Thursday, May 25, 2023, 13:47, Aaron Schmidt, , , , , , , , Rough down empty chamber
|
Thursday, May 25, 2023, 13:47: Roughing. |
Wednesday, May 31, 2023, 15:19, Aaron Schmidt, SiC#46, HP-SIS, , , 44692-2, 45235-6, In progress, Conditioning SiC#2023A (Spare, renamed SiC-23B) - No salts
|
(Spare HP-SIS SiC SiC-23B)
Wednesday, May 31, 2023, 15:18: Roughing.
Thursday, June 01, 2023, 07:30: TP1B on. |
Thursday, June 08, 2023, 14:22, Aaron Schmidt, , , , , , , , Rough down empty chamber
|
Thursday, June 08, 2023, 14:22: Roughing. |
Monday, July 10, 2023, 15:01, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Monday, July 10, 2023, 15:01: Roughing.
Wednesday, July 12, 2023, 09:38: Venting both chambers. |
Thursday, July 13, 2023, 07:37, Aaron Schmidt, , , , , , , , Tests - Aurelia L
|
Thursday, July 13, 2023, 07:37: Chamber is vented. Beamline is vented. Interlock bypassed on TPS:IV4 - AS |
Thursday, July 13, 2023, 18:29, Aurelia Laxdal, , LP-SIS, , , , , In progress, Spectrometer tests
|
Pumping down: TS loaded with a LP-SIS container for spectrometer test.
Started heating up the target container: up to 300A.
Last week: the LP container was heated up to TGHT 580A and TBHT 230A, and cooled down before the weekend. |
Wednesday, August 09, 2023, 14:29, Aaron Schmidt, , LP-SIS, , , 45220-6, 45235-3, In progress, Graphite target test 1 (C2023A)
|
Graphite
experiment 2: ID Gr-230601, WO#45220-6 ( https://elog.triumf.ca/TIS/Evaporator_2/598 |
Monday, August 14, 2023, 12:11, Aaron Schmidt, , LP-SIS, , , 45220-11, 45235-3, , Graphite target test 2 (C2023B)
|
Graphite experiment insert 1: ID GR-230515, WO#45220-11. https://elog.triumf.ca/TIS/Evaporator_2/622
New disc form. End caps expanded, no Re foil installed. 4 heat shields wrapped around the oven.
Monday, August 14, 2023, 12:04: Roughing. |
Wednesday, August 16, 2023, 11:32, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Wednesday, August 16, 2023, 11:32: Roughing.
Thursday, August 17, 2023, 11:01: Venting. |
Tuesday, August 29, 2023, 12:14, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Tuesday, August 29, 2023, 12:14: Roughing.
Tuesday, August 29, 2023, 13:17: TP1B started.
Tuesday, August 29, 2023, 13:21: TP1B on. |
Thursday, September 28, 2023, 13:42, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Thursday, September 28, 2023, 13:40: Roughing - BB.
Tuesday, October 10, 2023, 14:08: Venting. |
Tuesday, October 10, 2023, 15:46, Aaron Schmidt, Ta#68 (Spare), LP-SIS, , , 45220-3, 45235-11, In progress, Conditioning Ta#68 (Spare)
|
Tuesday, October 10, 2023, 15:18: Roughing.
Tuesday, October 10, 2023, 15:46: TP1B on.
Tuesday, October 10, 2023, 15:52: TP1B at speed. CG1A @ 0.113T & dropping. |
Wednesday, October 18, 2023, 15:43, Aaron Schmidt, , LP-SIS, , , 45447-12, 45235-17, In progress, Conditioning UC#43 (empty) w/ gas line
|
Thermocouples attached on end plate
Indium salt @ 10 µl
3 wraps of Ta HS on oven. Gas line on center block. Empty oven. |
Monday, October 30, 2023, 16:01, Aaron Schmidt, , LP-SIS, , , 45220-2, 45235-13, In progress, HV power surge test plus mass scans
|
Monday, October 30, 2023, 16:00 Roughing
Tuesday, October 31, 2023, 08:58 Turbos on the afternoon before, TP1A timed out which delayed for another 30min turning on both TP. Now
3e-6 Torr in IG1. - FBP |
Thursday, November 16, 2023, 09:43, Aaron Schmidt, , LP-SIS, , , , , In progress, Thermal tests
|
Aurelia has been testing on the ISAC TS since last week. Thermocouples are installed in the end cap, left side & the ionizer.
No elog was initiated, but much has happened.
Site wide power outage on Friday/Saturday caused problems. The TS was running at that time & was also affected. Reboots occurred on the weekend |
Monday, November 27, 2023, 16:09, Ferran Boix Pamies, , LP-SIS, , , 45220-2, 45235-13, In progress, HV power surge test plus mass scans
|
Monday, November 27, 2023, 16:09 Roughing
Monday, November 27, 2023, 17:22 Both turbos are on, leaving vacuum over night.
Tuesday, November 28, 2023, 09:28 after pumping over night IG1 is at .15e-6 T. Water cooling on. |
Tuesday, December 12, 2023, 12:41, Aaron Schmidt, , , , , , , Done, Source Tray / TS inspection
|
Tuesday, December 12, 2023, 12:39: Visual inspection.
Source tray: OK. Minor cracks on insulator near the coil conductor. Small chip in the upper TBHT insulator as well.
Water blocks: No leaks. |
Tuesday, December 12, 2023, 16:11, Dave Neilson, Shunt #0, , , , -, -, , P2N Thermal Test
|
Tuesday, December 12, 2023, 16:07 - Pumping down test stand overnight for testing tomorrow. vacuum good, turbos starting now. Four thermocouples
attached inside. tc1: high on (+) TGHT leg, pins 1+2. tc2: at target terminal (+), pins 4+5. tc3: at target terminal (-), pins 6+7. tc4: low on (+) TGHT
leg, pins 8+9. |
Thursday, January 18, 2024, 10:44, Aaron Schmidt, , , , , , , Done, Thermal tests 2
|
December 18 - January 15. Were not logged. Placed holder. Aurelia's tests. Included thermocouples in the oven & ionizer. |
Thursday, January 18, 2024, 10:47, Aaron Schmidt, , , , , , , Problems/Solutions, FC0 Solenoid Replaced.
|
Issues with valve operations due to a leak in the solenoid valve above FC0. The HPA leak did not allow for sufficient pressure to remain in the lines
to operate. The solenoid as changed this morning.
Thursday, January 18, 2024, 10:32: Roughing. Valves can be cycled. FC0 cycled. OK. |
|