ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
686
|
Friday, September 21, 2018, 11:41 |
Aaron Schmidt | UC#26 | LP-IG-LIS | ITE | TM4 | | 42132-1 | In progress | Conditioning Heat Shield for UC#26 | Friday, September 21, 2018, 11:40: Roughing
Friday, September 21, 2018, 11:41: Doors sealed for roughing.
Friday, September 21, 2018, 14:02: Turbos on.
Monday, September 24, 2018, 08:05: Waterlines opened. No response on RGA. Vacuum ok @ 4.23-e07T
Monday, September 24, 2018, 08:12: Power / sources on.
Monday, September 24, 2018, 08:15: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.3 |
3.92 |
TBHT |
24.2 |
3.11 |
COIL + EE |
24.1 |
5.15 |
TGHT |
24.3 |
5.80 |
Monday, September 24, 2018, 13:45: Vacuum ok @ 6.47e-07T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.7 |
4.06 |
TBHT |
24.9 |
3.11 |
COIL + EE |
24.7 |
5.18 |
TGHT |
27.0 |
5.83 |
Friday, September 28, 2018, 09:59: Auto-cooling @ 2A per min.
Tuesday, October 02, 2018, 08:32: Power / Sources off.
Tuesday, October 02, 2018, 08:37: Purge waterlines & empty DI bucket.
Tuesday, October 02, 2018, 08:38: RGA off. Ion gauge, turbo pumps off. |
685
|
Monday, September 17, 2018, 11:52 |
Aaron Schmidt | UC#25 | LP-SIS | ITW | TM2 | | 42752-9 | In progress | Conditioning Heat Shield for UC#25 | Monday, September 17, 2018, 11:47: Roughing*. Doors not sealing, help acq'd
Monday, September 17, 2018, 11:51: Roughing. Doors sealed
Monday, September 17, 2018, 12:30: Turbo pumps started.
Monday, September 17, 2018, 14:09: RGA on.
Tuesday, September 18, 2018, 09:01: Waterlines opened. No response on RGA. Vacuum ok @ 5.92e-07T.
Tuesday, September 18, 2018, 09:02: Power on
Tuesday, September 18, 2018, 09:05: Sources on.
Tuesday, September 18, 2018, 09:08: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.8 |
4.02 |
TBHT |
24.4 |
3.11 |
COIL + EE |
24.6 |
5.15 |
TGHT |
24.6 |
5.79 |
Wednesday, September 19, 2018, 08:14: Vacuum @ 7.73e-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
34.8 |
4.02 |
TBHT |
24.7 |
3.10 |
COIL + EE |
24.9 |
5.13 |
TGHT |
26.8 |
5.77 |
Wednesday, September 19, 2018, 14:30: Auto-cooling @ 2A per min.
Friday, September 21, 2018, 07:52: Power / Sources off.
Friday, September 21, 2018, 07:53: RGA off. Ion Gauge off. Turbo pumps off.
Friday, September 21, 2018, 07:56: Waterlines purged. TS locked out.
|
676
|
Friday, July 27, 2018, 14:44 |
Aaron Schmidt | UC#24 | LP-SIS | ITE | TM4 | 41177-3 | 42752-6 | In progress | Conditioning Heat Shield for UC#24 & voltage test prep | 4 Kapton wire routed into the 9-pin connector. Unused pins are grounded on the bracket.
Friday, July 27, 2018, 14:25: Roughing
Friday, July 27, 2018, 14:41: Turbo pumps on.
Friday, July 27, 2018, 15:53: RGA on.
Saturday, July 28, 2018, 07:03: Waterlines opened. No response on RGA. Vacuum steady @ 1.34e-06T
Friday, August 03, 2018, 10:30: Exposed 9-pin wires inside the cage insulated with electrical tape.
Friday, August 03, 2018, 10:35: Auto-ramping TGHT / TBHT to 580 / 225 A @ 2A per min.
Tuesday, August 07, 2018, 07:40: Small spikes but frequent noted in the RGA on Water, Nitrogen, and Oxygen. More than usual although the vacuum in reasonable at 7.0e-07T.
Tuesday, August 07, 2018, 07:49: Auto-cooling started @ 2A per min. |
675
|
Monday, July 23, 2018, 14:25 |
Aaron Schmidt | UC#23 | LP-FEBIAD-CTL | ITE | TM2 | | | In progress | Conditioning Heat Shield for UC#23 | Monday, July 23, 2018, 14:20: Roughing.
Monday, July 23, 2018, 14:54: Turbo pumps on.
Tuesday, July 24, 2018, 06:40: Ion gauge on. Vacuum slowly decreasing
Tuesday, July 24, 2018, 07:20: RGA on.
Tuesday, July 24, 2018, 07:27: Waterlines opened. No response on RGA. Vacuum stable @ 2.24e-06T
Tuesday, July 24, 2018, 07:29: Power/sources on.
Tuesday, July 24, 2018, 07:34: Opening gas lines slowly.
Tuesday, July 24, 2018, 07:36: SV2 & SV5 Open.
Tuesday, July 24, 2018, 07:43: SV3 Open.
Tuesday, July 24, 2018, 07:47: SV4 Open.
Tuesday, July 24, 2018, 09:00: Turn off sources/power and check 9-pin in the back of the TS. OK
Tuesday, July 24, 2018, 09:20: Restart sources/power. Gases open.
Tuesday, July 24, 2018, 13:39: Auto-ramping TGHT / TBHT to 500 / 275 A @ 2A per min.
Tuesday, July 24, 2018, 13:45: BIAS / EZL / EE @ 30 / 13 / -1.5 kV.
