Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 50 of 53  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Statusdown Subject
  867   Tuesday, March 30, 2021, 13:19 Carla Babcock       Second emittance meter testing

Emittance meter number 2 ready for beam shortly - installed and pumping down.

No beam found by Thursday evening, but beam seems to be coming out much differently than last time. Will check on emittance meter functionality and try to re-tune later.

Ramping things down for the next couple days.

 

Saturday, April 03, 2021, 10:41 :

Source heating ramped back up, everything back on. Will try to straighten out steering then see if I can get things back in the previous positions.

 

Saturday, April 03, 2021, 14:59 :

Nothing seems to be working, will vent the beamline and remove the slit.

Saturday, April 03, 2021, 15:36 :

Apparently closing the valve started a vacuum leak that tripped everything in the source. I noticed within the first minute and ramped everything back up, maybe too quickly....

Have now put everything in a holding state, will resume tomorrow.

 

Sunday, April 04, 2021, 14:17 :

Found everything off again this morning. Ramping back up in the hopes that I can get something done before the whole system trips again. The trips look like water leaks again.

Uninstalled the slit and left it in the bottom of the vacuum box. Swapped the window to the computer side for convenience. Seal on the other side on the CF flange is a bit weird, not sure if it is in properly...

 

Sunday, April 04, 2021, 18:43

Still no beam. TISA emittance FC won't come back on, so waiting for Mike Rowe to troubleshoot on Tuesday. Will ramp things down all the way, since I expect the vacuum to trip the source before I need it again.

 

Tuesday, April 06, 2021, 23:43

Found some beam, but looks really weird, like it is cut off. Good enough. Ramped everything down.

Attachment 1: Carla_tune_tracking.docx
  868   Sunday, April 04, 2021, 14:16 Carla Babcock       Water leak problem persists

IG1 has been spiking randomly, causing everything to turn off. Looks like the water leak is still there.


AS - Multiple purges done on RP1 & the backing lines. Some water noted. FS#3 is closed.

Tuesday, April 06, 2021, 09:39: TP1B on.

Tuesday, April 06, 2021, 10:01: TP1A on.

Tuesday, April 06, 2021, 10:12: IG1 on. Vacuum @ 1.97e-05T.

Tuesday, April 06, 2021, 11:00: FS#2, #4, & #5 open. Vacuum @ 5.73e-06T.

Tuesday, April 06, 2021, 11:12: Vacuum @ 5.09e-06T. Open FS#3.

Tuesday, April 06, 2021, 11:17: IG1 @ 4.64e-06T. Open IV4. Reset optics & sources.

Tuesday, April 06, 2021, 11:20: Optics on.


Test were run

Thursday, April 08, 2021, 10:30: Power / sources off.

Thursday, April 08, 2021, 10:34: IG1 & turbo pumps off.

 

  869   Tuesday, April 13, 2021, 13:27 Aaron Schmidt       Indium gaskets installed FS#3

Changed the gaskets from C-seals on FS#3 water blocks E, F,& H. G was already done.

Tuesday, April 13, 2021, 13:23: FS#3 Waterline opened.

Tuesday, April 13, 2021, 13:25: No immediate water noticed visually or on the gloves.

Tuesday, April 13, 2021, 13:31: Visual leak present on (F). Purge the line.

Change the gasket.

Tuesday, April 13, 2021, 14:42: FS#3 Waterline opened.

Tuesday, April 13, 2021, 14:55: No water leak noticed visually or on the gloves.

Tuesday, April 13, 2021, 14:58: Roughing. Will leak check under vacuum tomorrow morning.

Tuesday, April 13, 2021, 16:01: TP1B on. 

Tuesday, April 13, 2021, 20:53: TP1A on. 

Tuesday, April 13, 2021, 20:58: IG1 on. 

 

 

  873   Wednesday, May 19, 2021, 16:02 Aaron Schmidt       P2N HS conditioning

Parasitic assemblies on the lid & end plate included. Online HS.

Wednesday, May 19, 2021, 16:00: Roughing.


Thursday, May 20, 2021, 08:42: Turbo pumps were turned on last night. Vacuum @ 9.99e-07T.

Thursday, May 20, 2021, 08:44: FS#5 open. Vacuum ok.

Thursday, May 20, 2021, 08:45: Power / sources on.

Thursday, May 20, 2021, 09:34: Turbos OFF

Thursday, May 20, 2021, 10:37: Venting.

Thursday, May 20, 2021, 11:28: P2N legs no longer touching. Roughing.

Thursday, May 20, 2021, 12:05: Turbo pump TP1B on.

