Wednesday, July 28, 2021, 08:48, Fernando Maldonado, , LP-FEBIAD, , , 41790-10, 44378-5, Failed, FEBIAD parameter scan - efficiency measurements
|
Modified spiral tube from VCR to counteract torque towards the HS. Now points towards TBHT.
Electric checks before closing shows no short between TIS and HS. |
Tuesday, July 27, 2021, 12:57, Fernando Maldonado, , LP-FEBIAD, , , 41790-10, 44378-5, Failed, FEBIAD parameter scan - efficiency measurements
|
Assembly has new gas tube to the target for better fit and clearance to the HS.
Electric checks before closing shows no short between TIS and HS.
Tuesday, July 27, 2021, 12:57: Venting |
Monday, July 26, 2021, 17:35, Fernando Maldonado, , LP-FEBIAD, , , 41790-10, 44378-5, Failed, FEBIAD efficiency measurements.
|
Monday, July 26, 2021, 17:23: Roughing
Monday, July 26, 2021, 17:55: Turbos on.
Monday, July 26, 2021, 18:03 : TP1A timed out ...again |
Thursday, July 22, 2021, 17:43, Fernando Maldonado, , LP-FEBIAD, , , 41790-10, 44378-5, Failed, FEBIAD efficiency measurements
|
Thursday, July 22, 2021, 17:43: Roughing
New argon gas bottle installed.
Thursday, July 22, 2021, 18:16: Turbos on. |
Wednesday, June 30, 2021, 19:08, Fernando Maldonado, , LP-FEBIAD, , , , , Failed, FEBIAD parameter scan - efficiency measurements 
|
Wednesday, June 30, 2021, 19:08: Roughing
Thursday, July 01, 2021, 08:57: Turbos on
Thursday, July 01, 2021, 09:11: TP1A timed out. Reset it. Waiting for CG1A to drop a bit more. |
Monday, June 28, 2021, 09:22, Aaron Schmidt, , , , , , , , Empty Chamber
|
Monday, June 28, 2021, 09:22: Roughing.
Monday, June 28, 2021, 10:10: TP1B on.
Monday, June 28, 2021, 10:22: TP1A on (Tripped) |
Friday, June 25, 2021, 11:18, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44691-4, 44378-4, Done, Ta#62 Conditioning - New  
|
Replacement Ta target for the previous one (44139-10) https://elog.triumf.ca/TIS/Test-Stand/880
Friday, June 25, 2021, 11:16: Roughing.
Friday, June 25, 2021, 11:55: TP1B started. |
Wednesday, June 23, 2021, 12:24, Aaron Schmidt, SiC#40, HP-SIS, ITE, TM4, 42218-8, 43515-8, In progress, SiC#40 Conditioning-2 
|
Wednesday, June 23, 2021, 12:22: Roughing.
Wednesday, June 23, 2021, 13:22: TP1B on.
TP1B tripped. |
Monday, June 21, 2021, 11:53, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44139-10, 44378-4, Failed, Ta#62 Conditioning - 2
|
Replace 9-pin back to normal grounded setup. Re-salt Ta#62. (Cu Gaskets in-use on FS#5)
Monday, June 21, 2021, 11:30: Roughing chamber.
Monday, June 21, 2021, 11:50: Removed backing window. Roughing beam line side. |
Wednesday, June 09, 2021, 14:31, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44139-10, 44378-4, In progress, Install MB1 window & 9 pin for V test.
|
Installed a new window on MB1 as per Aurelia. Connect modified 9 pin connector & voltage meters for Ta#62 testing.
Ref:
https://elog.triumf.ca/TIS/Test-Stand/679 |
Wednesday, June 09, 2021, 11:51, Aaron Schmidt, , , , , , , Problems/Solutions, TPS:CB2 issue.
|
Tuesday, June 08, 2021, 08:25: IV4 open. Optics set minus TPS:CB2. Shows as green 'on', set to 500V, however read back shows as 0 V.
Wednesday, June 09, 2021, 08:37: HV off. Attempts made to restart TPS:CB2 unsuccessful. Controls notified.
Wednesday, June 09, 2021, 11:49: Card replaced by controls. Verified "Ok" in " LB Mode": RDVOL, RDCUR, RDDAC all similar. |
Monday, June 07, 2021, 14:40, Aaron Schmidt, , , , , , , Done, FC6 re-installed
|
Monday, June 07, 2021, 14:39: Roughing beam line section.
Monday, June 07, 2021, 14:46: TMS:TP6 on.
Monday, June 07, 2021, 14:49: TMS:TP2 on. |
Monday, June 07, 2021, 13:45, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44139-10, 44378-4, In progress, Ta#62 Conditioning
|
Monday, June 07, 2021, 13:44: Roughing.
Monday, June 07, 2021, 14:16: TP1B on. (Tripped shortly after?)
Monday, June 07, 2021, 14:32: Unstable. Venting. |
Wednesday, June 02, 2021, 10:45, Aaron Schmidt, UC#34 HS, LP-SIS, , TM2, 43044-13, 44378-1, In progress, UC#34 HS conditioning
|
Straight tube target / TGHT for outgassing.
Wednesday, June 02, 2021, 11:06: Roughing.
Wednesday, June 02, 2021, 12:15: TP1B on. |
Wednesday, May 26, 2021, 14:29, Aaron Schmidt, UC#33 (HS), LP-SIS, ITW, TM2, , 44378-3, In progress, UC#33 HS conditioning
|
HS waterlines were very tight to line up.
Wednesday, May 26, 2021, 14:29: Roughing.
Wednesday, May 26, 2021, 15:09: TP1B on. |
Wednesday, May 19, 2021, 16:02, Aaron Schmidt, , , , , , , , P2N HS conditioning
|
Parasitic assemblies on the lid & end plate included. Online HS.
Wednesday, May 19, 2021, 16:00: Roughing.
Thursday, May 20, 2021, 08:42: Turbo pumps were turned on last night. Vacuum @ 9.99e-07T. |
Wednesday, April 28, 2021, 22:34, Luca Egoriti, P2N test - Apr 2021, P2N-SIS, ITE, TM4, , , In progress, P2N heating test 
|
Wednesday, April 28, 2021, 22:30
First P2N heating test ongoing.
At P2NHT ~ 570 A and TBHT ~ 100 A shine is already seen, which suggests that current is flowing in the P2N target properly, see picture attached. |
Monday, April 19, 2021, 14:58, Anders Mjos, , P2N-SIS, , , , , Problems/Solutions, Water leak on coil neg (H and F)
|
Determined on Friday April 16th that the water leak was on the coil negative circuit. This was determined by circulating water through once circuit at
the time. Only HF and GE tested (not Extraction Electrode). |
Wednesday, April 14, 2021, 10:21, Luca Egoriti, P2N test - Apr 2021, HP-SIS, , , , , In progress, P2N test - Electrical reconfiguration 
|
Wednesday, April 14, 2021, 10:18
Work started to bring the ATTS PS inside the ITS HV cage. HV grounding rod and metal sheet around breaker panel were removed - see picture.
Friday, April 16, 2021, Afternoon |
Tuesday, April 13, 2021, 13:27, Aaron Schmidt, , , , , , , , Indium gaskets installed FS#3
|
Changed the gaskets from C-seals on FS#3 water blocks E, F,& H. G was already done.
Tuesday, April 13, 2021, 13:23: FS#3 Waterline opened.
Tuesday, April 13, 2021, 13:25: No immediate water noticed visually or on the gloves. |
|