Tuesday, July 24, 2018, 13:46: IV4 opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
26.4 |
3.92 |
TBHT |
26.9 |
3.08 |
COIL + EE |
26.1 |
5.00 |
TGHT |
26.5 |
5.64 |
Tuesday, July 24, 2018, 13:48: Optics set.
Note* Approx 10 sparks noted during auto-ramping. All occurred between 12:30am - 4:00am today.
Wednesday, July 25, 2018, 06:35: Auto-ramping is ongoing since it was started yesterday. Auto-ramping TGHT / TBHT to 500 / 275 A @ Vacuum limited rate
TGHT / TBHT @ 310 / 275. Significant out gassing noted adjusting the ramping rate.
Wednesday, July 25, 2018, 06:40: Auto-ramp halted. Auto-ramping TGHT / TBHT to 580 / 285 (290 w/ direct readout) A @ Vacuum limited rate. Restart auto-ramp.
Wednesday, July 25, 2018, 11:25: Increased good ramping limit to 2E-6 Torr - AM
Wednesday, July 25, 2018, 11:28: ANODE voltage to 200 V, 11 mA current read back
Thursday, July 26, 2018, 08:08: RGA Restarted
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
35.6 |
3.86 |
TBHT |
26.8 |
3.06 |
COIL + EE |
26.5 |
5.03 |
TGHT |
28.6 |
5.65 |
Thursday, July 26, 2018, 08:13: EZL to 13.4 kV
Thursday, July 26, 2018, 08:19: Coil @ 20 A.
Thursday, July 26, 2018, 08:29: Coil @ 30 A. TBHT @ 300A.
Thursday, July 26, 2018, 08:35: Coil @ 40 A.
Thursday, July 26, 2018, 08:41: Coil @ 50 A.
Thursday, July 26, 2018, 14:33: auto-cooling @ 2 A per min
Thursday, July 26, 2018, 14:45: Coil @ 0 A.
Friday, July 27, 2018, 08:29: Gas lines closed
Friday, July 27, 2018, 08:32: Sources off.
Friday, July 27, 2018, 08:34: RGA off. IV4 closed
Friday, July 27, 2018, 08:36: Ion gauge & turbos off.
Friday, July 27, 2018, 08:39: Power off. Waterlines purged. |
648
|
Tuesday, March 13, 2018, 06:00 |
Aaron Schmidt | UC#22 | LP-SIS | ITE | TM4 | | | In progress | Conditioning Heat Shield for UC#22 | Tuesday, March 13, 2018, 08:50: Roughing.
Tuesday, March 13, 2018, 09:10: Turbo Pumps started.
Tuesday, March 13, 2018, 09:15: Ion gauge on.
Tuesday, March 13, 2018, 10:17: RGA started.
Tuesday, March 13, 2018, 13:15: Check Vacuum @ 6.56e-07T
Wednesday, March 14, 2018, 07:27: Waterlines opened. No response on RGA. Vacuum ok @ 2.69e-07T
Wednesday, March 14, 2018, 07:30: Power/sources on.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
21.7 |
3.61 |
TBHT |
21.4 |
2.82 |
COIL + EE |
21.5 |
4.64 |
TGHT |
21.7 |
5.23 |
Wednesday, March 14, 2018, 07:35: Auto ramping TGHT to 580 A @ 2A per min.
Wednesday, March 14, 2018, 13:18: Vacuum ok @ 5.48e-07T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
32.6 |
3.72 |
TBHT |
22.5 |
2.86 |
COIL + EE |
22.6 |
4.75 |
TGHT |
24.9 |
5.08 |
Wednesday, March 14, 2018, 13:29: BIAS/EZL/EE to 30 / 13.5 / 1.5 kV.
BIAS current: 40uA
EZL current: 49uA
EE current: 518uA
Thursday, March 15, 2018, 08:00: Check, Vacuum @ 4.76e-07T
Thursday, March 15, 2018, 13:19: Check, Vacuum @ 4.65e-07T
Thursday, March 15, 2018, 15:13: Started cool down. Vacuum at 4.76e-7 by AM
Friday, March 16, 2018, 06:24: Power/sources off.
Friday, March 16, 2018, 06:27: Waterlines purged
Friday, March 16, 2018, 06:28: RGA, ion gauge, and turbos off.
Friday, March 16, 2018, 07:57: Venting.
|
474
|
Friday, October 16, 2015, 12:26 |
Anders Mjos | Target tube only | | | | | 41120-4 | In progress | Conditioning HS for UC#14 | Friday, October 16, 2015, 12:20: Roughing.
Friday, October 16, 2015, 13:06: Started turbos.
Friday, October 16, 2015, 13:25: Turbos at speed. Vacuum at 3.2E-5 T
IG1 filament beeing replaced.
Thursday, October 22, 2015, 13:56: Leak on water lines (pressurized all lines except HS line with helium)
Thursday, October 22, 2015, 13:57: Stopping turbos. RGA off.
Thursday, October 22, 2015, 15:02: Venting
Re-tightened all newly installed fittings.
Thursday, October 22, 2015, 15:41: Roughing
Thursday, October 22, 2015, 16:12: Turbos started.
Thursday, October 22, 2015, 16:22: Turbos at speed. Vacuum at 1.2 E-5 T. RGA on
Monday, October 26, 2015, 08:42: Stopped turbos. Water leak still present. RGA off.
Tuesday, October 27, 2015, 08:57: Venting
Tuesday, October 27, 2015, 14:25: roughing
Tuesday, October 27, 2015, 15:03: Turbos started.
Water can still be seen on the RGA when the TGHT cooling lines are pressurized.
Thursday, October 29, 2015, 14:00: Stopped turbos. RGA off.
