Thursday, March 25, 2021, 08:11, Aaron Schmidt, , , , , , , , Test Stand Tripped. (Water leak)
|

Lot's of water visually present in the chamber.
Wednesday, March 24, 2021, 13:17: Water lines purged.
Vent & wipe out the water inside the chamber. Setup a fan to aid in drying. Manually purge the water from the RP1 Scroll pump through the exhaust.
Thursday, March 25, 2021, 08:06: Gradually open each line to check the water blocks & fittings for a visual leak. Open the ballast plug on RP1, as well as manually purge the water from the RP1 Scroll pump through the exhaust again.
Thursday, March 25, 2021, 08:34: Leak found on FS#3 - Left Coil return (G) water block.
Thursday, March 25, 2021, 09:15: FEBIAD assembly & L-Coil line removed.
Thursday, March 25, 2021, 11:38: Re-connect RP1 to the exhaust port & re-insert the ballast plug.
Thursday, March 25, 2021, 11:40: RP1 Ok. CG1A & CG1 B around 0.048T & dropping. Chamber still open.
Indium gasket installed on G, C-Seal on E.
Friday, March 26, 2021, 08:21: Roughing.
Friday, March 26, 2021, 09:08: Vacuum @ 2.001 T. Opened FS#3 waterline. Quick test.
Friday, March 26, 2021, 09:11: Vacuum @ 1.901 T. No observable spike on CG1.
Friday, March 26, 2021, 09:12: Close FS#3 & purge
Friday, March 26, 2021, 09:27: Quickly open ballast plug.
Friday, March 26, 2021, 09:30: Re-insert plug.
Friday, March 26, 2021, 09:38: CG1 @ 2.253 T.
Friday, March 26, 2021, 09:41: Close BV1A & B.
Friday, March 26, 2021, 09:45: Manually purge water from the RP1 Scroll pump through the exhaust.
Friday, March 26, 2021, 09:51: Re-open BV1A & B.
Friday, March 26, 2021, 10:17: Close BV1A & B. Manually purge water from the RP1 Scroll pump through the exhaust.
Friday, March 26, 2021, 10:26: Close the exhaust & give the pump time to recover.
Friday, March 26, 2021, 10:36: Briefly vent the chamber to 30 T. Re-open BV1A & B.
Friday, March 26, 2021, 11:20: Vacuum @ 1.706T. Open FS#3. Allow to fill with water, then close off. No observable spike on CG1.
Friday, March 26, 2021, 11:25: Opened ballast cap. Close BV1A & B.
Friday, March 26, 2021, 11:26: Close ballast.
Friday, March 26, 2021, 11:29: Briefly vent the chamber to 30 T. Re-open BV1A & B.
Friday, March 26, 2021, 12:11: Vacuum @ 2.75T. Close BV1A & B. Vent chamber to setup a fan.
Monday, March 29, 2021, 09:00: LD & He attached. LD#2 as supplied via Vacuum group.
Monday, March 29, 2021, 09:01: Sniffer set. Leak Rate @ 2.0E-07 to 2.3E-07 atm-cc/sec
Monday, March 29, 2021, 09:03: Pressurize (E)(G) to 75 PSI.
Monday, March 29, 2021, 09:05: No major spike seen on LD.
Monday, March 29, 2021, 09:06: Pressurize (E)(G) to 100 PSI.
Monday, March 29, 2021, 09:09: No major spike seen on LD. Purge He from the lines.
Monday, March 29, 2021, 09:12: Roughing.
Monday, March 29, 2021, 09:22: Opened ballast cap to release water vapour while roughing.
Monday, March 29, 2021, 09:42: Closed the ballast cap. Purge cycle RP1 on & off for the next hour or so.
To purge cycle RP1 for water vapour. Close BV1A & B. Disconnect exhaust line from RP1 & open the upper ballast. Close PV1, Vent with TSG:VV1A till the line reaches atmosphere with dry nitrogen.
