 28, 2021, 10:10: TP1B on.
Monday, June 28, 2021, 10:22: TP1A on (Tripped)
Entry  Friday, June 25, 2021, 11:18, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44691-4, 44378-4, Done, Ta#62 Conditioning - New Ta#62_44691-4_Conditioning_-_R.docxTa#62_44691-4_Conditioning..docxITE-TM4-Ta#62-LP-SIS_Test_Stand.docx
Replacement Ta target for the previous one (44139-10) https://elog.triumf.ca/TIS/Test-Stand/880
Friday, June 25, 2021, 11:16: Roughing.
Friday, June 25, 2021, 11:55: TP1B started.
Entry  Wednesday, June 23, 2021, 12:24, Aaron Schmidt, SiC#40, HP-SIS, ITE, TM4, 42218-8, 43515-8, In progress, SiC#40 Conditioning-2 SiC#40_Conditioning_-_2.docxER-580-230-30kV-m7_-_2.txt
Wednesday, June 23, 2021, 12:22: Roughing.
Wednesday, June 23, 2021, 13:22: TP1B on.
TP1B tripped.
Entry  Monday, June 21, 2021, 11:53, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44139-10, 44378-4, Failed, Ta#62 Conditioning - 2 Ta#62_Conditioning_-_2.docx
Replace 9-pin back to normal grounded setup. Re-salt Ta#62. (Cu Gaskets in-use on FS#5)
Monday, June 21, 2021, 11:30: Roughing chamber.
Monday, June 21, 2021, 11:50: Removed backing window. Roughing beam line side.
Entry  Wednesday, June 09, 2021, 14:31, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44139-10, 44378-4, In progress, Install MB1 window & 9 pin for V test. Ta#62_voltage_tests.docx
Installed a new window on MB1 as per Aurelia. Connect modified 9 pin connector & voltage meters for Ta#62 testing.
Ref:
https://elog.triumf.ca/TIS/Test-Stand/679
Entry  Wednesday, June 09, 2021, 11:51, Aaron Schmidt, , , , , , , Problems/Solutions, TPS:CB2 issue. 
Tuesday, June 08, 2021, 08:25: IV4 open. Optics set minus TPS:CB2. Shows  as green 'on', set to 500V, however read back shows as 0 V.

Wednesday, June 09, 2021, 08:37: HV off. Attempts made to restart TPS:CB2 unsuccessful. Controls notified.
Wednesday, June 09, 2021, 11:49: Card replaced by controls. Verified "Ok"  in " LB Mode": RDVOL, RDCUR, RDDAC all similar.
Entry  Monday, June 07, 2021, 14:40, Aaron Schmidt, , , , , , , Done, FC6 re-installed 
Monday, June 07, 2021, 14:39: Roughing beam line section.
Monday, June 07, 2021, 14:46: TMS:TP6 on.
Monday, June 07, 2021, 14:49: TMS:TP2 on.
Entry  Monday, June 07, 2021, 13:45, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44139-10, 44378-4, In progress, Ta#62 Conditioning Ta#62_Conditioning_-_1.docx
Monday, June 07, 2021, 13:44: Roughing.
Monday, June 07, 2021, 14:16: TP1B on. (Tripped shortly after?)
Monday, June 07, 2021, 14:32: Unstable. Venting.
Entry  Wednesday, June 02, 2021, 10:45, Aaron Schmidt, UC#34 HS, LP-SIS, , TM2, 43044-13, 44378-1, In progress, UC#34 HS conditioning 
 Straight tube target / TGHT for outgassing.
Wednesday, June 02, 2021, 11:06: Roughing.
Wednesday, June 02, 2021, 12:15: TP1B on. 
Entry  Wednesday, May 26, 2021, 14:29, Aaron Schmidt, UC#33 (HS), LP-SIS, ITW, TM2, , 44378-3, In progress, UC#33 HS conditioning Conditioning_UC#33_HS.docx
HS waterlines were very tight to line up.
Wednesday, May 26, 2021, 14:29: Roughing.
Wednesday, May 26, 2021, 15:09: TP1B on. 
Entry  Wednesday, May 19, 2021, 16:02, Aaron Schmidt, , , , , , , , P2N HS conditioning  HV_test_-_Online_HS_&_parasitic_mods.docx
Parasitic assemblies on the lid & end plate included. Online HS.
Wednesday, May 19, 2021, 16:00: Roughing.

Thursday, May 20, 2021, 08:42: Turbo pumps were turned on last night. Vacuum @ 9.99e-07T.
Entry  Wednesday, April 28, 2021, 22:34, Luca Egoriti, P2N test - Apr 2021, P2N-SIS, ITE, TM4, , , In progress, P2N heating test Target_580A_100A_glowing.jpgInitial_rampup.PNG
 Wednesday, April 28, 2021, 22:30
First P2N heating test ongoing.
At P2NHT ~ 570 A and TBHT ~ 100 A shine is already seen, which suggests that current is flowing in the P2N target properly, see picture attached.
Entry  Monday, April 19, 2021, 14:58, Anders Mjos, , P2N-SIS, , , , , Problems/Solutions, Water leak on coil neg (H and F) 
Determined on Friday April 16th that the water leak was on the coil negative circuit. This was determined by circulating water through once circuit at
the time. Only HF and GE tested (not Extraction Electrode).
Entry  Wednesday, April 14, 2021, 10:21, Luca Egoriti, P2N test - Apr 2021, HP-SIS, , , , , In progress, P2N test - Electrical reconfiguration ITS_electrical_panel_-_removed.jpgResistance_matrix_2021-04-28.png
 Wednesday, April 14, 2021, 10:18
Work started to bring the ATTS PS inside the ITS HV cage. HV grounding rod and metal sheet around breaker panel were removed - see picture.
 Friday, April 16, 2021, Afternoon
Entry  Tuesday, April 13, 2021, 13:27, Aaron Schmidt, , , , , , , , Indium gaskets installed FS#3 
Changed the gaskets from C-seals on FS#3 water blocks E, F,& H. G was already done.
Tuesday, April 13, 2021, 13:23: FS#3 Waterline opened.
Tuesday, April 13, 2021, 13:25: No immediate water noticed visually or on the gloves.
Entry  Sunday, April 04, 2021, 14:16, Carla Babcock, , , , , , , , Water leak problem persists 
IG1 has been spiking randomly, causing everything to turn off. Looks like the water leak is still there.
Entry  Tuesday, March 30, 2021, 13:19, Carla Babcock, , , , , , , , Second emittance meter testing Carla_tune_tracking.docx
Emittance meter number 2 ready for beam shortly - installed and pumping down.
No beam found by Thursday evening, but beam seems to be coming out much differently than last time. Will check on emittance meter functionality
and try to re-tune later.
Entry  Friday, March 26, 2021, 17:04, Carla Babcock, , , , , , , , Beam line vented for emittance meter exchange 
Vented beamline and removed ARIEL emittance meter. In the process of swapping components, beamline left vented until Monday when we will finish the job.
Entry  Thursday, March 25, 2021, 08:11, Aaron Schmidt, , , , , , , , Test Stand Tripped. (Water leak) Mar_2021_-_FS#3_leak..docx
 