Entry  Tuesday, May 31, 2022, 13:35, Aaron Schmidt, UCx HS, , ITW, TM2, , 44378-19, In progress, Conditioning UC#38 assembly 

Using a broken LP-FEBIAD source. TGHT only.

Tuesday, May 31, 2022, 13:24: Roughing.

Tuesday, May 31, 2022, 13:54: TP1B on.

Tuesday, May 31, 2022, 14:06: TP1A on.

Tuesday, May 31, 2022, 14:13: IG1 on.


Wednesday, June 01, 2022, 07:41: Vacuum @ 2.13e-06T. Waterline FS#5 open.

Wednesday, June 01, 2022, 07:43: Power/Sources on.

Wednesday, June 01, 2022, 07:51: Auto-ramping TGHT to 580A @ 2A per min.


Monday, June 06, 2022, 07:09: Auto-cooling @ 2A per min. 


Wednesday, June 08, 2022, 07:07: Turbo pumps off.

Wednesday, June 08, 2022, 07:53: Venting.

Entry  Saturday, June 18, 2022, 10:04, Aaron Schmidt, SiC#43, HP-FEBIAD, ITW, TM2, 42464-1, 44378-16, In progress, Conditioning SiC#43 SiC#43_Conditioning_-_R.docxER-580-290-30kV-m27.txtSiC#43.docx

Note: SiC#42 replacement.

Saturday, June 18, 2022, 09:54: Roughing.

Saturday, June 18, 2022, 10:08: Data logger removed. Pins 4 & 5 grounded. Power on.

Saturday, June 18, 2022, 10:41: TP1B on.

Saturday, June 18, 2022, 10:48: TP1A on.

Saturday, June 18, 2022, 10:55: IG1 on.

Saturday, June 18, 2022, 11:13: Gases on. Cage closed up. SV5 remains on. SV4 (Argon tank) Closed.

Saturday, June 18, 2022, 11:14: Vacuum @ 2.49e-05T.

Saturday, June 18, 2022, 11:15: Waterline FS#5 opened.

Saturday, June 18, 2022, 11:22: Electrical check w/ IG1 bypass

BIAS / EE / EZL @ 2.5 / -0.5 / 1 kV. Anode @ 100V.

TGHT / TBHT @ 5 A each. Coil @ 5 A.

Saturday, June 18, 2022, 11:23: All checks clear. Bypass removed. Ready for remote operation. Vacuum @ 2.14e-05T

Saturday, June 18, 2022, 21:34: Sources on. Vacuum @ 3.38e-06T. IV4 open. 

Saturday, June 18, 2022, 21:36: Optics on. Standard tune.

Saturday, June 18, 2022, 22:24: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min to out gas overnight.

Saturday, June 18, 2022, 22:55: BIAS / EE / EZL @ 2.5 / -0.5 / 1 kV. Anode @ 100V. Coil @ 10 A. Low settings left as a general electrical check to run as the target heats up.


Sunday, June 19, 2022, 16:37: Vacuum @ 1.60e-06T.

Sunday, June 19, 2022, 16:40: Open SV4 (Argon gas - W/ quick steps on procedure). Vacuum ok.

Sunday, June 19, 2022, 16:42: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min. 

Sunday, June 19, 2022, 19:48: BIAS / EE / EZL / Anode @ 0. Coil to 0. 

Sunday, June 19, 2022, 19:59: Anode tapped up manually to 400 V @ approx 1 V per second. 

Sunday, June 19, 2022, 20:14: Anode tapped up manually to 0 V @ approx 1 V per second.

Sunday, June 19, 2022, 20:14: Coil tapped up manually to 100 A @ approx 1 A per second.

Sunday, June 19, 2022, 20:15: Full Trip. Vacuum limit passed. TGHT / TBHT Went to 0 A

Sunday, June 19, 2022, 20:17: TGHT / TBHT @ 580 / 290 A.

Sunday, June 19, 2022, 20:31: Stable. Vacuum @ 4.21e-06T. 

Sunday, June 19, 2022, 20:58: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Anode @ 100 V. 

Sunday, June 19, 2022, 21:00: Coil @ 10 A. Vacuum @ 3.49e-06T. 

Sunday, June 19, 2022, 21:07: Begin mass & wire scans.

Sunday, June 19, 2022, 21:39: Scans complete.


Monday, June 20, 2022, 05:58: Further mass, wire, & emittance scans.

Monday, June 20, 2022, 06:29: Coil @ 40 A, Anode @ 300 V. Optics set to FM tune.

Monday, June 20, 2022, 06:59: Scans complete. Auto-cooling @ 3 A per min.

Monday, June 20, 2022, 07:03: Coil & Anode to 0 A / 0 V.

Monday, June 20, 2022, 07:07: BIAS / EE / EZL @ 0 kV.

Monday, June 20, 2022, 10:12: IV4 closed.

Monday, June 20, 2022, 10:13: Gases closed. IG1 off. Turbo pumps off.

Monday, June 20, 2022, 11:09: Venting.

Entry  Thursday, July 07, 2022, 16:52, Aaron Schmidt, , LP-IG-LIS, ITW, TM2, , 42132-3, In progress, Conditioning UC#39 assembly 

No UCx target installed. Straight / blank oven in use for out gassing.

Thursday, July 07, 2022, 16:50: Roughing.

Thursday, July 07, 2022, 16:53: BV1A Open.

Thursday, July 07, 2022, 17:31: TP1B on.

Thursday, July 07, 2022, 17:36: TP1A on.

Thursday, July 07, 2022, 17:46: IG1 on. Vacuum @ 2.31e-05T

Thursday, July 07, 2022, 17:47: Waterline FS#5 Opened. Vacuum @ 2.05e-05T & continuing down.