Thursday, May 20, 2021, 12:10: Turbo pump TP1A on.

LE:

Thursday, May 20, 2021, 15:00: Ramping stared at high warming rate. 10 or 5 A every 15 seconds


Friday, May 21, 2021, 01:31: Around midnight, the P2NHT current was very noisy for few hours, and then it dropped to zero. Turbos are now stopped to open up and investigate.

Friday, May 21, 2021, 05:45 P2N assembly removed, water lines closed and purged - one leg is fully broken

 

FBP:

HV tests Monday 24/05/2021 and Tuesday 25/05/2021

HS was ramped up to 30KV on monday, only 1 spark seen over night. BIAS/EZL/EE : 30KV/14KV/-1.5

Ramping to max HV on Tuesday.

40KV

AS:

Tuesday, May 25, 2021, 11:5: HV tapped down to 0 kV on BIAS / EE / EZL.


Wednesday, May 26, 2021, 07:23: Power / sources off. IG1 off. Turbo pumps off.

Wednesday, May 26, 2021, 09:04: Venting. Waterlines purged.

LE:

Wednesday, May 26, 2021, 10:37 Target removed from test stand and brought to cold lab

 

Attachment 1: HV_test_-_Online_HS_&_parasitic_mods.docx
  883   Monday, June 28, 2021, 09:22 Aaron Schmidt       Empty Chamber

Monday, June 28, 2021, 09:22: Roughing.

Monday, June 28, 2021, 10:10: TP1B on.

Monday, June 28, 2021, 10:22: TP1A on (Tripped)

Monday, June 28, 2021, 10:30: Both turbo pumps off. Leave it under a rough vacuum.


Fernando

Wednesday, June 30, 2021, 15:09 : Venting

  896   Wednesday, August 25, 2021, 15:30 Ferran Boix Pamies       Thermocouple high voltage test

Wednesday, August 25, 2021, 15:29: Roughing.


Thursday, August 26, 2021, 04:11: IG1 switched on. Vacuum @ 8.35e-06T - AS 

Thursday, August 26, 2021, 14:04 Water on, no spike in vacuum. IG1:2.6e-6T

Thursday, August 26, 2021, 14:37 HV rack closed, BIAS EE and EZL power supplies on.

Thursday, August 26, 2021, 15:03 BIAS/EE/EZL 10000/-1000/9000

Thursday, August 26, 2021, 15:08 BIAS/EE/EZL 30000/-1500/13000 1 spark just when reached 30kV.

Thursday, August 26, 2021, 15:28 Series of sparks restarted the controling PC. Back in control BIAS/EE/EZL 48000/-2500/22000

Thursday, August 26, 2021, 15:34 BIAS/EE/EZL 50000/-2500/22000

Thursday, August 26, 2021, 15:48 BIAS/EE/EZL 55000/-2800/24000

Thursday, August 26, 2021, 15:53 Ramping down.

Monday, August 30, 2021, 10:25 turbos off.

 

  897   Tuesday, August 31, 2021, 13:55 Aaron Schmidt       Pump down chamber

Pump down chamber w/ empty HS

  900   Thursday, September 23, 2021, 07:16 Aaron Schmidt       Pump down empty chamber & reboot

Thursday, September 23, 2021, 07:15: Roughing. Waterline loop installed.


Monday, September 27, 2021, 10:35: MB1 off. Turbo pumps, IG, RP, all off/closed. DI water closed/purged.

TS shutdown for planned power outage.


Friday, October 01, 2021, 06:03: Roughing pumps on.

Friday, October 01, 2021, 06:04: Roughing TS beam line side.

Friday, October 01, 2021, 06:52: TMS:TP6 & TMS:TP2 on. Venting Chamber side.

Friday, October 01, 2021, 06:57: IG6 on - Filament 2 manually set. Beam line side vacuum @ 1.5e-05T

Friday, October 01, 2021, 07:01: Vacuum @ 9.04e-06T & dropping steady (Beam line side) OK.

Friday, October 01, 2021, 07:05: Reboot ISAC TS PLC/IOC. Reset controls whiteout.

Friday, October 01, 2021, 07:10: MB1 restart ok.

  902   Wednesday, October 06, 2021, 11:56 Aaron Schmidt       Pump down empty chamber

Wednesday, October 06, 2021, 11:56: Roughing.


Thursday, October 14, 2021, 09:07: Venting.

  904   Wednesday, October 20, 2021, 15:01 Aaron Schmidt       Pump down empty chamber

Wednesday, October 20, 2021, 15:01: Roughing.

