867
|
Tuesday, March 30, 2021, 13:19 |
Carla Babcock | | | | | | | | Second emittance meter testing | Emittance meter number 2 ready for beam
shortly - installed and pumping down.
No beam found by Thursday evening, |
|
|
868
|
Sunday, April 04, 2021, 14:16 |
Carla Babcock | | | | | | | | Water leak problem persists | IG1 has been spiking randomly, causing
everything to turn off. Looks like the water
leak is still there. |
|
|
869
|
Tuesday, April 13, 2021, 13:27 |
Aaron Schmidt | | | | | | | | Indium gaskets installed FS#3 | Changed the gaskets from C-seals on FS#3
water blocks E, F,& H. G was already
done. |
|
|
873
|
Wednesday, May 19, 2021, 16:02 |
Aaron Schmidt | | | | | | | | P2N HS conditioning | Parasitic assemblies on the lid & end
plate included. Online HS.
Wednesday, May 19, 2021, 16:00: Roughing. |
|
|
883
|
Monday, June 28, 2021, 09:22 |
Aaron Schmidt | | | | | | | | Empty Chamber | Monday, June 28, 2021, 09:22: Roughing.
Monday, June 28, 2021, 10:10: TP1B
on. |
|
|
896
|
Wednesday, August 25, 2021, 15:30 |
Ferran Boix Pamies | | | | | | | | Thermocouple high voltage test | Wednesday, August 25, 2021, 15:29: Roughing.
Thursday, August 26, 2021,
04:11: IG1 switched on. Vacuum @ 8.35e-06T |
|
|
897
|
Tuesday, August 31, 2021, 13:55 |
Aaron Schmidt | | | | | | | | Pump down chamber | Pump down chamber w/ empty HS |
|
|
900
|
Thursday, September 23, 2021, 07:16 |
Aaron Schmidt | | | | | | | | Pump down empty chamber & reboot | Thursday, September 23, 2021, 07:15: Roughing.
Waterline loop installed.
Monday, September 27, 2021, |
|
|
902
|
Wednesday, October 06, 2021, 11:56 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Wednesday, October 06, 2021, 11:56: Roughing.
Thursday, October 14, 2021,
09:07: Venting. |
|
|
904
|
Wednesday, October 20, 2021, 15:01 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Wednesday, October 20, 2021, 15:01: Roughing. |
|
|
907
|
Tuesday, November 16, 2021, 13:45 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Tuesday, November 16, 2021, 13:44: Roughing.
Water loop installed. Lock out tag removed. |
|
|
909
|
Tuesday, January 04, 2022, 13:00 |
Aaron Schmidt | | | | | | | | Post water leak | December 30th, 2021: Water poured
down around Isac test stand and probes lab |
|
|
910
|
Wednesday, January 05, 2022, 15:12 |
Carla Babcock | | | | | | | | Modifications to test stand for mass marker tests | Connection of TBHT negative to HV common
removed (R4 in circuit diagram). Labelled
and put in MRO bucket. |
|
|
911
|
Wednesday, January 12, 2022, 16:12 |
Carla Babcock | | | | | | | | Ramp up of the mass marker target | Wednesday, January 12, 2022, 16:08 : HV
ramped to 30kV, EZL=15kV, EE=-1.5kV
Ramping up to 250A on TGHT, 200A |
|
|
912
|
Monday, February 28, 2022, 08:08 |
Aaron Schmidt | | LP-SIS | | | | | | Mass marker / Coil-Tube target Test #2 | Installed & roughing Friday.
Monday, February 28, 2022, 08:07:
Turbopump TP1B on. |
|
|
913
|
Monday, March 21, 2022, 13:59 |
Carla Babcock | | | | | | | | 3rd mass marker test | 3rd version of the mass marker target has
been installed. This one is further back
on the heat shield, and has a longer ceramic |
|
|
914
|
Monday, April 04, 2022, 20:44 |
Carla Babcock | | | | | | | | Change from 9-pin connectors to 5-pin connectors | Swapped the old 9pin connectors out and
replaced with 2 5-pin connectors, same as
on the modules. |
|
|
915
|
Monday, April 04, 2022, 20:56 |
Carla Babcock | | | | | | | | wiring reverted for cathode-bias FEBIAD | Wiring which was changed to run the mass
marker tests has been reverted:
anode bias cable connected |
|
|
916
|
Tuesday, April 05, 2022, 14:01 |
Aaron Schmidt | Test FEBIAD TM2-2022 | LP-FEBIAD | ITW | TM2 | | 42752-5 | | Test FEBIAD & TS operation | Tuesday, April 05, 2022, 13:57: Roughing.
BV1B.
Tuesday, April 05, 2022, 14:04: BV1A |
|
|
917
|
Thursday, April 07, 2022, 11:19 |
Aaron Schmidt | Test FEBIAD TM2-2022 | | ITW | TM2 | | 42752-5 | | Test FEBAID & TS operation | Gas system switched on manually to
use Ar & calibrated leak.
Thursday, April 07, 2022, 10:25: |
|