Thursday, July 07, 2022, 18:00: Bypass on IG1. 10A TGHT Check. Ok. Back to 0A. Removed bypass. Ready for remote operation.


Friday, July 08, 2022, 10:44: Started autoramping TGHT 580A/TBHT 0A

Friday, July 08, 2022, 15:37: Autoramping complete


Saturday, July 09, 2022, 07:34 : ramp down started


Sunday, July 10, 2022, 22:14: IG1, TP1B & A off. TP6 has tripped. Sources off.  
 

Entry  Monday, April 17, 2023, 14:08, Aaron Schmidt, TiC#6, HP-FEBIAD, ITW, TM2, 44692-10, 45235-12, In progress, Conditioning TiC#6 

Monday, April 17, 2023, 14:03: Roughing.

Monday, April 17, 2023, 14:08: BV1A open.

Monday, April 17, 2023, 14:32: TP1B on.

Monday, April 17, 2023, 14:38: TP1A on.

Monday, April 17, 2023, 14:47: TP1A Timed out. Restarted it within 30 seconds & it's up to speed. IG1 on.


Tuesday, April 18, 2023, 11:49: Vacuum @ 3.68e-07T. Waterline FS#5 opened. Vacuum stable.

Tuesday, April 18, 2023, 11:52: Power / Sources on.


Tuesday, April 25, 2023, 12:20: Power / Sources off

Tuesday, April 25, 2023, 12:26: IG1 Off. TP1B & TP1A off.

Entry  Friday, May 05, 2023, 06:49, Aaron Schmidt, TiC#6, HP-FEBIAD, ITW, TM2, 44692-10, 45235-12, In progress, Conditioning TiC#6 TiC#6_Anode_&_Coil_checks.docx

Ceramic elbow installed on the anode.

Friday, May 05, 2023, 06:47: Roughing.

Friday, May 05, 2023, 07:24: TP1B on.

Friday, May 05, 2023, 07:34: TP1A on.

Friday, May 05, 2023, 07:43: IG1 on.

Friday, May 05, 2023, 12:12: Vacuum @ 6.91e-06T. FS#5 opened. Vacuum stable.

Friday, May 05, 2023, 12:16: Power/sources on. Gases set

Friday, May 05, 2023, 12:19: Optics on / set.

Friday, May 05, 2023, 12:21: Quick System ready check - OK. Manually set. 

TGHT / TBHT @ 5 / 5 A

BIAS / EE / EZL @ 1 / -0.5 / 1 kV

Anode @ 100 V - 7.326mA

Coil @ 10 A.

Friday, May 05, 2023, 12:23: Ready for operation. All sources back to 0 A / 0 V. Optics remain. Vacuum continues down @ 6.70e-06T.


Monday, May 08, 2023, 08:21: IV4 open.

Monday, May 08, 2023, 08:25: Tap up Anode in steps @ 20 v per 20 seconds.

Anode @ 100 V = 4.884 mA

Anode @ 200 V = 6.105 mA

Anode @ 300 V = 7.326 mA

Anode @ 400 V = 7.326 mA  

Monday, May 08, 2023, 08:42: Anode tapped down to 20 V. 

Monday, May 08, 2023, 08:52: Coil tapped up to 70 A @ 7 A per minute. 

Monday, May 08, 2023, 09:12: Coil tapped back down to 0 A @ 7 A per minute.  

Monday, May 08, 2023, 09:15: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 / 1 A per min.  

Monday, May 08, 2023, 09:20: BIAS / EE / EZL set to 10 / -1.0 / 5 kV. 

Monday, May 08, 2023, 14:37: TGHT / TBHT @ 580 / 290 A. BIAS / EE / EZL set to 30 / -1.5 / 13 kV. 

Monday, May 08, 2023, 14:38: Anode tapped up to 100 V @ 20 V per 20 seconds. Begin mass & wire scans.  

Monday, May 08, 2023, 15:01: Mass & wire scans complete. 

Monday, May 08, 2023, 18:59: Tap up Anode in steps @ 20 v per 20 seconds from 100 V.

Anode @ 100 V = 9.768 mA

Anode @ 200 V = 12.210 mA

Anode @ 300 V = 14.652 mA

Monday, May 08, 2023, 19:05: Anode @ 400 V = 17.094 mA

Monday, May 08, 2023, 19:18: Anode tapped down to 20 V. 

Monday, May 08, 2023, 19:24: BIAS / EE / EZL @ 1 / -0.5 / 1 kV 

Monday, May 08, 2023, 19:35: Coil tapped up to 70 A @ 7 A per minute. 

Monday, May 08, 2023, 19:49: Coil tapped back down to 0 A @ 7 A per minute. Vacuum rose to 6.20e-06T @ 70A. Stabilized back down around 2.24e-06T.

Monday, May 08, 2023, 19:53: Auto-cooling @ 1 A per minute. 


Tuesday, May 09, 2023, 06:59: Anode, & HV sources to 0 V. IV4 closed.

Tuesday, May 09, 2023, 07:35: SV5 closed. Power / sources off.

Tuesday, May 09, 2023, 07:38: IG1 off. TP1B & TP1A off.

Tuesday, May 09, 2023, 08:49: Venting.

Entry  Thursday, July 06, 2023, 16:55, Aaron Schmidt, Nb#10, LP-IG-LIS, ITW, TM2, 45447-7, 42132-2, In progress, Conditioning Nb#10 Nb#10_Conditioning.docx

Thursday, July 06, 2023, 16:13: Roughing.

Thursday, July 06, 2023, 16:41: TP1B on.

Thursday, July 06, 2023, 16:47: TP1A on.

Thursday, July 06, 2023, 16:55: TP1A Trip, reset.