Close VV1 & open PV1. Water should spew out of the exhaust. Rough the backing lines down. Open BV1A & B to rough then chamber. Repeat leaving the upper ballast open.
Monday, March 29, 2021, 14:00: Purge RP1. Close upper ballast, re-connect exhaust.
Monday, March 29, 2021, 14:36: TP1B on.
Monday, March 29, 2021, 19:47: TP1A on.
Monday, March 29, 2021, 19:55: IG1 on.
Tuesday, March 30, 2021, 08:52: Vacuum @ 4.48e-06T.
LD to TP1B base @ 1.4E-08 to 1.9E-08 atm-cc/sec.
Tuesday, March 30, 2021, 08:58: He @ 55 PSI
Tuesday, March 30, 2021, 09:04: LD to TP1B base @ 2.4E-08 atm-cc/sec.
Tuesday, March 30, 2021, 09:12: Reconnect FS#3 to DI.
Tuesday, March 30, 2021, 09:14: Opened FS#3 w/ DI
Tuesday, March 30, 2021, 09:20: Vacuum @ 4.40e-06T.
Tuesday, March 30, 2021, 09:33: FS#2, 4, & 5 open. Vacuum ok @ 4.40e-06T
Tuesday, March 30, 2021, 09:34: Power/sources on.
Tuesday, March 30, 2021, 09:37: Auto-ramping TGHT / TBHT to 200 / 100 A @ 2 A per min.
Tuesday, March 30, 2021, 12:12: Auto-ramping TGHT / TBHT to 350 / 125 A @ 2 A per min.
Tuesday, March 30, 2021, 13:50: Vacuum @ 4.66e-06T. Auto-ramping TGHT / TBHT to 450 / 150 A @ 2 A per min.
Tuesday, March 30, 2021, 21:59: Vacuum @ 5.01e-06T. TGHT / TBHT @ 393 / 150 A. Reset Auto-ramping TGHT / TBHT to 550 / 200 A @ 2 A per min.
Wednesday, March 31, 2021, 11:46: IV4 opened. Optics & HV power switched on.
Wednesday, March 31, 2021, 11:52: HV check ok. Optics reset. BIAS / EE / EZL @ 1 / 0.1 / 1 kV. Coil @ 4 A. Anode @ 100 V
Wednesday, March 31, 2021, 11:54: Optics remain on. HV & coil back to 0. Ready to run once the Vacuum returns to a reasonable level. Vacuum @ 5.45e-06T.
Wednesday, March 31, 2021, 15:05: Auto-ramping TGHT / TBHT to 580 / 270 A @ 2 A per min. |
Friday, March 26, 2021, 17:04, Carla Babcock, , , , , , , , Beam line vented for emittance meter exchange
|
Vented beamline and removed ARIEL emittance meter. In the process of swapping components, beamline left vented until Monday when we will finish the job. |
Tuesday, March 30, 2021, 13:19, Carla Babcock, , , , , , , , Second emittance meter testing
|
Emittance meter number 2 ready for beam shortly - installed and pumping down.
No beam found by Thursday evening, but beam seems to be coming out much differently than last time. Will check on emittance meter functionality and try to re-tune later.
Ramping things down for the next couple days.
Saturday, April 03, 2021, 10:41 :
Source heating ramped back up, everything back on. Will try to straighten out steering then see if I can get things back in the previous positions.
Saturday, April 03, 2021, 14:59 :
Nothing seems to be working, will vent the beamline and remove the slit.
Saturday, April 03, 2021, 15:36 :
Apparently closing the valve started a vacuum leak that tripped everything in the source. I noticed within the first minute and ramped everything back up, maybe too quickly....
Have now put everything in a holding state, will resume tomorrow.
Sunday, April 04, 2021, 14:17 :
Found everything off again this morning. Ramping back up in the hopes that I can get something done before the whole system trips again. The trips look like water leaks again.
Uninstalled the slit and left it in the bottom of the vacuum box. Swapped the window to the computer side for convenience. Seal on the other side on the CF flange is a bit weird, not sure if it is in properly...