Monday, November 02, 2015, 08:30: Venting |
478
|
Tuesday, November 03, 2015, 09:00 |
Anders Mjos | Target tube only | | | | | 41120-4 | In progress | Conditioning HS for UC#14 | Tuesday, November 03, 2015, 08:59: Starting TGHT ramping to 580 A at 1 A/min
Thursday, November 05, 2015, 16:39 : Ramping down
Monday, November 09, 2015, 08:13: Turbos stopped
Monday, November 16, 2015, 10:24: Venting |
784
|
Wednesday, February 12, 2020, 11:04 |
Aaron Schmidt | | LP-SIS | | | 41790-9 | 43515-1 | In progress | Conditioning HS | Using a broken LP-FEBIAD oven for out gassing. Tentative UC#31*
Wednesday, February 12, 2020, 10:57: Roughing.
Wednesday, February 12, 2020, 11:30: Turbo pumps on.
Thursday, February 13, 2020, 07:19: Waterlines opened. Vacuum ok @ 6.91e-07T.
Thursday, February 13, 2020, 07:22: Power / Sources on. TGHT only.
Thursday, February 13, 2020, 07:25: Auto-ramping TGHT @ 2A per min to 580 A.
Friday, February 14, 2020, 14:03: Auto-cooling @ 1 A per min.
Thursday, February 20, 2020, 07:33: PS, sources off, locked out.
Thursday, February 20, 2020, 07:34: Turbo pumps & IG1 off.
Thursday, February 20, 2020, 07:35: Waterlines purged. Nitrogen Bottle around 2050 PSI.
Thursday, February 20, 2020, 09:22: Venting.
|
781
|
Thursday, January 30, 2020, 15:25 |
Aaron Schmidt | C(#1) | LP-SIS | | | 43044-8 | 43515-3 | In progress | Conditioning C(#1) HS | Was for UC# 32* - Schedule change, now for C#1
Thursday, January 30, 2020, 15:13: Roughing.
Thursday, January 30, 2020, 15:46: Turbo pumps on.
Thursday, January 30, 2020, 15:50: IG1 on.
Friday, January 31, 2020, 08:14: Waterlines opened. No Vacuum response. Vacuum ok @ 6.10e-07T.
Friday, January 31, 2020, 08:16: Power / sources on
Friday, January 31, 2020, 08:18: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Monday, February 03, 2020, 12:56: Auto-cooling @ 2 A per min.
Wednesday, February 05, 2020, 09:07: Power / sources off. Waterlines purged. IG1 & turbo pumps off.
Friday, February 07, 2020, 11:45:
Short was found on the HS Lid from the TGHT on the left. Milled out 1/8" off both HS lid / TGHT gaps. Lots of clearance now. Reheat req'd. |
942
|
Tuesday, October 18, 2022, 13:25 |
Aaron Schmidt | C#5 | LP-SIS | | | 45235-5 | 44691-13 | In progress | Conditioning C#5 | Tuesday, October 18, 2022, 13:25: Roughing.
Tuesday, October 18, 2022, 13:28: BV1A open
Wednesday, October 19, 2022, 12:14: TP1B on.
Wednesday, October 19, 2022, 12:18: TP1A on.
Wednesday, October 19, 2022, 12:26: IG1 on.
Wednesday, October 19, 2022, 12:34: IV4 open & Closed. Vacuum @ 4.13e-06T.
Wednesday, October 19, 2022, 12:39: FS#5 Water line opened.
Wednesday, October 19, 2022, 12:40: PS on.
Wednesday, October 19, 2022, 12:43: Optics PS on. Unlocked.
Wednesday, October 19, 2022, 12:44: Sources on. Vacuum @ 3.21e-06T.
Wednesday, October 19, 2022, 12:46: BIAS / EE / EZL @ 1 / -0.5 / 1 kV.
Wednesday, October 19, 2022, 12:47: TGHT / TBHT @ 10 / 10 A manually.
Wednesday, October 19, 2022, 12:48: IV4 Open.
Wednesday, October 19, 2022, 12:53: Optics set.
Controls updated
Monday, November 07, 2022, 12:40: Optics set
Monday, November 07, 2022, 13:00: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Monday, November 07, 2022, 13:15: Auto-ramping TGHT / TBHT to 20 A @ 4A per minute. (Testing new auto-ramp)
Monday, November 07, 2022, 13:35: BIAS / EE / EZL @ 35 / -1.8 / 15 kV. Spark*
Monday, November 07, 2022, 13:37: BIAS / EE / EZL @ 40 / -2.0 / 17 kV
Monday, November 07, 2022, 13:41: BIAS / EE / EZL @ 45 / -2.3 / 20 kV with multiple sparks near the 44-45kV end of the tap up.
Monday, November 07, 2022, 14:09: Spark. Audible outside the cage, however vacuum was also affected.
Monday, November 07, 2022, 14:49: No further sparks. HV check ok.
Monday, November 07, 2022, 14:52: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. |
940
|
Tuesday, September 27, 2022, 07:55 |
Aaron Schmidt | C#4 | LP-SIS | ITE | TM4 | 44691-3 | 44378-23 | In progress | Conditioning C#4 w/ thermocouples | Thermocouples attached on 5 X 5 multi-pin:
O - O
O - X
O - X
X - X
X - X
Tuesday, September 27, 2022, 07:51: Roughing.
Tuesday, September 27, 2022, 08:25: TP1B on.
Tuesday, September 27, 2022, 08:45: TP1A on.
Tuesday, September 27, 2022, 11:02: Vacuum @ 8.31e-06T
Tuesday, September 27, 2022, 11:04: Waterline FS#5 opened. Vacuum @ 8.13e-06T. Power on
Data logger connected as per FBP
Tuesday, September 27, 2022, 12:18: Sources/PS on.