Thursday, July 06, 2023, 16:56: IG1 on.

Thursday, July 06, 2023, 16:58: Vacuum @ 1.32e-05T. Waterline FS#5 open.

Thursday, July 06, 2023, 17:02: Power's on. HV Rack is open.


Friday, July 07, 2023, 06:52: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2A per minute. Vacuum at 5.02e-07T

Attempted to open IV4, however it timed out.

Friday, July 07, 2023, 08:25: IV4 reset & opened.

Friday, July 07, 2023, 09:02: HV on.

Friday, July 07, 2023, 09:40: BIAS / EE / BIAS @ 30 / -1.5 / 13 kV. 

Friday, July 07, 2023, 10:10: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per minute. Vacuum at 6.34e-07T

Friday, July 07, 2023, 10:28: Optics set. FC0 @ 3.36e-11, set from 1uA to 100 nA.

Friday, July 07, 2023, 10:59: Reduce BIAS to 20 kV due to sparking.  

Friday, July 07, 2023, 12:24: BIAS back to 30 kV. TGHT / TBHT @ 580 / 230 A. FC0 @ 2.52e-09. Vacuum @ 1.32e-06T. Beginning mass & wire scans.

Friday, July 07, 2023, 16:57:  BIAS / EE / BIAS @ 0 kV.

Friday, July 07, 2023, 16:59: Vacuum @1.14e-06T. Auto-cooling @ 2 A per min. 

Entry  Friday, August 25, 2023, 17:21, Aaron Schmidt, Nb#11, LP-IG-LIS, ITW, TM2, 45447-9, 42132-4, In progress, Conditioning Nb#11 Nb#11_Conditioning.docx

Replacement for Nb#10

Friday, August 25, 2023, 17:15: Roughing.

Friday, August 25, 2023, 17:57: Vacuum taking a while to rough down. Vacuum @ 1.034T. Opened FS#5.

Friday, August 25, 2023, 17:59: Water leak noted. Venting.

Friday, August 25, 2023, 18:27: The left HS waterline was not tight. Chamber is cleaned out & wiped down.

Friday, August 25, 2023, 18:28: Roughing. Purge on RP1

Friday, August 25, 2023, 19:00: Open closed ballast repeatedly on RP1 to purge excess moisture.

Friday, August 25, 2023, 19:05: FS#5 open. No effect on vacuum. Vacuum @ 2.228T & dropping. Power / sources on.

Friday, August 25, 2023, 19:18: Quick bypass check with "IG1 on". Tapped up TGHT / TBHT to 5 A each, & down again. 500 V on & off the BIAS. ok. Bypass removed. Vacuum @ 1.222T. Will remote start TP later. Allow vacuum to stabilize. Otherwise ready for remote operation.

Friday, August 25, 2023, 23:14: Vacuum @ 0.135T. TP1B on. 

Friday, August 25, 2023, 23:20: TP1B at speed. CG1 @ 0.165 T - Allow to stabilize. 

Friday, August 25, 2023, 23:26: CG1 @ 0.091 T. TP1A on.

Friday, August 25, 2023, 23:36: TP1A Tripped. Reset & restart. TP1B off.


Saturday, August 26, 2023, 00:02: The  TSG:CG1A limit to open needs to be increased from 0.050T to 0.100T. Currently at 0.070T. Unable to restart the TP until it's below the limit. Will wait till morning... Later in the morning.

Saturday, August 26, 2023, 09:19: TP1B switched on. 

Saturday, August 26, 2023, 10:08: TP1A switched on.

Saturday, August 26, 2023, 10:16: TP1 A tripped. Reset right away - CG1A @ 0.048T. 

Saturday, August 26, 2023, 10:17: IG1 on. 

Saturday, August 26, 2023, 16:40: IV4 open.

Saturday, August 26, 2023, 16:41: Optics set. Vacuum @ 5.63e-06T 

Saturday, August 26, 2023, 23:43: Vacuum @ 4.46e-06T. Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per minute. Expecting outgassing however. 


Sunday, August 27, 2023, 09:11: Vacuum @ 5.10e-06T. TGHT / TBHT @ 350 / 150 A. Auto-ramping TGHT to 400 A. 

Sunday, August 27, 2023, 10:44: Abort TGHT @ 383 A. Auto-ramping TGHT / TBHT to 500 / 200 A.

Sunday, August 27, 2023, 19:13: Vacuum @ 5.08e-06T. TGHT / TBHT @ 422 / 189 A. Auto cool TGHT / TBHT to 250 / 100 A @ 4 A per minute.

Sunday, August 27, 2023, 20:06: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. 

Sunday, August 27, 2023, 22:43: Halt auto-ramp @ 490 / 230 A. 

Sunday, August 27, 2023, 22:50: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. 

Sunday, August 27, 2023, 22:52: Begin mass & wire scans. Manually tap up TGHT to 500 A. Vacuum @ 5.36e-06T 

Sunday, August 27, 2023, 23:04: Manually tap up TGHT to 505 A 

Sunday, August 27, 2023, 23:09: Manually tapped up TGHT to 520 A.

Sunday, August 27, 2023, 23:11: Increase TSH auto-ramp vacuum limit from 5.00e-06T to 6.00e-06T. Auto-ramping TGHT to 580 A @ 3A per min.

Sunday, August 27, 2023, 23:25: TGHT up to 554 A . Vacuum limit reached. Take mass & wire scans.

Sunday, August 27, 2023, 23:59: Peak on Mass 40. Otherwise mostly back round.  


Monday, August 28, 2023, 00:02: Reset TSH auto-ramp vacuum limit to 5.0e-06T. Auto-cooling @ 2A per minute.\

Monday, August 28, 2023, 00:09: HV tapped down to 0 V. 