Sunday, April 04, 2021, 18:43
Still no beam. TISA emittance FC won't come back on, so waiting for Mike Rowe to troubleshoot on Tuesday. Will ramp things down all the way, since I expect the vacuum to trip the source before I need it again.
Tuesday, April 06, 2021, 23:43
Found some beam, but looks really weird, like it is cut off. Good enough. Ramped everything down. |
Sunday, April 04, 2021, 14:16, Carla Babcock, , , , , , , , Water leak problem persists
|
IG1 has been spiking randomly, causing everything to turn off. Looks like the water leak is still there.

AS - Multiple purges done on RP1 & the backing lines. Some water noted. FS#3 is closed.
Tuesday, April 06, 2021, 09:39: TP1B on.
Tuesday, April 06, 2021, 10:01: TP1A on.
Tuesday, April 06, 2021, 10:12: IG1 on. Vacuum @ 1.97e-05T.
Tuesday, April 06, 2021, 11:00: FS#2, #4, & #5 open. Vacuum @ 5.73e-06T.
Tuesday, April 06, 2021, 11:12: Vacuum @ 5.09e-06T. Open FS#3.
Tuesday, April 06, 2021, 11:17: IG1 @ 4.64e-06T. Open IV4. Reset optics & sources.
Tuesday, April 06, 2021, 11:20: Optics on.
Test were run
Thursday, April 08, 2021, 10:30: Power / sources off.
Thursday, April 08, 2021, 10:34: IG1 & turbo pumps off.
|
Tuesday, April 13, 2021, 13:27, Aaron Schmidt, , , , , , , , Indium gaskets installed FS#3
|
Changed the gaskets from C-seals on FS#3 water blocks E, F,& H. G was already done.
Tuesday, April 13, 2021, 13:23: FS#3 Waterline opened.
Tuesday, April 13, 2021, 13:25: No immediate water noticed visually or on the gloves.
Tuesday, April 13, 2021, 13:31: Visual leak present on (F). Purge the line.
Change the gasket.
Tuesday, April 13, 2021, 14:42: FS#3 Waterline opened.
Tuesday, April 13, 2021, 14:55: No water leak noticed visually or on the gloves.
Tuesday, April 13, 2021, 14:58: Roughing. Will leak check under vacuum tomorrow morning.
Tuesday, April 13, 2021, 16:01: TP1B on.
Tuesday, April 13, 2021, 20:53: TP1A on.
Tuesday, April 13, 2021, 20:58: IG1 on.
|
Wednesday, May 19, 2021, 16:02, Aaron Schmidt, , , , , , , , P2N HS conditioning
|
Parasitic assemblies on the lid & end plate included. Online HS.
Wednesday, May 19, 2021, 16:00: Roughing.
Thursday, May 20, 2021, 08:42: Turbo pumps were turned on last night. Vacuum @ 9.99e-07T.
Thursday, May 20, 2021, 08:44: FS#5 open. Vacuum ok.
Thursday, May 20, 2021, 08:45: Power / sources on.
Thursday, May 20, 2021, 09:34: Turbos OFF
Thursday, May 20, 2021, 10:37: Venting.
Thursday, May 20, 2021, 11:28: P2N legs no longer touching. Roughing.
Thursday, May 20, 2021, 12:05: Turbo pump TP1B on.
Thursday, May 20, 2021, 12:10: Turbo pump TP1A on.
LE:
Thursday, May 20, 2021, 15:00: Ramping stared at high warming rate. 10 or 5 A every 15 seconds
Friday, May 21, 2021, 01:31: Around midnight, the P2NHT current was very noisy for few hours, and then it dropped to zero. Turbos are now stopped to open up and investigate.
Friday, May 21, 2021, 05:45 P2N assembly removed, water lines closed and purged - one leg is fully broken
FBP:
HV tests Monday 24/05/2021 and Tuesday 25/05/2021
HS was ramped up to 30KV on monday, only 1 spark seen over night. BIAS/EZL/EE : 30KV/14KV/-1.5
Ramping to max HV on Tuesday.