  907   Tuesday, November 16, 2021, 13:45 Aaron Schmidt       Pump down empty chamber

Tuesday, November 16, 2021, 13:44: Roughing. Water loop installed. Lock out tag removed.

  909   Tuesday, January 04, 2022, 13:00 Aaron Schmidt       Post water leak

 December 30th, 2021: Water poured down around Isac test stand and probes lab area in service annex extension. problem was traced to a Cracked HVAC coil on SA roof

Fault: 14601 

https://web.accel.triumf.ca/ncr/dbfault.pl?faultno=14601&usertype=unknown&username=&faultgroup=CYCLOTRON&debug=0&btn_submit=Showfault


https://elog.triumf.ca/TIS/Test-Stand/908

Noted on arrival to startup the ISAC TS some cleaning of the area was required. Optics PS & all PS quickly checked. OK / Dry. 

Use caution when HV is to be applied later. Expect conditioning / noise from the cage. 

 

  910   Wednesday, January 05, 2022, 15:12 Carla Babcock       Modifications to test stand for mass marker tests

Connection of TBHT negative to HV common removed (R4 in circuit diagram). Labelled and put in MRO bucket.

Anode connection moved to feedthrough J.

Rewired multipin patch panel. Left some grounded (HVC) wires hanging, should probably make this nice later.

  911   Wednesday, January 12, 2022, 16:12 Carla Babcock       Ramp up of the mass marker target

Wednesday, January 12, 2022, 16:08 : HV ramped to 30kV, EZL=15kV, EE=-1.5kV

Ramping up to 250A on TGHT, 200A on TBHT. See MassMarkerTest#1 for ramp up values of the thermocouples.

Seeing some beam on FC0, changing magnet settings to Cs to check FC6 then will ramp up.

Thursday, January 13, 2022, 14:22 :  1.3e-10 approximately Cs on FC6. Optimal EE -2700V, slightly higher than standard on EZL.

133CssettingsJan132022.PNG

 

 Ramping down to Na on the magnet, found 5 pA:

23NasettingsJan132022.PNG

 Started a ramp up to nominal heater values (TGHT-500 A  TBHT-230 A) but too much HV sparking so aborted at TGHT-299 A and TBHT-230 A. Ramped HV down to 16kV to get sparking to slow down.

Ramped quickly back up to 30kV to get FC readings but since there is so much sparking, we decided to ramp everything down and open the vacuum chamber.

PLAN:

1. ramp down heaters, vent vacuum, open chamber.

2. Try to tape the thermocouples up so that they are further from ground.

3. Try to crimp the bottom of the mass marker tubes, and bend them upwards so they aren't facing ground.

4. Add a dedicated ground to the COIL power supply.

 

 

From Fernando:

image

 


Monday, January 17, 2022, 09:52: IG1 on. Source PS off. HV Cage removed. - AS
Monday, January 17, 2022, 11:11: Cage on. TGHT/TBHT PS on. - AS

Monday, January 17, 2022, 11:23: PS/ Sources on. - AS

Monday, January 17, 2022, 14:00: HV ramped to 20kV, EZL 10kV, EE, -1500V. Ramping TGHT/TBHT to previous values of 250A/200A.

Monday, January 17, 2022, 16:51 : Back to previous heater values, didn't find any Cs on FC6 so went to Na. Tuned and found the tune the opposite of last time, all voltage wanted to go lower. Found 736pA, maybe better than last time because I tuned quite a bit.

23NasettingsJan172022-source.PNG

23NasettingsJan172022-beamline.PNG

Monday, January 17, 2022, 18:00: Ramping to TGHT 300A, TBHT 230A, where we had sparking problems last time.

Monday, January 17, 2022, 18:17 : So far no sparking issues so I will start to heat up the mass markers. One spark about 4 mins after ramping up, after that maybe 10 sparks/40mins or so. Too many....

Monday, January 17, 2022, 19:20 : Got to 20A on the mass markers, will ramp down now.


Friday, January 28, 2022, 18:49 : Yesterday opened the HV rack to re-start data logging on the thermocouples. This morning ramped everything up and started the heaters. Found the Na current around 250A on the target, but abandoned looking for it because the TGHT heating was causing lots of outgassing, which was causing bias sparks. In addition, there is a weird effect where the Na current spikes, then slowly decreases over the course of an hour or something, to values lower than before the heating. Could this be an indication of some thermal issues, like cold spots where things condense? Or something is drifting. The HV common point on the target is at the mass markers now instead of at the exit of the ion source, but I can't imagine you would see such a large difference. The thermocouples do not change in value during these long slow declines. In light of this, decided to just go up and see what the thermocouples read. Settings were close to what is shown above - bit lower on the HV but magnet the same.