Monday, August 28, 2023, 06:08: IV4 closed. Sources off. 

Monday, August 28, 2023, 06:09: IG1 & turbo pumps off.

Monday, August 28, 2023, 07:30: Power off. Venting. Purge FS#5.

Entry  Monday, September 25, 2023, 16:31, Aaron Schmidt, Ta#66, LP-SIS, ITW, TM2, 45220-5, 45235-9, Done, Conditioning Ta#66 & HV Tests. Ta#66_HV_Test_1.docxTa#66_HV_test_2.docxTa#66_Conditioning.docx

Thermocouples installed on the left end plate x 2.

Monday, September 25, 2023, 16:23: Roughing.

Monday, September 25, 2023, 16:51: TP1B on.

Monday, September 25, 2023, 16:56: Waterline FS#5 open. Vacuum ok.

Monday, September 25, 2023, 16:58: Power on. TP1A on.


Tuesday, September 26, 2023, 09:44: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per minute. 

Tuesday, September 26, 2023, 16:11: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per minute. 

Tuesday, September 26, 2023, 16:12: IV4 opened. 

Tuesday, September 26, 2023, 16:45: Optics on/set. BIAS / EE / EZL @ 1 / -0.5 / 1 kV. TC @ 47 / 51 C

Tuesday, September 26, 2023, 21:00: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Spark @ 28 kV.

Tuesday, September 26, 2023, 21:41: Mass & wire scans taken. Masses from 110 to 160? Curious. 


Wednesday, September 27, 2023, 08:24: TC @ 71 / 79 C. 

Wednesday, September 27, 2023, 11:57: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.

Wednesday, September 27, 2023, 12:06: BIAS / EE / EZL @ 40 / -2.0 / 17 kV. Spark right after.

Wednesday, September 27, 2023, 12:23: Recovered computer & epics controls from previous spark.

Wednesday, September 27, 2023, 12:36: BIAS / EE / EZL @ 45 / -2.3 / 19 kV. Spark @ 44.5 kV.

Wednesday, September 27, 2023, 13:17: Large spark *

Wednesday, September 27, 2023, 13:21: Closed IV4. Reset TSG:TP1B. TMS:TP6 Spinning up? Did not reset right away. Reset optics. Epics & Firefox on the TS computer are down. 

Wednesday, September 27, 2023, 13:26: BIAS / EE / EZL @ 40 / -2.0 / 17 kV. Plus 1 spark while tapping the HV down. TMS:TP6 has recovered.

Wednesday, September 27, 2023, 14:01: HV to 0 kV. TS computer is disconnected from the network but epics is still running. 

Wednesday, September 27, 2023, 14:05: TC @ 69.8 / 81 C


Thursday, September 28, 2023, 09:23: TS computer is running again. Continue HV  tests.

Thursday, September 28, 2023, 09:31: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Thursday, September 28, 2023, 09:47: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.

Thursday, September 28, 2023, 10:43: No sparks thus far.

Thursday, September 28, 2023, 10:46: BIAS / EE / EZL @ 45 / -2.3 / 19 kV.

Thursday, September 28, 2023, 10:50: Gauge for FEBIAD gases is "buzzing".

Thursday, September 28, 2023, 10:52: BIAS / EE / EZL @ 47.5 / -2.5 / 20 kV.

Thursday, September 28, 2023, 11:35: No sparks occurred. BIAS / EE / EZL @ 0 kV.

Thursday, September 28, 2023, 11:41: PS off. IV4 closed. 

Thursday, September 28, 2023, 11:42: IG1 off. Turbo pumps off.

Thursday, September 28, 2023, 12:35: Venting.

 

Entry  Tuesday, April 09, 2024, 16:01, Aaron Schmidt, Empty (Online), LP-FEBIAD, ITW, TM4, 45447-24, 42972-8, In progress, Conditioning empty FEBIAD for online use EE_issue_-_Conditioning_LP-FEBIAD_ITW-TM4.docx2024_-_ITW-_TM4_LP_FEBIAD.docx

Tuesday, April 09, 2024, 15:25: Roughing.


Wednesday, April 10, 2024, 05:41: TP1B on. 

Wednesday, April 10, 2024, 05:47: TP1A on. 

Wednesday, April 10, 2024, 06:01: IG1 on. 

Wednesday, April 10, 2024, 12:21: Waterline FS#5 open. Vacuum stable @ 1.23e-06T.

Wednesday, April 10, 2024, 12:25: Power / sources on.

Wednesday, April 10, 2024, 12:32: TGHT / TBHT @ 5/5A tapped up & back down manually. Ok.

Wednesday, April 10, 2024, 12:33: Anode @ 25 V, Coil @ 10 A. Tapped up & down manually. Ok.

Wednesday, April 10, 2024, 12:35: BIAS / EE / EZL @ 1 / -0.5 / 1 kV. Tapped up & down manually. Ok.

Wednesday, April 10, 2024, 12:37: Vacuum @ 1.19e-06T. Ok, but will allow to drop further.


Thursday, April 11, 2024, 10:21: Gas lines open.

Thursday, April 11, 2024, 10:34: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Thursday, April 11, 2024, 10:38: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.

Thursday, April 11, 2024, 10:41: Significant sparking for about 5 seconds. BIAS / EE / EZL @ 43 / -2.0 / 19 kV.

Thursday, April 11, 2024, 10:42: BIAS / EE / EZL @ 45 / -2.0 / 19 kV.

Thursday, April 11, 2024, 10:46: BIAS / EE / EZL @ 47.5 / -2.2 / 22 kV. Sparking again. On the spark gap.

Thursday, April 11, 2024, 10:56: BIAS / EE / EZL @ 50 / -2.5 / 25 kV.