Tuesday, September 27, 2022, 12:21: TGHT / TBHT manually tapped up to 10A.
Tuesday, September 27, 2022, 12:29: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, September 27, 2022, 12:34: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.
Tuesday, September 27, 2022, 12:35: Sparks* @ 37 KV BIAS. Outside the cage. x 2
Tuesday, September 27, 2022, 12:37: BIAS / EE / EZL @ 40 / -2.0 / 17 kV
Tuesday, September 27, 2022, 12:47: BIAS / EE / EZL @ 45 / -2.3 / 19 kV with multiple sparks on the tap up.
Tuesday, September 27, 2022, 13:00: 2 more sparks. TSG:CBC down. (Red)
Tuesday, September 27, 2022, 13:08: BIAS / EE / EZL @ 47.2 / -2.4 / 20 kV. Significant spark outside the cage.
Tuesday, September 27, 2022, 13:10: BIAS / EE / EZL @ 50 / -2.5 / 20 kV. Spark outside the cage.
Tuesday, September 27, 2022, 13:12: Blue glow / crack flowing across the TBHT.
Tuesday, September 27, 2022, 13:15: The glow is flexing? Fading in & out.
Tuesday, September 27, 2022, 13:50: HV Tap down to 0 kV
Tuesday, September 27, 2022, 14:13: TSG:CBC controls card replaced. Operation returned.
Tuesday, September 27, 2022, 14:14: IV4 opened.
Tuesday, September 27, 2022, 14:17: Optics set.
Tuesday, September 27, 2022, 14:19: Auto-ramping TGHT / TBHT to 350 / 150 @ 2A per min.
Tuesday, September 27, 2022, 14:43: BIAS / EE / EZL @ 1 / -0.5 / 1 kV. Remote operation clear.
Tuesday, September 27, 2022, 18:20: TS tripped shortly after 3:35 PM

Tuesday, September 27, 2022, 18:30: Reset TS sources & optics
Tuesday, September 27, 2022, 18:49: Auto-ramping TGHT / TBHT to 300 / 150 @ 1A per min. Allow for a gradual out gassing.
Tuesday, September 27, 2022, 21:20: TGHT / TBHT @ 150A Vacuum @ 2.15e-06T. TGHT ramp ongoing @ 1 A per min.
Tuesday, September 27, 2022, 22:08: TGHT / TBHT @ 200 / 150 A. Vacuum @ 2.15e-06T. Stable. TGHT ramp ongoing @ 1 A per min.

Tuesday, September 27, 2022, 23:19: Auto-ramp halted. Sped up to 2 A per min. Vacuum @ 1.96e-06T. TGHT @ 270 A.
Tuesday, September 27, 2022, 23:41: TGHT / TBHT @ 300 / 150 A. Vacuum @ 1.97e-06T

Wednesday, September 28, 2022, 06:36: Auto-ramping TGHT to 350A @ 1A per min.
Wednesday, September 28, 2022, 08:14: Vacuum remained stable @ 1.49e-06T. Auto-ramping TGHT / TBHT to 400 / 200 A @ 2A per min.
Wednesday, September 28, 2022, 08:48: Increase in vacuum up to 2.50e-06T+ followed by a drop in TBHT voltage. TGHT / TBHT remain stable @ 400 / 200 A. Vacuum stabilizing @ 2.32e-06T. HV off.
Wednesday, September 28, 2022, 09:15: Data logger setup. Pins moved from 3 & 4 to 4 & 5. Temperature @ 50.6 C.
Wednesday, September 28, 2022, 09:20: HV sources & optics back on. Tap up.
Wednesday, September 28, 2022, 09:33: Auto-ramping TGHT to 450A @ 2 A per min. Some small sparks noted.
Wednesday, September 28, 2022, 09:35: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Wednesday, September 28, 2022, 09:59: Auto-ramping TGHT to 500A @ 2 A per min. Some small sparks noted although less frequent.
Wednesday, September 28, 2022, 10:28: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min.
Wednesday, September 28, 2022, 10:41: BIAS lowered to 25 kV.
Wednesday, September 28, 2022, 11:09: TGHT / TBHT @ 580 / 230 A. BIAS @ 30 kV. Unstable / sparking.Very active on FC0
Wednesday, September 28, 2022, 11:29: Mass & wire scans ongoing. Reset DAC PS.
Wednesday, September 28, 2022, 11:58: Mass, wire & emittance scans complete. FC0 in. Auto-cooling @ 2 A per min.
Wednesday, September 28, 2022, 13:16: Cooling aborted for measurement.
Wednesday, September 28, 2022, 13:21: Auto-cooling @ 2 A per min.
Thursday, September 29, 2022, 07:20: IV4 closed. Sources off. IG 1 & TP off. |
814
|
Wednesday, September 30, 2020, 06:23 |
Aaron Schmidt | C#2 | LP-SIS | ITW | TM2 | 44139-9 | 43515-2 | In progress | Conditioning C#2 | Wednesday, September 30, 2020, 06:14: Power / sources on.
Wednesday, September 30, 2020, 06:17: Auto-ramping TGHT / TBHT to 300 / 150 A @ 3 A per min.
Wednesday, September 30, 2020, 06:22: Optics set (minus MB1).
Wednesday, September 30, 2020, 07:11: Pair of gradual vacuum spikes noticed. Up to 3.5e-06T & 2.6e-06T, then back down to 2.3e-06T.
Wednesday, September 30, 2020, 07:59: Auto-ramping TGHT / TBHT to 450 / 200 A @ 3 A per min.
