947
|
Wednesday, November 23, 2022, 13:52 |
Aaron Schmidt | | | | | | 44378-14 | In progress | FEBIAD Coil Tests | Sam G. & Navid N.
Work Permit# C2022-11-23--1
Wednesday, November 23, 2022, 13:51 |
|
948
|
Monday, December 05, 2022, 15:41 |
Aaron Schmidt | | | | | | | | Source tray insulator replacement | Monday, December 05, 2022, 15:38:
Source Tray TGHT & TBHT insulators replaced.
Torqued @ 75 in-lbs. (Reference image |
7x |
949
|
Tuesday, December 06, 2022, 11:20 |
Aaron Schmidt | | HP-FEBIAD-CTL | | | 43104-2 | 45235-12 | In progress | New anode routed FEBIAD Tests | Thermocouples installed:
O - O
O - Anode |
|
950
|
Tuesday, December 13, 2022, 16:12 |
Aaron Schmidt | | HP-FEBIAD-CTL | | | 43104-2 | 45235-12 | In progress | New anode routed FEBIAD Test - 2 | Thermocouples installed (X):
O - O
O - Anode |
|
951
|
Friday, December 16, 2022, 10:32 |
Aaron Schmidt | | HP-FEBIAD-CTL | | | 43104-2 | 45235-12 | In progress | New anode routed FEBIAD Test - 3 | Thermocouples installed (X):
O - O
O - Anode |
|
955
|
Thursday, January 12, 2023, 09:04 |
Aaron Schmidt | | LP-SIS | | | 44691-14 | 44378-20 | In progress | | Test for Aurelia L. Empty LP-SIS w/ end
caps in. Right side expanded.
Thermocouples installed (R - L): |
|
956
|
Monday, January 16, 2023, 16:02 |
Aaron Schmidt | | HP-FEBIAD-CTL | | | | | In progress | HP-FEBIAD tests | Extra wraps of foil around the center block
(6) + 3 full wraps around the shield.
Monday, January 16, 2023, 15:40: |
|
957
|
Tuesday, January 17, 2023, 09:48 |
Aaron Schmidt | | | | | | | Problems/Solutions | TMS:RP2 Failure | Tuesday, January 17, 2023, 09:48: TMS:RP2
off. Audible failure was in progress. Also
observable on the strip tool. Vacuum group |
|
958
|
Tuesday, January 31, 2023, 10:42 |
Aaron Schmidt | | LP-SIS | | | 44062-1-SK | 45235-7 | In progress | Conditioning UC#x assembly | SK Series of LP-SIS targets are for conditioning
only.
Tuesday, January 31, 2023, 10:39: |
|
959
|
Thursday, February 02, 2023, 12:44 |
Aaron Schmidt | | LP-SIS | | | 44062-1-SK | 45235-1 | In progress | Conditioning UC#x assembly | SK Series of LP-SIS targets are for conditioning
only.
Thursday, February 02, 2023, 12:41: |
|
960
|
Wednesday, March 29, 2023, 12:22 |
Aaron Schmidt | TiC#5 | LP-FEBIAD | ITE | TM4 | 44692-7 | 45235-20 | Failed | Conditioning TiC#5 | Wednesday, March 29, 2023, 09:15: Roughing.
Wednesday, March 29, 2023, 12:22:
TP1B on. |
|
961
|
Thursday, April 13, 2023, 11:07 |
Aaron Schmidt | | | | | | | In progress | Installation of new IDP-15 TMS:TP2 | IDP15 Scroll Pump, Std w/ inlet.
TMS:RP2
PN: X3815-64010 |
|
962
|
Monday, April 17, 2023, 14:08 |
Aaron Schmidt | TiC#6 | HP-FEBIAD | ITW | TM2 | 44692-10 | 45235-12 | In progress | Conditioning TiC#6 | Monday, April 17, 2023, 14:03: Roughing.
Monday, April 17, 2023, 14:08: BV1A
open. |
|
963
|
Wednesday, April 26, 2023, 08:46 |
Aaron Schmidt | TiC#5 | LP-FEBIAD | ITE | TM4 | 44692-6 | 45235-20 | | Testing TiC#5 assembly w/ an empty target | Anode remade with a ceramic "elbow-cube".
Empty target oven in use for testing.
Wednesday, April 26, 2023, 08:44: |
|
964
|
Monday, May 01, 2023, 14:31 |
Aaron Schmidt | TiC#5 | LP-FEBIAD | ITE | TM4 | 44692-5 | 45235-20 | In progress | Conditioning TiC#5 | New TiC LP-FEBIAD Target installed.
Monday, May 01, 2023, 14:23: Roughing.
Monday, May 01, 2023, 21:42: TP1B |
|
965
|
Friday, May 05, 2023, 06:49 |
Aaron Schmidt | TiC#6 | HP-FEBIAD | ITW | TM2 | 44692-10 | 45235-12 | In progress | Conditioning TiC#6 | Ceramic elbow installed on the anode.
Friday, May 05, 2023, 06:47: Roughing.
Friday, May 05, 2023, 07:24: TP1B |
|
966
|
Tuesday, May 09, 2023, 10:40 |
Aaron Schmidt | SiC#45 | HP-SIS | ITE | TM4 | 44692-3 | 45235-8 | In progress | Conditioning SiC#45 | Tuesday, May 09, 2023, 10:28: Roughing.
Tuesday, May 09, 2023, 11:25: TP1B
on. |
|
967
|
Tuesday, May 16, 2023, 14:00 |
Aaron Schmidt | Ta#65 | LP-SIS | ITE | TM4 | 45220-7 | 45235-2 | In progress | Conditioning Ta#65 | Calibrated window installed on the beam
line.
Tuesday, May 16, 2023, 13:45: Roughing |
|
968
|
Thursday, May 25, 2023, 13:47 |
Aaron Schmidt | | | | | | | | Rough down empty chamber | Thursday, May 25, 2023, 13:47: Roughing. |
|
969
|
Wednesday, May 31, 2023, 15:19 |
Aaron Schmidt | SiC#46 | HP-SIS | | | 44692-2 | 45235-6 | In progress | Conditioning SiC#2023A (Spare, renamed SiC-23B) - No salts | (Spare HP-SIS SiC SiC-23B)
Wednesday, May 31, 2023, 15:18: Roughing.
Thursday, June 01, 2023, |
|
|