40KV
AS:
Tuesday, May 25, 2021, 11:5: HV tapped down to 0 kV on BIAS / EE / EZL.
Wednesday, May 26, 2021, 07:23: Power / sources off. IG1 off. Turbo pumps off.
Wednesday, May 26, 2021, 09:04: Venting. Waterlines purged.
LE:
Wednesday, May 26, 2021, 10:37 Target removed from test stand and brought to cold lab
|
Monday, June 28, 2021, 09:22, Aaron Schmidt, , , , , , , , Empty Chamber
|
Monday, June 28, 2021, 09:22: Roughing.
Monday, June 28, 2021, 10:10: TP1B on.
Monday, June 28, 2021, 10:22: TP1A on (Tripped)
Monday, June 28, 2021, 10:30: Both turbo pumps off. Leave it under a rough vacuum.
Fernando
Wednesday, June 30, 2021, 15:09 : Venting |
Wednesday, August 25, 2021, 15:30, Ferran Boix Pamies, , , , , , , , Thermocouple high voltage test
|
Wednesday, August 25, 2021, 15:29: Roughing.
Thursday, August 26, 2021, 04:11: IG1 switched on. Vacuum @ 8.35e-06T - AS
Thursday, August 26, 2021, 14:04 Water on, no spike in vacuum. IG1:2.6e-6T
Thursday, August 26, 2021, 14:37 HV rack closed, BIAS EE and EZL power supplies on.
Thursday, August 26, 2021, 15:03 BIAS/EE/EZL 10000/-1000/9000
Thursday, August 26, 2021, 15:08 BIAS/EE/EZL 30000/-1500/13000 1 spark just when reached 30kV.
Thursday, August 26, 2021, 15:28 Series of sparks restarted the controling PC. Back in control BIAS/EE/EZL 48000/-2500/22000
Thursday, August 26, 2021, 15:34 BIAS/EE/EZL 50000/-2500/22000
Thursday, August 26, 2021, 15:48 BIAS/EE/EZL 55000/-2800/24000
Thursday, August 26, 2021, 15:53 Ramping down.
Monday, August 30, 2021, 10:25 turbos off.
|
Tuesday, August 31, 2021, 13:55, Aaron Schmidt, , , , , , , , Pump down chamber
|
Pump down chamber w/ empty HS |
Thursday, September 23, 2021, 07:16, Aaron Schmidt, , , , , , , , Pump down empty chamber & reboot
|
Thursday, September 23, 2021, 07:15: Roughing. Waterline loop installed.
Monday, September 27, 2021, 10:35: MB1 off. Turbo pumps, IG, RP, all off/closed. DI water closed/purged.
TS shutdown for planned power outage.
Friday, October 01, 2021, 06:03: Roughing pumps on.
Friday, October 01, 2021, 06:04: Roughing TS beam line side.
Friday, October 01, 2021, 06:52: TMS:TP6 & TMS:TP2 on. Venting Chamber side.
Friday, October 01, 2021, 06:57: IG6 on - Filament 2 manually set. Beam line side vacuum @ 1.5e-05T
Friday, October 01, 2021, 07:01: Vacuum @ 9.04e-06T & dropping steady (Beam line side) OK.
Friday, October 01, 2021, 07:05: Reboot ISAC TS PLC/IOC. Reset controls whiteout.
Friday, October 01, 2021, 07:10: MB1 restart ok. |
Wednesday, October 06, 2021, 11:56, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Wednesday, October 06, 2021, 11:56: Roughing.