Wednesday, September 30, 2020, 08:04: Abort auto-ramping. BIAS @ 10 kV. EZL Appears to have a short. EE up to -1.5 kV ok.
Wednesday, September 30, 2020, 08:11: BIAS back to 0 kV. Auto cooling @ 4A per min.
Wednesday, September 30, 2020, 09:21: Tap down TGHT to 0 from 40 A.
Wednesday, September 30, 2020, 09:22: Power/sources off.
Wednesday, September 30, 2020, 09:23: IG1 & Turbo pumps off.
Wednesday, September 30, 2020, 10:48: Venting.
Wednesday, September 30, 2020, 11:31: Wire found touching on EZL to chamber. Bypassed interlocks. EZL on. 200 V ok 500 V ok. Back to 0V.
Wednesday, September 30, 2020, 11:33: Bypasses removed.
Wednesday, September 30, 2020, 11:37: Roughing.
Wednesday, September 30, 2020, 12:22: Turbo pumps on.
Wednesday, September 30, 2020, 16:41: TGHT / TBHT to 10 / 10 A manually. BIAS / EE / EZL @ 1 / 0.1 / 1 kV. No shorts. Vacuum @ 2.60e-06T.
Wednesday, September 30, 2020, 16:47: HV & Heaters tapped back to 0 A & 0 kV.
Thursday, October 01, 2020, 05:27: Auto-ramping TGHT / TBHT to 150 / 75 A @ 3 A per min.
Thursday, October 01, 2020, 07:04: Auto-ramping TGHT / TBHT to 300 / 150 A @ 3 A per min.
Thursday, October 01, 2020, 07:29: Optics on. (MB1 Still interlocked but connected now)
Thursday, October 01, 2020, 07:38: BIAS / EE / EZL @ 30 / -1.5 / 13 kV
Thursday, October 01, 2020, 07:39: IV4 open.
Thursday, October 01, 2020, 07:55: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Thursday, October 01, 2020, 08:34: Voltage drops on BIAS. Auto ramping halted.
Thursday, October 01, 2020, 08:37: BIAS / EE / EZL @ 15 / -1.0 / 8.5 kV.
Thursday, October 01, 2020, 10:04: Auto-ramping TGHT / TBHT to 450 / 230 A @ 1 A per min.
Thursday, October 01, 2020, 11:13: Auto-ramping TGHT / TBHT to 580 / 230 A @ 1 A per min.
Thursday, October 01, 2020, 14:31: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. BIAS instability ongoing. although less than before. Initial RPM0A & RPM0B wire scans ok. MB1 Still interlocked.
Thursday, October 01, 2020, 14:42: BIAS current limit increased to 0.150 mA
Thursday, October 01, 2020, 16:24: BIAS / EE / EZL @ 20 / -1.5 / 6.5 kV.
Friday, October 02, 2020, 09:55: BIAS / EE / EZL @ 25 / -1.5 / 10 kV.
Friday, October 02, 2020, 10:43: Spark* Tripped Optics, IV4 & TP1A. Optics reset. Trouble on IV4 & TP1A
Friday, October 02, 2020, 10:58: IV4 reset. TP1A not back yet.
Friday, October 02, 2020, 11:22: TP1A reset and on.
Friday, October 02, 2020, 12:19: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Friday, October 02, 2020, 13:58: HV to 0 kV
Friday, October 02, 2020, 14:00: Auto-Cooling @ 1 A per min.
Tuesday, October 13, 2020, 08:07: Power / sources off. HS Waterlines purged.
Tuesday, October 13, 2020, 08:09: IG1 off. Turbo pumps off.
Tuesday, October 13, 2020, 10:31: Venting. |
794
|
Wednesday, June 10, 2020, 08:23 |
Aaron Schmidt | C#1 | LP-SIS | ITW | TM2 | 43044-8 | 43515-3 | In progress | Conditioning C#1 | Salts:
Li - 10 uL
Na - 10 uL
K - 5 uL
Rb - 10 uL
Cs - 15 uL
Wednesday, June 10, 2020, 08:55: Roughing.
Wednesday, June 10, 2020, 09:30: Turbo pumps on.
Wednesday, June 10, 2020, 09:35: Ion gauge on.
Wednesday, June 10, 2020, 13:52: HS waterline opened. Vacuum ok @ 4.11e-06T.
Wednesday, June 10, 2020, 13:59: All main PS on. E-rig PS on. Optics on.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.21 |
5.81 |
TBHT |
27.04 |
8.83
|
COIL + EE |
26.93 |
2.76 |
TGHT |
27.04 |
6.58 |
Wednesday, June 10, 2020, 14:02: Sources on.
Thursday, June 11, 2020, 07:15: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Thursday, June 11, 2020, 07:29: IV4 opened. BIAS / EZL / EE @ 30 / 13 / -1.5 kV.
Thursday, June 11, 2020, 09:56: BIAS reduced to 20 kV due to sparking / out gassing. MB1 having issues?
Thursday, June 11, 2020, 14:24: Halted auto ramp due to the vacuum. TGHT @ 500 A. Vacuum @ 7.08e-06T.
Thursday, June 11, 2020, 14:26: TBHT reduced to 200 A.
Thursday, June 11, 2020, 19:09: Auto-cooling @ 1 A per min.
Friday, June 12, 2020, 10:43: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min.
Monday, June 15, 2020, 03:00: Vacuum @ 2.66e-06T. TGHT / TBHT @ 300 / 150 A. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Monday, June 15, 2020, 05:30: Tap up BIAS. BIAS / EZL / EE @ 30 / 13 / -1.5 kV. TGHT @ 512 A. Vacuum @ 6.11e-06T.