Thursday, April 11, 2024, 11:26: 30 minutes @ 50 kV. 2 sparks in that time. The second spark tripped the optics & IG6. They were reset.

Thursday, April 11, 2024, 11:31: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Thursday, April 11, 2024, 11:38: HV tapped to 0 kV.

Thursday, April 11, 2024, 11:39: Vacuum @ 8.27e-07T.

Thursday, April 11, 2024, 13:03: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Vacuum @ 8.16e-07T.

Thursday, April 11, 2024, 13:26: Coil @ 80 A. Tapped up manually at 4 A per min approx.

Thursday, April 11, 2024, 13:28: Vacuum @ 1.01e-06T

Thursday, April 11, 2024, 13:57: Vacuum @ 2.96e-06T

Thursday, April 11, 2024, 14:19: Coil @ 0 A.

Thursday, April 11, 2024, 14:21: Anode @ 100 V.

Thursday, April 11, 2024, 14:22: Anode @ 200 V.

Thursday, April 11, 2024, 14:24: Anode @ 500 V.

Thursday, April 11, 2024, 14:28: Anode @ 0 V.

Thursday, April 11, 2024, 14:32: HV to 0 kV.


Friday, April 12, 2024, 06:30: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min. 

Friday, April 12, 2024, 13:23: Auto-ramping aborted. TGHT @ 556 A, Vacuum @  4.94e-06T. Allow 20 min for stabilization.

Friday, April 12, 2024, 13:44: Auto-ramping TGHT to 580 A @ 2 A per min. Vacuum @ 4.57e-06T. 

Friday, April 12, 2024, 14:15: Aborted auto-ramp. Vacuum @ 5.20e-06T. Will manually tap up. 

Friday, April 12, 2024, 14:32: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Vacuum @ 5.31e-06T. The extraction electrode is acting up. Doubling the voltage on what is input. Add 50 V on the slider, 100 V will go to the readback. 

Friday, April 12, 2024, 14:49: HV back to 0 kV. 

Friday, April 12, 2024, 15:12: EE Troubleshooting. Cage open & multiple tests to adjust the voltage.

Friday, April 12, 2024, 15:19: Auto-cooling @ -2 A per min 

Entry  Wednesday, April 17, 2024, 14:16, Aaron Schmidt, Empty (Online), LP-FEBIAD, ITW, TM4, 45447-24, 42972-8, In progress, Conditioning empty FEBIAD for online use - Run 2 2024_-_ITW-_TM4_LP_FEBIAD_-_2.docx

https://elog.triumf.ca/TIS/Test-Stand/1003

EE Issue resolved. TS closed up.

Wednesday, April 17, 2024, 14:08: IV4 opened. Vacuum @ 5.26e-07T.

Wednesday, April 17, 2024, 14:12: TGHT / TBHT manually tapped up to 5 / 5 A.

Wednesday, April 17, 2024, 14:13: BIAS / EE / EZL @ 2.5 / -1.0 / 1.0 kV. Ok.

Wednesday, April 17, 2024, 14:15: Anode to 100 V. Ok. Coil PS is still.

Wednesday, April 17, 2024, 14:19: Rear cage reopened. Coil PS on. Coil @ 5 A. Ok. Gas on in the morning.

Wednesday, April 17, 2024, 14:21: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min. Coil back to 0 A.


Thursday, April 18, 2024, 05:57: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min. 

Thursday, April 18, 2024, 08:26: Gas lines purged & reopened full of Ar.

Thursday, April 18, 2024, 08:39: Optics set with common tune.

Thursday, April 18, 2024, 08:48: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Thursday, April 18, 2024, 08:50: Begin mass & wire scans w/o Anode & Coil

Thursday, April 18, 2024, 08:55: MB1 appears to be tripped & out of sync.

Thursday, April 18, 2024, 08:57: Switched MB1 PS off, controller off. Restart them. PS on, then controller. Reset on epics & Can Diagnostics TMS:HallMB1 (cfg)

Thursday, April 18, 2024, 08:59: MB1 ready. Continue testing / mass scan.

Thursday, April 18, 2024, 09:37: Anode to 100 V. Coil to 20 A.

Thursday, April 18, 2024, 10:15: Set optics to Dave's previous tune.

Thursday, April 18, 2024, 10:49: Primary mass & wire scans set complete.

Thursday, April 18, 2024, 11:01: Anode & Coil to 0. Scanning w/ Dave's previous tune.

Thursday, April 18, 2024, 11:52: BIAS / EE / EZL to 0 kV. Gas lines closed. IV4 closed.

Thursday, April 18, 2024, 11:53: Begin auto-cooling @ 2 A per min.


Friday, April 19, 2024, 06:56: Power off. IG1 off. TP1B & TP1A off.  

Friday, April 19, 2024, 09:03:   VV1 open -  venting 

Entry  Friday, April 26, 2024, 13:49, Aaron Schmidt, TiC#7, HP-FEBIAD, ITW, TM4, 45447-5, 45235-15, In progress, Conditioning TiC#7 

FM-SW calibrated leak installed.

Friday, April 26, 2024, 13:48: Roughing.

Friday, April 26, 2024, 14:20: TP1B started.

Friday, April 26, 2024, 14:26: TP1B Green. OK.

Friday, April 26, 2024, 14:30: TP1A on.


Monday, April 29, 2024, 08:44: Vacuum @ 4.58e-07T. Waterline FS#5 open. Vacuum ok.

Monday, April 29, 2024, 08:50: Power / sources on. Tap up check. TGHT / TBHT to 5 / 5 A. BIAS / EE / EZL to 1 / -0.5 / 1 kV. Anode to 100 V. Coil to 4 A. Ok. Tap back down.

Monday, April 29, 2024, 10:44: IV4 open.