Thursday, October 14, 2021, 09:07: Venting. |
Wednesday, October 20, 2021, 15:01, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Wednesday, October 20, 2021, 15:01: Roughing. |
Tuesday, November 16, 2021, 13:45, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Tuesday, November 16, 2021, 13:44: Roughing. Water loop installed. Lock out tag removed. |
Tuesday, January 04, 2022, 13:00, Aaron Schmidt, , , , , , , , Post water leak
|
December 30th, 2021: Water poured down around Isac test stand and probes lab area in service annex extension. problem was traced to a Cracked HVAC coil on SA roof
Fault: 14601
https://web.accel.triumf.ca/ncr/dbfault.pl?faultno=14601&usertype=unknown&username=&faultgroup=CYCLOTRON&debug=0&btn_submit=Showfault
https://elog.triumf.ca/TIS/Test-Stand/908
Noted on arrival to startup the ISAC TS some cleaning of the area was required. Optics PS & all PS quickly checked. OK / Dry.
Use caution when HV is to be applied later. Expect conditioning / noise from the cage.
|
Wednesday, January 05, 2022, 15:12, Carla Babcock, , , , , , , , Modifications to test stand for mass marker tests
|
Connection of TBHT negative to HV common removed (R4 in circuit diagram). Labelled and put in MRO bucket.
Anode connection moved to feedthrough J.
Rewired multipin patch panel. Left some grounded (HVC) wires hanging, should probably make this nice later. |
Wednesday, January 12, 2022, 16:12, Carla Babcock, , , , , , , , Ramp up of the mass marker target   
|
Wednesday, January 12, 2022, 16:08 : HV ramped to 30kV, EZL=15kV, EE=-1.5kV
Ramping up to 250A on TGHT, 200A on TBHT. See MassMarkerTest#1 for ramp up values of the thermocouples.
Seeing some beam on FC0, changing magnet settings to Cs to check FC6 then will ramp up.
Thursday, January 13, 2022, 14:22 : 1.3e-10 approximately Cs on FC6. Optimal EE -2700V, slightly higher than standard on EZL.

Ramping down to Na on the magnet, found 5 pA:

Started a ramp up to nominal heater values (TGHT-500 A TBHT-230 A) but too much HV sparking so aborted at TGHT-299 A and TBHT-230 A. Ramped HV down to 16kV to get sparking to slow down.
Ramped quickly back up to 30kV to get FC readings but since there is so much sparking, we decided to ramp everything down and open the vacuum chamber.
PLAN:
1. ramp down heaters, vent vacuum, open chamber.
2. Try to tape the thermocouples up so that they are further from ground.
3. Try to crimp the bottom of the mass marker tubes, and bend them upwards so they aren't facing ground.
4. Add a dedicated ground to the COIL power supply.
From Fernando:

Monday, January 17, 2022, 09:52: IG1 on. Source PS off. HV Cage removed. - AS
Monday, January 17, 2022, 11:11: Cage on. TGHT/TBHT PS on. - AS
Monday, January 17, 2022, 11:23: PS/ Sources on. - AS
Monday, January 17, 2022, 14:00: HV ramped to 20kV, EZL 10kV, EE, -1500V. Ramping TGHT/TBHT to previous values of 250A/200A.
Monday, January 17, 2022, 16:51 : Back to previous heater values, didn't find any Cs on FC6 so went to Na. Tuned and found the tune the opposite of last time, all voltage wanted to go lower. Found 736pA, maybe better than last time because I tuned quite a bit.


Monday, January 17, 2022, 18:00: Ramping to TGHT 300A, TBHT 230A, where we had sparking problems last time.
Monday, January 17, 2022, 18:17 : So far no sparking issues so I will start to heat up the mass markers. One spark about 4 mins after ramping up, after that maybe 10 sparks/40mins or so. Too many....
Monday, January 17, 2022, 19:20 : Got to 20A on the mass markers, will ramp down now.