Monday, June 15, 2020, 06:46:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
26.40 |
7.51 |
TBHT |
26.08 |
10.15
|
COIL + EE |
25.88 |
3.53 |
TGHT |
26.06 |
7.31 |
Mass scans complete w/ TGHT / TBHT @ 512 / 230 A. 30 kV.
Mass, wire, & emittance scans taken on: M7, M23, M38, M86, M125.
Monday, June 15, 2020, 09:52: Auto-cooling @ 1 A per min.
Monday, June 15, 2020, 21:23: BIAS / EE / EZL @ 0 kV.
Tuesday, June 16, 2020, 06:57: IV4 closed & reset.
Tuesday, June 16, 2020, 07:00: Sources / Power off. IG1 off. Turbo pumps off.
Tuesday, June 16, 2020, 08:06: Waterlines purged. N bottle @ 1450 PSI. Venting. |
782
|
Friday, February 07, 2020, 14:02 |
Aaron Schmidt | C#(1) | LP-SIS | | | 43044-8 | 43515-3 | In progress | Conditioning C#(1) HS | Was for UC# 32* - Schedule change, now for C#1* - Last HS conditioning revealed a TGHT to HS lid short. Milled the lid back 1/8" - Aaron S.
Friday, February 07, 2020, 14:00: Roughing.
Friday, February 07, 2020, 14:33: Turbo pumps on.
Friday, February 07, 2020, 14:38: IG1 on.
Monday, February 10, 2020, 07:39: HS waterlines opened. Vacuum ok @ 4.12e-07T.
Monday, February 10, 2020, 07:41: Power / sources on.
Monday, February 10, 2020, 07:43: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Monday, February 10, 2020, 13:01: Heating appears ok. No voltage abnormalities or short.
Monday, February 10, 2020, 13:02: Auto-Cooling @ 1 A per min.
Tuesday, February 11, 2020, 06:39: Power / Sources off.
Tuesday, February 11, 2020, 06:40: Waterlines purged. Nitrogen bottle @ 2100 PSI approx.
Tuesday, February 11, 2020, 06:42: IG1 off. Turbo pumps off.
Tuesday, February 11, 2020, 09:59: Venting.
|
215
|
Tuesday, September 25, 2012, 16:10 |
Aurelia Laxdal | | | | | | | | Conditioning - SiC-HP-FEBIAD for operator training | Did the HV conditioning up to 30kV.
Started the heaters conditioning:
for TSH:TGHT up to 580A
for TSH:TBHT up to 230A |
993
|
Tuesday, February 06, 2024, 11:48 |
Aaron Schmidt | SiC# (Stock) | HP-SIS | | | 41369-2 | 45235-14 | In progress | Conditioning (Stock SiC-24C) SiC HP-SIS | Tuesday, February 06, 2024, 11:45: Roughing.
Tuesday, February 06, 2024, 13:27: TP1B on.
Tuesday, February 06, 2024, 13:33: TP1A on.
Tuesday, February 06, 2024, 13:47: IG1 on.
Wednesday, February 07, 2024, 06:54: Vacuum @ 7.55e-07T.
Wednesday, February 07, 2024, 06:56: PS on. FS#5 open. Vacuum stable.
Wednesday, February 07, 2024, 06:58: Coil jumped from 0A with the breaker off to 200 A w/ 4.2 V.
Wednesday, February 07, 2024, 06:59: Coil PS switched on. Increase coil current to 75 A & back down again. No change. Will need to trouble shoot this once this target is complete.
Wednesday, February 07, 2024, 07:04: Auto-ramping TGHT / TBHT to 350 / 200 A @ 2 A per min. Good vac / bad vac settings set back to 5.00e-06T / 7.00e-06T. Note: The TS will trip at 1.00e-05T.
Wednesday, February 07, 2024, 07:09: FC0 still acting up. Optics on.
Wednesday, February 07, 2024, 10:28: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Wednesday, February 07, 2024, 12:10: IV4 open.
Wednesday, February 07, 2024, 12:14: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Wednesday, February 07, 2024, 12:15 : Opening & Closing FC0 for a measurment does not interfere with IV4.
Wednesday, February 07, 2024, 12:42: One audible spark. Knocked out TMS : Q2/Q5. Reset.
Wednesday, February 07, 2024, 13:34: Mass & Wire scans complete with 2 tunes. Ok.
Thursday, February 08, 2024, 09:02: Auto-cooling @ 2A per min.
Coil PS removed. (See elog 995)
Friday, February 16, 2024, 04:57: IV4 closed
Friday, February 16, 2024, 04:58: IG1 & TP off. |
364
|
Monday, March 17, 2014, 19:10 |
Anders Mjos | Ta#42 | LP-SIS | ITW | TM4 | 40282-1 | 39956-1 / 39956-9 (base / lid) | In progress | Conditioning | NOTE:
TBHT Power Supply is 600A. EPICS thinks it is 500. Multiply current setting with 1.2 for actual current to the tube.
Time stamp on OM-DAQPRO-5300 is on hour behind (daylight savings).
All bolts torqued to 130 in lbs. TGHT and TBHT bolts tightened and loosened 3x.
Monday, March 17, 2014, 19:10: Roughing
Monday, March 17, 2014, 19:30: Turbos started
Monday, March 17, 2014, 19:38: Turbos at speed.
Monday, March 17, 2014, 19:40: Vacuum at 1.3E-5 T
BY R.M.
