Entry  Monday, January 11, 2021, 14:20, Carla Babcock, , , , , , , , Test stand wiring reverted to anode bias mode 
I have rewired the test stand (service cap wiring only, not power supply wiring) to anode bias mode as shown in the diagram. This was not how it was
wired before, there are several things I have removed that appear to be newer additions. I also removed the burned cable between TBHT(-) and COIL(-), and
between the multipin feedthrough and ground (probably related to the other burned cable).
    Reply  Thursday, January 14, 2021, 08:31, Fernando Maldonado, , , , , , , In progress, Gas delivery system upgrade new-gauge.png


    
        
            Fernando Maldonado wrote:
        
        
            
            Yesterday, December 1st, I successfully installed and tested the gas system inside the faraday cage.
    Reply  Wednesday, January 20, 2021, 11:30, Fernando Maldonado, , , , , , , Done, Cathode bias mode configuration confirmed 


    
        
            Fernando Maldonado wrote:
        
        
            
            Wednesday, October 30, 2019, 14:49: John C. changed the polarity of the anode power supply to negative,
Entry  Thursday, January 21, 2021, 10:55, Fernando Maldonado, , , , , , , Done, Updated Good Vac value for TSG:IG1 
On Tuesday the hard good vacuum level was changed from 7e-6 T to 1e-5 T to allow larger leak rates when testing FEBIAD.
Also this new level should allow faster heating rates (be mindful and cautious)
Work done as per WP C2021-01-19-9
Entry  Tuesday, February 09, 2021, 14:02, Aaron Schmidt, , , , , , , Problems/Solutions, DI water loss 
Tuesday, February 09, 2021, 13:43: DI water flow completely stopped.
Control room contacted. DI water loss confirmed.
Tuesday, February 09, 2021, 13:52: DI water flow returned.
Entry  Friday, February 12, 2021, 12:16, Fernando Maldonado, , , , , , , Problems/Solutions, Grounding collimator cable from outside 20210212_121227.jpg
 Friday, February 12, 2021, 12:13: Since the collimator is not used, Carla and I installed a BNC short outside the cage. See picture.
Entry  Friday, February 12, 2021, 16:38, Fernando Maldonado, , , , , , , Failed, FEBIAD parameter scan - efficiency measurements - energy spread. 
Friday, February 12, 2021, 16:37: FEBIAD installed with mechanical calibrated leak
Friday, February 12, 2021, 16:38: Roughing.
Gas lines opened all the way to the sour. SV4 and SV5.
Entry  Tuesday, February 16, 2021, 14:52, Fernando Maldonado, , , , , , , Problems/Solutions, Leak checking gas lines. 
Vacuum side
Tuesday, February 16, 2021, 13:42: The gas lines inside have been check. The inlet of the calibrated leak was not tighten properly and hence the
large leak observed.  FIXED.
Entry  Thursday, February 18, 2021, 10:47, Aaron Schmidt, , , , , , , , Optics loss / CANBUS failure. 
Thursday, February 18, 2021, 10:45: TPS:Q3 & the TSB CBC CANBUS controllers had failed yesterday, as well as a cable was incorrectly seated. This
was fixed this morning.
Entry  Thursday, February 18, 2021, 11:03, Aaron Schmidt, , , , , , , Problems/Solutions, DI water pump configuration 
https://elog.triumf.ca/TIS/Test-Stand/847
There was a previous DI CU-LCW  pump trip as per the above elog. The CU-LCW pump was configured this morning. The water pressure is set to
80 PSI as per the MCR. Any further can overload & trip the pump. 
Entry  Thursday, February 18, 2021, 15:15, Fernando Maldonado, , , , , , , Done, HLA tests 
Thursday, February 18, 2021, 15:01: With the help of Spencer Kiy, we tested the proper communication from python to epics.
Getting TSP:Q1 PV: successful both from the web application and jupyter notebook.
Setting TSP:Q1 PV: successful from the web application, failed jupyter notebook.
Entry  Thursday, February 18, 2021, 16:48, Fernando Maldonado, , , , , , , Failed, FEBIAD parameter scans 
Thursday, February 18, 2021, 15:19: Gas lines roughed and refilled. Gauge reads -50 kPa. Absolute pressure is 50 kPa.
IG1 @ 9.7 e-7 T.
Thursday, February 18, 2021, 15:27: BIAS/EZL/EE @ 30/13/1.5 kV. No sign of instabilities as before. Bias current=0.08 mA.
Entry  Friday, February 19, 2021, 13:44, Fernando Maldonado, , , , , , , Failed, FEBIAD parameter scans GND-COIL_spark.jpgGND-HS_spark.jpg
Friday, February 19, 2021, 13:28: Roughing
Friday, February 19, 2021, 13:43: Power on
Friday, February 19, 2021, 13:59: Turbos on
Entry  Monday, February 22, 2021, 18:25, Fernando Maldonado, , HP-FEBIAD, , , , , Done, FEBIAD parameter scans ESC_-_Feb_23_FEBAID_parameter_initial_checks.docxER-580-290-30kV-m28_2021-2-23.txt
Monday, February 22, 2021, 17:48 Roughing
Monday, February 22, 2021, 18:17: Turbos on.
Monday, February 22, 2021, 18:25: IG1 on.
Entry  Monday, March 01, 2021, 12:58, Fernando Maldonado, , LP-FEBIAD, , , , , Done, FEBIAD parameter scans v2 
 Monday, March 01, 2021, 12:57: Roughing
Monday, March 01, 2021, 13:30: Turbos on. Started a bit late as I was distracted. They were ready at around 13:26
Monday, March 01, 2021, 13:41: IG1 on. 
Entry  Monday, March 01, 2021, 16:13, Fernando Maldonado, , , , , , , Done, Temporary RGA installation EXTorr.PNG
 Monday, March 01, 2021, 16:03: An ExTorr RGA has been installed in the ISAC test stand.
The original SRS 100 is still broken ( e-log 778)
Entry  Tuesday, March 02, 2021, 11:42, Aaron Schmidt, , , , , , , , TS Tripped. 
 
Entry  Wednesday, March 10, 2021, 11:10, Carla Babcock, , , , , , , , Venting for installation of emittance meters 
Wednesday, March 10, 2021, 10:48  : Venting beamline section only for installation of emittance meters.
Entry  Wednesday, March 10, 2021, 14:28, Aaron Schmidt, , , , , , , In progress, RP2 swap. 
Swapped RP2 out from a Varian SH-110 to a Varian PTS06001.
Wednesday, March 10, 2021, 14:20: RP2 on.
Wednesday, March 10, 2021, 14:27: Turbo pumps on
Entry  Wednesday, March 10, 2021, 14:57, Aaron Schmidt, , HP-FEBIAD, , , , 42752-5, In progress, Emittance meter test with FEBIAD 
Wednesday, March 10, 2021, 14:54: Roughing.
Wednesday, March 10, 2021, 14:57: BV1A open.

Thursday, March 11, 2021, 09:41: TP1B on. 