 


Monday, January 31, 2022, 16:23: Power/sources off. Thermocouple reader off. HV rack open. -AS


Wednesday, February 02, 2022, 07:36: IG1 & Turbo pumps off.  - AS

  912   Monday, February 28, 2022, 08:08 Aaron Schmidt LP-SIS     Mass marker / Coil-Tube target Test #2

Installed & roughing Friday. 

Monday, February 28, 2022, 08:07: Turbopump TP1B on.

Monday, February 28, 2022, 09:21: TP1A on.

New thermocouple setup:

  Rack position Multipin position Target position
TC1

5,9

 -  -
TC2 1,2  4,5  Right side of Ta oven
TC3 6,7  8,9  Left side of Ta oven

Monday, February 28, 2022, 18:57 : Data logging started. Forgot to set interval, not sure what it is at....

 

PLAN:

Ramp up coil to 50A, record temperatures

Ramp coil down then ramp target and tube to same values as before, record temperatures.

Ramp coil as before.


Tuesday, March 01, 2022, 14:52: Vacuum @ 1.60e-06T. Waterlines opened - AS

Tuesday, March 01, 2022, 14:54: Vacuum ok.


Turbos stopped Wednesday night. Ready to be uninstalled after venting and water purging.

  913   Monday, March 21, 2022, 13:59 Carla Babcock       3rd mass marker test

3rd version of the mass marker target has been installed. This one is further back on the heat shield, and has a longer ceramic piece attached. There are three thermocouples as follows:

Thermocouple Source tray pins Rack position Target location

TC1

1,2  4,5  ceramic feeder tube
TC2 4,5  1,2  Right side oven
TC3 8,9  6,7  Left side oven

 

Monday, March 21, 2022, 13:55 : Roughing down.

Monday, March 21, 2022, 16:45 : Turbos have been on for a few hours. Starting water.

Monday, March 21, 2022, 17:20 : Only TC1 has to be tested with heating and maybe swapped if it is the wrong way around. Otherwise ready to go.

 

Thursday, March 24, 2022, 10:51 : Ramping up heaters to test thermocouples.


AS:

Monday, April 04, 2022, 09:10: Power locked out. IG1 & Turbo pumps off. HV top cage removed.

  914   Monday, April 04, 2022, 20:44 Carla Babcock       Change from 9-pin connectors to 5-pin connectors

Swapped the old 9pin connectors out and replaced with 2 5-pin connectors, same as on the modules.

See attached for current pin out diagram. Many of the wires are too short to reach the bottom sockets, so wires 2, 8, 9 are not connected in the connector. 4 spots are empty on connector 2 (right).  (6, 7) and (4, 5) are twisted pairs. Unused wires are tapped up out of the way, but we should improve this, the tape may come loose due to heat and then the wires could present an HV risk. (Update: added some wire to hold them in place. Slightly better...)

Need to either extend the wires, or put in new ones. All wires are grounded on the rack.

In addition, there are two screws in each connector which are floating right now. Need to make a connection for them but should be ok if we dont go to really high voltages.

Attachment 1: 5pin_pinout_April42022.png
5pin_pinout_April42022.png
  915   Monday, April 04, 2022, 20:56 Carla Babcock       wiring reverted for cathode-bias FEBIAD

Wiring which was changed to run the mass marker tests has been reverted:

  • anode bias cable connected to "B"
  • tube negative attached to HV common through "B" to "F" connection

Ready for cathode biased FEBIAD operation.

  916   Tuesday, April 05, 2022, 14:01 Aaron SchmidtTest FEBIAD TM2-2022LP-FEBIADITWTM2 42752-5 Test FEBIAD & TS operation

Tuesday, April 05, 2022, 13:57: Roughing. BV1B.

Tuesday, April 05, 2022, 14:04: BV1A on.

Tuesday, April 05, 2022, 14:28: TP1B on.

Tuesday, April 05, 2022, 14:36: TP1A on.

Tuesday, April 05, 2022, 14:46: IG1 on.


Wednesday, April 06, 2022, 07:42: Vacuum @ 2.50e-06T.

Wednesday, April 06, 2022, 07:44: Waterlines opened. Vacuum Remains stable.

Wednesday, April 06, 2022, 07:59: Cage fully closed up. Power/sources on.

Wednesday, April 06, 2022, 08:00: COIL / TGHT / TBHT @ 10 A manually. Check - Ok.

Wednesday, April 06, 2022, 08:02: Anode @ 50V - Ok.