Tuesday, March 18, 2014, 10:10: Vacuum 2.87e-07 T
Tuesday, March 18, 2014, 10:12: Heatshield Water Circuit turned on
Tuesday, March 18, 2014, 10:25: Vacuum 2.85e-07 T
By AM
Tuesday, March 18, 2014, 16:06:
Conditioned high voltage BIAS to 30kV. BIAS:RDCUR 37 uA.
Started heater auto-ramping. TBHT to 50A at 1A/min. TGHT to 100A at 2 A/min.
Vacuum at 2.7E-7 T
Tuesday, March 18, 2014, 17:06: TBHT and TGHT reached 50A and 100A respectively. Local readback on TBHT is 58A (as expected - see note above). Vacuum is gradually coming down.
Operation stable over night. TSG:CBC needed to be restarted. Switched off over night.
Wednesday, March 19, 2014, 08:21: Continue heating to 85A / 250 A TBHT/TGHT.
Wednesday, March 19, 2014, 09:12
Water temperatures 27 - 28 deg C, and flow Rates
4.0 l/m HS+MSP
6.4 l/m TBHT
5.1 l/m COIL+EE
5.6 l/m TGHT
Wednesday, March 19, 2014, 09:57: Continue heating to 170 A / 500 A, TBHT/TGHT
Wednesday, March 19, 2014, 09:58: Opened IV4
Wednesday, March 19, 2014, 09:58: Restarted Q1.
Wednesday, March 19, 2014, 10:11: Switched FC0 bias to negative
Wednesday, March 19, 2014, 10:30: Q1 restarted. Possible spark. Small vacuum response on IG1
Wednesday, March 19, 2014, 10:49: Some sparking
Wednesday, March 19, 2014, 12:43: Continue heating to 190A / 580 A TBHT/TGHT.
Wednesday, March 19, 2014, 13:00: TBHT voltage limited. Increased limit to 2.3V
Water temperatures and flow rates
35 C 4.0 l/m HS+MSP
28 C 6.4 l/m TBHT
28 C 5.1 l/m COIL+EE
30 C 5.6 l/m TGHT
Wednesday, March 19, 2014, 13:32: Local read back on PS: 223A / 580A TBHT/TGHT
Water temperatures and flow rates
37 C 4.0 l/m HS+MSP
28 C 6.4 l/m TBHT
29 C 5.1 l/m COIL+EE
31 C 5.6 l/m TGHT
Wednesday, March 19, 2014, 14:30: Measured ~2E-7 A 23Na on FC6 and 2E-7 A on FC0. Vacuum on IG1 4.2E-8 T
Wednesday, March 19, 2014, 14:58: TBHT was voltage limiting. Increased voltage limit to 2.4 V
Target will condition over night.
Thursday, March 20, 2014, 10:07: Measured ~1.4E-8 A 23Na on FC6 and 2E-7 A on FC0. Vacuum on IG1 8.3E-7 T
Water temperatures and flow rates
35 C 4.0 l/m HS+MSP
27 C 6.4 l/m TBHT
27 C 5.1 l/m COIL+EE
29C 5.6 l/m TGHT
Thursday, March 20, 2014, 10:13: Starting mass scan 200 - 0
Local current on PS (TBHT/TGHT): 227 A / 580 A
At about 10:15 to 10:20 the TGHT:RDVOL dropped from 7.2 - 7.1 V.
Thursday, March 20, 2014, 11:05: Mass scan finished.
Water temperatures and flow rates
36 C 4.0 l/m HS+MSP
28 C 6.4 l/m TBHT
29 C 5.1 l/m COIL+EE
30 C 5.6 l/m TGHT
Thursday, March 20, 2014, 13:20
Water temperatures and flow rates
34.8 C 4.0 l/m HS+MSP
26.1 C 6.4 l/m TBHT
26.8 C 5.1 l/m COIL+EE
28.4 C 5.6 l/m TGHT
Thursday, March 20, 2014, 13:24: Conditioning EE to -2kV
Thursday, March 20, 2014, 13:26: EE at -2kV and 694 uA
Thursday, March 20, 2014, 13:36: Lowering EE back to -1.4kV
Thursday, March 20, 2014, 13:38: Starting the cool down of the target at 2 A/min
Thursday, March 20, 2014, 15:08: Closed IV4
Friday, March 21, 2014, 08:32: Lowered BIAS, EE and EZL to 0. TGHT and TBHT off.
Friday, March 21, 2014, 08:33: Stopped turbos. Vacuum at 1.3E-7 T
Friday, March 21, 2014, 13:10: Venting |
497
|
Friday, March 04, 2016, 14:23 |
Anders Mjos | Target tube only | LP-SIS | ITW | TM2 | 39459-2 | 41120-10 | In progress | Conditiong Heat Shield for UC#15 | Friday, March 04, 2016, 14:20: Roughing
Friday, March 04, 2016, 15:05: Turbos started
Friday, March 04, 2016, 15:11: Turbos at speed. Vacuum at 3.5E-5 T.
Monday, March 07, 2016, 08:34: Opened water. Vacuum stable at 6.7E-7 T. No response on RGA
Monday, March 07, 2016, 08:46: Started auto-ramping TGHT to 420 A at 2 A/min. EE to 1500 V
Tuesday, March 08, 2016, 08:26: Continued auto-ramping TGHT to 500 A.
Wednesday, March 09, 2016, 09:25: TGHT voltage limited at 488 A. Increased voltage limit from 6 to 6.5 V. Resumed auto-ramping to 500 A
Thursday, March 10, 2016, 08:19: Begin cool down @ 2 A/min ; Vacuum @ 7.1E-7 T
Thursday, March 10, 2016, 13:20: TGHT to 0 A. Switched off RGA.
Thursday, March 10, 2016, 14:04 : Source off. Stopped Turbo pumps.
