  867   Tuesday, March 30, 2021, 13:19 Carla Babcock       Second emittance meter testingEmittance meter number 2 ready for beam
shortly - installed and pumping down.
No beam found by Thursday evening,
 Carla_tune_tracking.docx 
  868   Sunday, April 04, 2021, 14:16 Carla Babcock       Water leak problem persistsIG1 has been spiking randomly, causing
everything to turn off. Looks like the water
leak is still there.
  
  869   Tuesday, April 13, 2021, 13:27 Aaron Schmidt       Indium gaskets installed FS#3Changed the gaskets from C-seals on FS#3
water blocks E, F,& H. G was already
done.
  
  873   Wednesday, May 19, 2021, 16:02 Aaron Schmidt       P2N HS conditioning Parasitic assemblies on the lid & end
plate included. Online HS.
Wednesday, May 19, 2021, 16:00: Roughing.
 HV_test_-_Online_HS_&_parasitic_mods.docx 
  883   Monday, June 28, 2021, 09:22 Aaron Schmidt       Empty ChamberMonday, June 28, 2021, 09:22: Roughing.
Monday, June 28, 2021, 10:10: TP1B
on.
  
  896   Wednesday, August 25, 2021, 15:30 Ferran Boix Pamies       Thermocouple high voltage testWednesday, August 25, 2021, 15:29: Roughing.

Thursday, August 26, 2021,
04:11: IG1 switched on. Vacuum @ 8.35e-06T
  
  897   Tuesday, August 31, 2021, 13:55 Aaron Schmidt       Pump down chamberPump down chamber w/ empty HS   
  900   Thursday, September 23, 2021, 07:16 Aaron Schmidt       Pump down empty chamber & rebootThursday, September 23, 2021, 07:15: Roughing.
Waterline loop installed.

Monday, September 27, 2021,
  
  902   Wednesday, October 06, 2021, 11:56 Aaron Schmidt       Pump down empty chamberWednesday, October 06, 2021, 11:56: Roughing.

Thursday, October 14, 2021,
09:07: Venting.
  
  904   Wednesday, October 20, 2021, 15:01 Aaron Schmidt       Pump down empty chamberWednesday, October 20, 2021, 15:01: Roughing.   
  907   Tuesday, November 16, 2021, 13:45 Aaron Schmidt       Pump down empty chamberTuesday, November 16, 2021, 13:44: Roughing.
Water loop installed. Lock out tag removed.
  
  909   Tuesday, January 04, 2022, 13:00 Aaron Schmidt       Post water leak December 30th, 2021: Water poured
down around Isac test stand and probes lab
  
  910   Wednesday, January 05, 2022, 15:12 Carla Babcock       Modifications to test stand for mass marker testsConnection of TBHT negative to HV common
removed (R4 in circuit diagram). Labelled
and put in MRO bucket.
  
  911   Wednesday, January 12, 2022, 16:12 Carla Babcock       Ramp up of the mass marker targetWednesday, January 12, 2022, 16:08 : HV
ramped to 30kV, EZL=15kV, EE=-1.5kV
Ramping up to 250A on TGHT, 200A
 133CssettingsJan132022.PNG23NasettingsJan132022.PNG23NasettingsJan172022-source.PNG23NasettingsJan172022-beamline.PNG 
  912   Monday, February 28, 2022, 08:08 Aaron Schmidt LP-SIS     Mass marker / Coil-Tube target Test #2Installed & roughing Friday. 
Monday, February 28, 2022, 08:07:
Turbopump TP1B on.
  
  913   Monday, March 21, 2022, 13:59 Carla Babcock       3rd mass marker test3rd version of the mass marker target has
been installed. This one is further back
on the heat shield, and has a longer ceramic
  
  914   Monday, April 04, 2022, 20:44 Carla Babcock       Change from 9-pin connectors to 5-pin connectorsSwapped the old 9pin connectors out and
replaced with 2 5-pin connectors, same as
on the modules.
 5pin_pinout_April42022.png 
  915   Monday, April 04, 2022, 20:56 Carla Babcock       wiring reverted for cathode-bias FEBIADWiring which was changed to run the mass
marker tests has been reverted:

    anode bias cable connected
  
  916   Tuesday, April 05, 2022, 14:01 Aaron SchmidtTest FEBIAD TM2-2022LP-FEBIADITWTM2 42752-5 Test FEBIAD & TS operationTuesday, April 05, 2022, 13:57: Roughing.
BV1B.
Tuesday, April 05, 2022, 14:04: BV1A
 Test_Target_LP-FEBIAD_TM2-2022.docx 
  917   Thursday, April 07, 2022, 11:19 Aaron SchmidtTest FEBIAD TM2-2022 ITWTM2 42752-5 Test FEBAID & TS operation Gas system switched on manually to
use Ar & calibrated leak.
Thursday, April 07, 2022, 10:25:
  