-BB:

Monday, April 29, 2024, 11:07: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Monday, April 29, 2024, 11:12: BIAS / EE / EZL @ 40 / -1.8 -2.0 / 17 kV.

Monday, April 29, 2024, 11:19: BIAS / EE / EZL @ 43 / -2.0 / 19 kV.

Monday, April 29, 2024, 11:23: BIAS / EE / EZL @ 45 / -2.0 / 19 kV.

Monday, April 29, 2024, 11:27: BIAS / EE / EZL @ 47.5 / -2.2 / 22 kV.

Monday, April 29, 2024, 11:33: BIAS / EE / EZL @ 50 / -2.5 / 25 kV.

Monday, April 29, 2024, 12:05: 30 minutes @ 50 kV. 3 sparks at the very end. 2 inside and 1 outside.

Monday, April 29, 2024, 12:09: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Vacuum @ 4.67e-07T. Start tapping up coil.

Monday, April 29, 2024, 12:32: Coil @ 80 A. Tapped up manually at 4 A per min approx. Vacuum @ 5.2e-07T

Monday, April 29, 2024, 14:00: Vacuum @ 7.20e-07T (30-60 min depending on whether the out gassing levels or begins to decrease)

Monday, April 29, 2024, 14:02: Coil @ 0 A.

Monday, April 29, 2024, 14:05: Anode @ 100 V.

Monday, April 29, 2024, 14:07: Anode @ 200 V.

Monday, April 29, 2024, 14:09: Anode @ 500 V.

Monday, April 29, 2024, 14:11: Anode @ 0 V.

Monday, April 29, 2024, 14:33: HV @ 0 V.

Monday, April 29, 2024, 14:34: Auto-ramping TGHT / TBHT to 350 / 150 @ 2A per minute.


Tuesday, April 30, 2024, 07:18: Auto-ramping TGHT / TBHT to 580 / 290 @ 2A per minute. 

Tuesday, April 30, 2024, 13:44: Gas lines purged & refilled with Ar.

Tuesday, April 30, 2024, 13:48: optics set.

Tuesday, April 30, 2024, 13:51: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Tuesday, April 30, 2024, 13:56: Anode @ 100 V. Coil @ 20 A

Tuesday, April 30, 2024, 13:59: Reset / Cfg MB1

Tuesday, April 30, 2024, 14:40: Initial mass & wire scans complete.

Tuesday, April 30, 2024, 15:07:  Argon gas lines purged. 

Tuesday, April 30, 2024, 15:07:  Mass scan repeated.

Tuesday, April 30, 2024, 15:42:   Gas on. Magnet set to 40.1 mass/charge. Anode & coil vs fc6 output optimization scan started. 0-90A coil and 0-400V anode.

Tuesday, April 30, 2024, 15:55:   Vacuum is noticeably rising. If it reaches 5e-6T, will terminate the scan.

Tuesday, April 30, 2024, 15:59:  rate of increase appears to be slowing and reaching a plateau.

Tuesday, April 30, 2024, 16:01:    optimization data at measure_id=6058.  image at bottom.

Tuesday, April 30, 2024, 16:03: COIL and anode set to 0. decreasing BIAS/EZL/EE to 0V

Tuesday, April 30, 2024, 16:12: decreasing TGHT TBHT at 1A/30s to 0

 Wednesday, May 01, 2024, 09:38:   TP1B and TP1A turned off, winding down

 Wednesday, May 01, 2024, 10:1: VV1 open, venting.  Water cooling off. purged lines

 

 

 

Entry  Wednesday, July 31, 2024, 18:50, Aaron Schmidt, TiC Spare, HP-FEBIAD, ITW, TM4, 45447-2, 42752-7, In progress, Conditioning Spare for TiC#7 

Wednesday, July 31, 2024, 18:47: Roughing.

Wednesday, July 31, 2024, 19:24: TP1B on.

Wednesday, July 31, 2024, 19:30: TP1B at speed. Backing pressure CG1A @ 0.212T.

Wednesday, July 31, 2024, 19:33: TP1A Started. CG1A @ 0.164T.

Wednesday, July 31, 2024, 19:41: TP1A at speed. Whining a bit, but it's alive.

Wednesday, July 31, 2024, 19:42: IG1 on.


Thursday, August 01, 2024, 08:00: Vacuum @ 3.14e-0T. Waterline FS#5 open. Vacuum ok. CG1A @ 0.028T.

Thursday, August 01, 2024, 08:04: IV4 open.

Thursday, August 01, 2024, 08:09: Cage closed up. PS / Sources on. Note* TGHT/TBHT breakers were on. Anode was off. All "On" now.

Thursday, August 01, 2024, 08:13: Manual tap up checks. TGHT / TBHT @ 5 / 5 A. Anode @ 100 V / 15.873 mA. Coil PS acting up. Set to 7 A, displays 9.87A & fluctuates.

Thursday, August 01, 2024, 08:19: Anode to 0 V. Coil reduced to 0 A, however still reads back 4.15 A on epics. PS @ 0A.

Thursday, August 01, 2024, 08:24: Cage open. HV sources off. Coil back to 7A. Epics shows 9.82-10.11A (Blue). Fluctuates, PS direct reading @ 7A - Steady.

Thursday, August 01, 2024, 08:39: Cage closed up. HV sources back on.

Thursday, August 01, 2024, 08:40: BIAS / EE / EZL set to 1 / -0.5 / 1 kV. Anode to 100 V / 15.873 mA. Coil remains @ 7A. Epics 10.35A (Blue) Fluctuates still. PS direct reading @ 7A.

Thursday, August 01, 2024, 08:49: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Thursday, August 01, 2024, 08:54: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.

Thursday, August 01, 2024, 08:56: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.