Friday, March 11, 2016, 08:15: Begin venting.
Friday, March 11, 2016, 08:28: Heat shield water circuit has been purged.
|
499
|
Wednesday, March 16, 2016, 09:59 |
Anders Mjos | Target tube only | | | TM1 | 39459-2 | 40898-2 | In progress | Conditiong Heat Shield for UC#15 | Back up heat shield for UC#15
Wednesday, March 16, 2016, 09:58: Roughing
Wednesday, March 16, 2016, 12:54: Started Turbo pumps
Wednesday, March 16, 2016, 13:02: Turbos at speed, Vacuum at 7.16E-06T
Thursday, March 17, 2016, 08:30: Opened water on heat shield circuit. Vacuum stable at 3.0E-07T. No response on RGA.
Thursday, March 17, 2016, 08:37: Auto-Ramping started. TGHT to 500A @ 2A/min. EE to 1500V.
Thursday, March 17, 2016, 15:40 @ 500A and 6.76E-07T
Friday, March 18, 2016, 08:35: Auto-cooling. Vacuum @5.87E-07T.
Friday, March 18, 2016, 14:13: Source off. Stopped turbo pumps.
Tuesday, March 29, 2016, 13:22: venting |
397
|
Friday, August 08, 2014, 12:45 |
Anders Mjos | ZrC#6 | LP-SIS | ITW | TM1 | 40282-3 | 39230-5 | Done | Condictioning ZrC#6 | Friday, August 08, 2014, 12:44: Stopped turbos
Friday, August 08, 2014, 14:42: Venting
Target assembly inserted
Friday, August 08, 2014, 15:08: Roughing
Friday, August 08, 2014, 15:29: Turbos started
Friday, August 08, 2014, 15:37: Turbos at speed
Friday, August 08, 2014, 15:39: Vacuum at 1.4E-5 T
Monday, August 11, 2014, 08:58: Opened HS cooling water. Vacuum stable at 1.6E-7 T
Tuesday, August 12, 2014, 10:31: IV4 Opened
Tuesday, August 12, 2014, 10:35: EZL / EE / BIAS to 14 / -1.5 / 30 kV
Tuesday, August 12, 2014, 10:39: Starting target heat to 300 A / 96 (115) A
Wednesday, August 13, 2014, 08:03 : Continue heating to 580 A / 190 (228) A
Wednesday, August 13, 2014, 08:24: Aborting target heating. Cu-LCW pressure and flow is reduced due to a problem with a pump.
Device |
Flow
[lpm] |
Temp
[C]
|
HS + MSP |
1.9 |
27.7 |
TBHT |
4.1 |
23.9 |
COIL + EE |
3.5 |
25.1 |
TGHT |
3.7 |
25.6 |
SUPPLY |
|
24.4 |
Supply pressure ~ 52 psi
Return pressure ~ 11 psi
Wednesday, August 13, 2014, 08:31: Starting cool down as flow rate on HS + MSP is low. A low flow trip of the TGHT should be avoided.
Wednesday, August 13, 2014, 11:54 : Curtis Ballard contacted me and asked if they could valve off the Cu-LCW circuit to the Test Stand. Heaters had been previously brought down. Bias off and power supplies are switched off. IV4 closed.
Wednesday, August 13, 2014, 12:00: Cooling water syupply valved off to Test Stand.
Flow rates are back to normal since yesterday evening
Device |
Flow
[lpm] |
Temp
[C] |
HS + MSP |
3.1 |
27.8 |
TBHT |
5.9 |
27.4 |
COIL + EE |
5.0 |
28.3 |
TGHT |
5.4 |
27.6 |
SUPPLY |
|
28.1 |
Thursday, August 14, 2014, 08:00: Conditioning on hold due to FC0 problem
Wednesday, August 20, 2014, 07:50: Conditioning continues. Auto-ramping to 400 / 150 ( 180) A @ 4/2 A/min
Wednesday, August 20, 2014, 09:35 : Continue heating to 580 / 165 (200) A @ 2/1 A/min
Wednesday, August 20, 2014, 09:50
Device |
Flow
[lpm] |
Temp
[C] |
HS + MSP |
3.6 |
32.9 |
TBHT |
6.5 |
28.5 |
COIL + EE |
5.4 |
29.2 |
TGHT |
5.8 |
29.7 |
SUPPLY |
|
28.8 |
Wednesday, August 20, 2014, 15:15: Power lost to TBHT, TGHT and EE during nominal operation (580/ 183 (220) A). Fault report submitted.
PLC cabinet work finished. Resuming conditioning.
Tuesday, August 26, 2014, 16:35:EZL / EE / BIAS to 14 / -1.5 / 30 kV
Tuesday, August 26, 2014, 16:35: Starting target heat to 50 A / 25 A
Wednesday, August 27, 2014:
Continued conditioning. Heating to 580 /190 (228) A
Thursday, August 28, 2014, 08:34
Device |
Flow
[lpm] |
Temp
[C] |
HS + MSP |
3.5 |
38.0 |
TBHT |
6.4 |
28.0 |
COIL + EE |
5.5 |
29.8 |
TGHT |
5.8 |
30.3 |
SUPPLY |
|
28.2 |
Friday, August 29, 2014, 10:30: EE conditioned for ~20 min @ 2kV.
Friday, August 29, 2014, 10:32 : Starting cool down at 4/2 A/min
Friday, August 29, 2014, 11:55: Closed IV4
Friday, August 29, 2014, 11:56: BIAS, EE and EZL to 0
Friday, August 29, 2014, 13:10: Stopped turbos.
Friday, August 29, 2014, 14:06: Venting
Friday, August 29, 2014, 14:51: Target removed |
|