Friday, January 28, 2022, 18:49 : Yesterday opened the HV rack to re-start data logging on the thermocouples. This morning ramped everything up and started the heaters. Found the Na current around 250A on the target, but abandoned looking for it because the TGHT heating was causing lots of outgassing, which was causing bias sparks. In addition, there is a weird effect where the Na current spikes, then slowly decreases over the course of an hour or something, to values lower than before the heating. Could this be an indication of some thermal issues, like cold spots where things condense? Or something is drifting. The HV common point on the target is at the mass markers now instead of at the exit of the ion source, but I can't imagine you would see such a large difference. The thermocouples do not change in value during these long slow declines. In light of this, decided to just go up and see what the thermocouples read. Settings were close to what is shown above - bit lower on the HV but magnet the same.
Monday, January 31, 2022, 16:23: Power/sources off. Thermocouple reader off. HV rack open. -AS
Wednesday, February 02, 2022, 07:36: IG1 & Turbo pumps off. - AS |
Monday, February 28, 2022, 08:08, Aaron Schmidt, , LP-SIS, , , , , , Mass marker / Coil-Tube target Test #2
|
Installed & roughing Friday.
Monday, February 28, 2022, 08:07: Turbopump TP1B on.
Monday, February 28, 2022, 09:21: TP1A on.
New thermocouple setup:
|
Rack position |
Multipin position |
Target position |
TC1 |
5,9
|
- |
- |
TC2 |
1,2 |
4,5 |
Right side of Ta oven |
TC3 |
6,7 |
8,9 |
Left side of Ta oven |
Monday, February 28, 2022, 18:57 : Data logging started. Forgot to set interval, not sure what it is at....
PLAN:
Ramp up coil to 50A, record temperatures
Ramp coil down then ramp target and tube to same values as before, record temperatures.
Ramp coil as before.
Tuesday, March 01, 2022, 14:52: Vacuum @ 1.60e-06T. Waterlines opened - AS
Tuesday, March 01, 2022, 14:54: Vacuum ok.
Turbos stopped Wednesday night. Ready to be uninstalled after venting and water purging. |
Monday, March 21, 2022, 13:59, Carla Babcock, , , , , , , , 3rd mass marker test
|
3rd version of the mass marker target has been installed. This one is further back on the heat shield, and has a longer ceramic piece attached. There are three thermocouples as follows:
Thermocouple |
Source tray pins |
Rack position |
Target location |
TC1
|
1,2 |
4,5 |
ceramic feeder tube |
TC2 |
4,5 |
1,2 |
Right side oven |
TC3 |
8,9 |
6,7 |
Left side oven |
Monday, March 21, 2022, 13:55 : Roughing down.
Monday, March 21, 2022, 16:45 : Turbos have been on for a few hours. Starting water.
Monday, March 21, 2022, 17:20 : Only TC1 has to be tested with heating and maybe swapped if it is the wrong way around. Otherwise ready to go.
Thursday, March 24, 2022, 10:51 : Ramping up heaters to test thermocouples.
AS:
Monday, April 04, 2022, 09:10: Power locked out. IG1 & Turbo pumps off. HV top cage removed. |
Monday, April 04, 2022, 20:44, Carla Babcock, , , , , , , , Change from 9-pin connectors to 5-pin connectors
|
Swapped the old 9pin connectors out and replaced with 2 5-pin connectors, same as on the modules.
See attached for current pin out diagram. Many of the wires are too short to reach the bottom sockets, so wires 2, 8, 9 are not connected in the connector. 4 spots are empty on connector 2 (right). (6, 7) and (4, 5) are twisted pairs. Unused wires are tapped up out of the way, but we should improve this, the tape may come loose due to heat and then the wires could present an HV risk. (Update: added some wire to hold them in place. Slightly better...)
Need to either extend the wires, or put in new ones. All wires are grounded on the rack.
In addition, there are two screws in each connector which are floating right now. Need to make a connection for them but should be ok if we dont go to really high voltages. |
Monday, April 04, 2022, 20:56, Carla Babcock, , , , , , , , wiring reverted for cathode-bias FEBIAD
|
Wiring which was changed to run the mass marker tests has been reverted:
- anode bias cable connected to "B"
- tube negative attached to HV common through "B" to "F" connection
Ready for cathode biased FEBIAD operation. |
|