Wednesday, April 06, 2022, 08:04: BIAS / EE / EZL @ 1 / -0.5 / 1 kV. Check - Ok.

Wednesday, April 06, 2022, 08:10: BIAS / EE / EZL @ 10 / -1 / 10 kV.

Wednesday, April 06, 2022, 08:16: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Ok. Vacuum @ 2.39e-06T.

Wednesday, April 06, 2022, 08:46: 1/2 hour. Stable.

Wednesday, April 06, 2022, 08:50: All sources off. PS off. Open Cage.

Wednesday, April 06, 2022, 08:54: Begin cycling source gas control.

Wednesday, April 06, 2022, 08:57: SV5 open.

Wednesday, April 06, 2022, 08:58: SV3 & SV4 open. Vacuum stable @2.32e-06T.

Wednesday, April 06, 2022, 09:02: Cage closed. Sources / PS  on. IV4 open.

Wednesday, April 06, 2022, 09:04: Auto-ramping TGHT / TBHT to 350 / 150 @ 2 A per min.

Wednesday, April 06, 2022, 09:05: Anode @ 50 V. Coil @ 10 A.

Wednesday, April 06, 2022, 09:10: Optics set.

Wednesday, April 06, 2022, 11:37: Gas lines closed. Abort ramping. TGHT / TBHT @ 306 / 150 A. HV lockout. Open cage.

***Gas bottles are not in the old configuration*** No gas.

Wednesday, April 06, 2022, 11:50: Begin Auto-cooling @ 2 A per min.


Thursday, April 07, 2022, 08:13: IG1 off. Turbo pumps off. Power off. 

Thursday, April 07, 2022, 09:17: Venting. 

 

 

Attachment 1: Test_Target_LP-FEBIAD_TM2-2022.docx
  917   Thursday, April 07, 2022, 11:19 Aaron SchmidtTest FEBIAD TM2-2022 ITWTM2 42752-5 Test FEBAID & TS operation

 Gas system switched on manually to use Ar & calibrated leak.

Thursday, April 07, 2022, 10:25: Roughing. 

Thursday, April 07, 2022, 11:17: TP1B on.

Thursday, April 07, 2022, 12:55: TP1A on.

Thursday, April 07, 2022, 14:42: SV5 on. Power /  sources on.

Thursday, April 07, 2022, 14:44: IV4 open. Optics on. Vacuum @ 2.7e-06T.

Thursday, April 07, 2022, 14:47: System check:

TGHT / TBHT @ 10 A. Coil @ 10A.

BIAS /  EE / EZL @ 1 / -0.5 / 1 kV. Anode @ 50V

OK. Set.

Thursday, April 07, 2022, 14:49: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.

Thursday, April 07, 2022, 14:51: BIAS /  EE / EZL @ 0 kV. Anode @ 0V


Friday, April 08, 2022, 05:44: Auto-ramping TGHT / TBHT to 500 / 200 A @ 2 A per min.

Friday, April 08, 2022, 05:51: BIAS / EE / EZL @ 20 / -1.0 / 7.5 kV.

Coil @ 20 A, Anode @ 100 V.

Friday, April 08, 2022, 10:01: Auto-ramping TGHT / TBHT to 580 / 270 A @ 2 A per min.

BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Friday, April 08, 2022, 11:15: TBHT @ 290 A. 

Friday, April 08, 2022, 12:09: Mass & wire scans complete. HV to 0kV. Anode to to V. Auto cooling @ 1 A per min. Coil @ 0 A. 


Monday, April 11, 2022, 07:25: Auto-ramping TGHT /TBHT to 580 / 290 A @ 2 A per min.  

Monday, April 11, 2022, 13:48: BIAS / EE / EZL 30 / -1.5 / 13 kV. Mass & wire scans started.

Wire scans good.

Monday, April 11, 2022, 13:58: Controller for TP6 is dead. Literally smokes if you try to use it.

Monday, April 11, 2022, 14:05: HV to 0 kV / Off. IV4 closed. Anode & Coil to 0.


Tuesday, April 12, 2022, 07:14: Vacuum instability noted. 2 spikes to 4.6e-06T. Back to 2.48e-06T. BIAS / EE / EZL 30 / -1.5 / 13 kV. IV4 opened. Coil to 10 A. Anode to 100 V Optics standard tune set.

Mass & wire scans started.

Tuesday, April 12, 2022, 08:16: FM tune used. Mass & wire scans ok. Minor vacuum instability continues. Begin auto-cooling @ 2 A per min.

Tuesday, April 12, 2022, 08:27: Coil, Anode off. HV off. Closed SV5. Closed IV4

 

ELOG V2.9.2-2455