Thursday, August 01, 2024, 08:57: 1 Spark. External - Audible.

Thursday, August 01, 2024, 09:01: Anode @ 200 V / 17.094 mA. Vacuum @ 2.75e-06T.

Thursday, August 01, 2024, 09:04: Anode @ 300 V / 18.315 mA.

Thursday, August 01, 2024, 09:05: Anode @ 400 V / 19.536 mA.

Thursday, August 01, 2024, 09:05: Anode @ 500 V / 20.757 mA. Interesting, the coil epics read back (Blue) moved to 6.98 (7) A.The coil read back stability appears to have occurred in conjunction with the 8:57am spark*.

Thursday, August 01, 2024, 09:17: 20 min stable. Can assume the spark was the coil instability discharging. Coil remain stable reading @ 7A. BIAS / EE / EZL @ 40 / -2.0 / 17 kV (20 min). Anode @ 500 V / 19.536 mA. (10 min+).

Thursday, August 01, 2024, 09:29: BIAS / EE / EZL to 0 kV. Anode to 0.

Thursday, August 01, 2024, 09:36: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 @ per min.

Thursday, August 01, 2024, 09:37: Tap up coil to 10 A. Stable. Read back on all ends match up.

Thursday, August 01, 2024, 09:39: Coil @ 20 A. Stable. Hold. Vacuum @ 2.66e-06T.

Thursday, August 01, 2024, 10:05: Coil @ 30 A. Vacuum @ 2.66e-06T.

Thursday, August 01, 2024, 10:13: Coil @ 40 A. Vacuum @ 2.68e-06T.

Thursday, August 01, 2024, 10:18: Coil @ 50 A. Vacuum @ 2.66e-06T.

Thursday, August 01, 2024, 10:24: Coil @ 60 A. Vacuum @ 2.66e-06T.

Thursday, August 01, 2024, 10:27: Coil @ 70 A. Vacuum @ 2.77e-06T.

Thursday, August 01, 2024, 10:32: Coil @ 80 A. Vacuum @ 3.03e-06T. Note* Coil was cleaned prior to installation & acrylic within dissolved. Successful run on coil.

Thursday, August 01, 2024, 10:43: Coil to 0 A. However in the last 20 A, the read back & epics did not match again. Slowly discharging on epics, although the PS read back was accurate.

Thursday, August 01, 2024, 13:29 FBP:  Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min . IG1:3.56e-6.

Thursday, August 01, 2024, 16:00: AS - Aborted target ramping. TGHT / TBHT @ 448 / 248 A. Vacuum limited at 5.0e-06T. Allow to out gas. Continue tomorrow am.


Friday, August 02, 2024, 06:01: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min. Vacuum: 1.60e-06T.

Friday, August 02, 2024, 08:28 turning on HV

Friday, August 02, 2024, 08:35 BIAS / EE / EZL @ 30 / -1.5 / 13 kV. No issues.

Friday, August 02, 2024, 08:40 Same kind of sparks as the previous thin foil Ta observed

Friday, August 02, 2024, 08:49 Bias lowered to 20kV

Friday, August 02, 2024, 10:39 HV issues could not be identified, we recorded some sparks from within the target near the multipin and TBHT. Outgassing coil and running mass scan. Source tray to be thoroughly checked after retrieving the target. 

Friday, August 02, 2024, 15:04  gradually increased COIL current to 100A over time while monitoring vacuum to ensure no heater trips. Vacuum now at 2.4e-6 T

Friday, August 02, 2024, 15:05 increasing BIAS / EE / EZL to 30 / -1.5 / 13 kV 

Friday, August 02, 2024, 15:26   now at  BIAS / EE / EZL to 30 / -1.5 / 13 kV  --- first spark at 30kV. 

Friday, August 02, 2024, 15:37   sparking occurring at 4-5min intervals. set anode to 120V, coil to 40A. finding Ar peak via scan.   Argon operated at 0.5 bar.

Friday, August 02, 2024, 15:57   Ar peak located at 95.5332A. on magnet. tested gas on / off to confirm - current at FC6 = 1.37 nA

Friday, August 02, 2024, 16:02  ran febiad coil/anode scan. 

Friday, August 02, 2024, 16:33  data at test number = 7462 can be further visualized using the shared jupyter notebook code.  data taken at anode voltage 260V was disrupted due to a spark derailing a number of optics elements in the beamline. they were soon corrected, but this data was missed.

 Friday, August 02, 2024, 16:34   -   mass scan with  180V 70A      (Argon ON) ---- doesn't seem to be recording background noise well. ie the common background recording artifact is present. records constant numbers instead of numbers in range (1e-13,5e-12). often appears in mass scan image at slants 

Friday, August 02, 2024, 17:07    -   mass scan rerun after switching off argon and pumping down the lines. however, only run from mass 49 down, as the signal above was completely blank

Friday, August 02, 2024, 17:25  ramping down bias ee and ezl

 Friday, August 02, 2024, 17:45  decreasing TGHT and TBHT to 0a at 1A/30s

 

 

 

 

Entry  Tuesday, September 10, 2024, 16:24, Dave Neilson, TiC #24D, HP-SIS, ITW, TM3, 45447-27, 45235-25, , Back up target testing and conditioning 2024-09-11_HPTiC-24D_target_characterization.docx

Tuesday, September 10, 2024, 16:21:   Target installed in test stand by Brady

Tuesday, September 10, 2024, 16:21: roughed down and turbo pumps now on.

Tuesday, September 10, 2024, 20:27   Pressure at 4.9e-6, increasing TGHT TBHT to 580A/230A at 1A/30s

Wednesday, September 11, 2024, 10:00 The TGHT TBHT parameters were mistakenly reversed during heating. TBHT was dropped to 230A and TGHT increased to 580A at 1A/30s.

Wednesday, September 11, 2024, 13:50 TGHT TBHT at 580 230.  Increasing BIAS/EE/EZL to 30/2.5/13 kV.

Wednesday, September 11, 2024, 14:36 At high voltage, on FC0 there is an output beam current of 1.85e-7 A.

Wednesday, September 11, 2024, 14:49 Mass scan recorded.   2024-09-11 HPTiC-24D - scan 1.txt ... FC6 problem with recording background level data persists

Wednesday, September 11, 2024, 15:53  increasing BIAS and EZL to condition high voltage 

Wednesday, September 11, 2024, 16:32 at 37kV (EZL 22kV), TGHT timed out and cut the current to the target. I elected to leave it cold rather than suddenly reheating it, and am cooling down TBHT at -1A/30s, while continuing to increase BIAS for conditioning.

there have been no sparks at all and I'm unsure of what precipitated this event. None of the 'trip indicators' on the TGHT panel lit up during this event. I will bring this up with Keiko/Roberto tomorrow Sept 12.

 

Wednesday, September 11, 2024, 17:06  one spark occurred at 49kV

 Wednesday, September 11, 2024, 17:15  now at 50kV, EZL at 33kV.  Over 30 minutes there was just one spark at the HV bias.

Wednesday, September 11, 2024, 17:50  decreasing high voltage elements to 0 0 0. 

Entry  Tuesday, October 29, 2024, 18:25, Aaron Schmidt, UC#46 (assembly only), LP-IG-LIS, ITW, TM4, , 42972-6 / 39956-1, In progress, Conditioning UC#46 Assembly 

 42972-6 Base / 39956-1 Lid

Tuesday, October 29, 2024, 18:20: Roughing. 

Tuesday, October 29, 2024, 18:52: TP1B on. 

Tuesday, October 29, 2024, 18:58: TP1A on.

Tuesday, October 29, 2024, 19:06: IG1 on.


Wednesday, October 30, 2024, 07:23: Vacuum @ 8.25e-07T. Waterline FS#5 open.

Wednesday, October 30, 2024, 07:25: Power on.

Wednesday, October 30, 2024, 07:32: PS for TGHT keeps timing out? Goes red. Won't start. 

Tapped up TBHT to 10 A. TGHT?

Wednesday, October 30, 2024, 08:20: Manually cycled the PS. No longer trips.

Tapped up TGHT to 5 A. OK

Wednesday, October 30, 2024, 08:26: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

Wednesday, October 30, 2024, 14:32: Auto-cooling @ 2 A per min.

 


Thursday, October 31, 2024, 08:30: TP/ IG1 off. 

Thursday, October 31, 2024, 12:52: Venting. 

Entry  Wednesday, September 14, 2011, 15:40, Anders Mjos, TaC#1, LP-SIS, ITE, TM1, 38634-6, 36833-6, In progress, TaC#1 installed and pumping down. 

Wednesday, September 14, 2011, 15:39: Vacuum at 1.3e-5 torr 

Thursday, September 15, 2011, 08:59: Vacuum at 2.9e-7 torr. Water flowing and vacuum stable. 

Entry  Friday, September 16, 2011, 12:39, Aurelia Laxdal, TaC#1, LP-SIS, ITE, TM1, 38634-6, 36833-6, In progress, HV conditioning 

Started the HV conditioning: TSG:BIAS=30kV and TSH:EE=-700V.

Entry  Monday, September 19, 2011, 09:11, Aurelia Laxdal, TaC#1, LP-SIS, ITE, TM1, 38634-6, 36833-6, In progress, Started target and tube heaters.  

Heaters conditioning went fine: 580A and 230A.

Did a mass scan:

Plotdump-local-clean.txt Sept19 11 12-45-22.txt

Set for Li-7 for over the night on TMS:FC6.

Entry  Tuesday, September 20, 2011, 19:00, Aurelia Laxdal, TaC#1, LP-SIS, ITE, TM1, 38634-6, 36833-6, Done, Finished testing TaC#1 

Tuesday, September 20, 2011:

Did another mass scan today at 5:40. Saved as: plotdump-local-clean.txt Sept 20 11 11-51-20.txt

Started target cool-down. Tomorrow the target would be ready to be removed from the Test Stand.

Wednesday, September 21, 2011:

Turned off the HV & optics.

Target is ready to be removed. Currently, it's under vacuum and the water is still on.

 

Entry  Friday, September 23, 2011, 16:42, Anders Mjos, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, In progress, Target ready to be heated 

Friday, September 23, 2011, 16:4: Target installed and roughing started.

Friday, September 23, 2011, 17:12: Started turbo pumps. 

Monday, September 26, 2011, 09:00: Opened up water flow. Vacuum rose from 3e-6 to 3e-5 torr in 30 s. Closed water flow.

Monday, September 26, 2011, 09:00: Venting for leak check.

Monday, September 26, 2011, 10:20: Pressurized water lines with 120 PSI He. Leak detected on right water line connection to heat shield.

Monday, September 26, 2011, 12:00: Leak repaired. Pumping down. Kapton added on target  heater cooling line to prevent short with cooling line for FEBIAD coil.

Monday, September 26, 2011, 12:47: Started turbo pumps. 

Monday, September 26, 2011, 15:45: Opened up water flow. Vacuum stable at 3.5e-6 torr.Target ready to be heated.

Entry  Wednesday, September 28, 2011, 14:11, Friedhelm Ames, SiC#26, , ITE, TM4, , , , gas system checked and pumped 

The gas system has been checked. The variable valve opens at about 7.55 very fast. Please be careful when using it. Stepsize for opening around this value should be 0.01. Gas lines have been pumped with pump in the high voltage rack. Ne leak was opened to release pressure.