Entry  Tuesday, August 11, 2020, 12:04, Aaron Schmidt, UCx, LP-SIS, , , 44139-10, 43515-4, In progress, UCx HS conditioning with PEEK assembly 
HS target leg openings were milled. Short from previous test by the look of it. TBHT insulator on source side is cracked.
Wiring up top adjusted for better clearance. EE (K) Cap appears ok.
Tuesday, August 11, 2020, 12:03: Roughing.
Entry  Tuesday, August 18, 2020, 10:00, Aaron Schmidt, , , , , , , , IDP15 Scroll pump installed - RP1 replaced 
PN: X3815-64000
SN: MY2005SA02
Description: IDP15 Scroll pump, Std.
Entry  Tuesday, August 18, 2020, 12:07, Aaron Schmidt, Test FEBIAD, HP-FEBIAD, , , 38295-8, 42752-5, In progress, RP check & Mass magnet check. 
Tuesday, August 18, 2020, 12:05: RP1 on
Tuesday, August 18, 2020, 12:10: RP1 off
Install Gas Ballast vapour port w/ filter.
Entry  Wednesday, August 19, 2020, 08:52, Aaron Schmidt, , , , , , , , Leak check / Troubleshoot Aug_19_-_2020_Leak_Check..docx
Wednesday, August 19, 2020, 08:52: Purging all lines, except FS#5, It was already purged / closed.
Wednesday, August 19, 2020, 11:24: Vacuum @ 1.76e-06T.
Wednesday, August 19, 2020, 11:29: FS#2 opened. Observable vacuum spike noted. vacuum @ 2.2e-06T. Purge & Close.
Entry  Tuesday, August 25, 2020, 07:23, Aaron Schmidt, , , , , , , Problems/Solutions, Beam line side vacuum trip 
Tuesday, August 25, 2020, 07:07: Beam line side of the TS appears to have tripped? Open BV6 & BV2.
Tuesday, August 25, 2020, 07:15: Beam line side TP6 & TP2 on.
Tuesday, August 25, 2020, 07:16: Venting Chamber side
Entry  Tuesday, September 01, 2020, 14:01, Aaron Schmidt, , , , , , , Done, New tubing installed on loops 
Tuesday, September 01, 2020, 14:00: 
New tubing installed.
Blue on FS#4 loop (A)(B)
Entry  Thursday, September 03, 2020, 11:28, Aaron Schmidt, -, HP-FEBIAD, , , 38295-8, 42752-5, In progress, Leak check 2.0 
Out Gas & MB1 check (Or leak check 2.0)
Ref: https://elog.triumf.ca/TIS/Test-Stand/809 - Leak Checks
Ref: https://elog.triumf.ca/TIS/Test-Stand/803 - Fault
Entry  Tuesday, September 29, 2020, 11:56, Aaron Schmidt, , LP-SIS, , , , , Problems/Solutions, Leak check 3.0 
Installed Indium gasket on FS#2 - (C) water block / R- TGHT.
Tuesday, September 29, 2020, 11:23: Pressurize to 120 PSI at atmosphere.
LD: 0.0E-07 atm-CC/sec
Entry  Wednesday, September 30, 2020, 06:23, Aaron Schmidt, C#2, LP-SIS, ITW, TM2, 44139-9, 43515-2, In progress, Conditioning C#2 C#2_-_Short_-_EZL.docxC#2_Conditioning.docxITW-TM2-C#2-LP-SIS_Test_Stand.docx
Wednesday, September 30, 2020, 06:14: Power / sources on.
Wednesday, September 30, 2020, 06:17: Auto-ramping TGHT / TBHT to 300 / 150 A @ 3 A per min.
Wednesday, September 30, 2020, 06:22: Optics set (minus MB1).
Entry  Tuesday, October 13, 2020, 12:34, Aaron Schmidt, , HP-FEBIAD, , , 38295-8, 42752-5, In progress, MB1 Check. MB1_Check_Oct_-_2020.docx
He & Ar calibrated leak bottles in.
Tuesday, October 13, 2020, 12:33: Roughing.
Tuesday, October 13, 2020, 13:17: TP1B on.
Entry  Friday, October 16, 2020, 11:33, Aaron Schmidt, Ta#61, LP-SIS, ITE, TM4, 44508-1, 43515-1, In progress, Conditioning Ta#61 Ta#61.docxITE-TM4-Ta#61-LP-SIS_Test_Stand.docxER-580-230-30kV-M133.txtER-580-230-30kV-M28.txt
Friday, October 16, 2020, 11:11: Roughing.
Friday, October 16, 2020, 11:39: TP1B on.
Friday, October 16, 2020, 12:29: TP1A on. 
Entry  Tuesday, October 27, 2020, 08:54, Aaron Schmidt, Nb#9 , LP-SIS, ITW, TM2, 44508-2, 43515-4, In progress, Nb#9 Conditioning Nb#9_Conditioning.docxER-580-230-30kV-M133.txtER-580-230-30kV-M23.txt
Tuesday, October 27, 2020, 08:40: Roughing.
Tuesday, October 27, 2020, 09:13: TP1B on.
Tuesday, October 27, 2020, 10:13: TP1A on.
Entry  Monday, November 02, 2020, 08:52, Aaron Schmidt, , , , , , , Problems/Solutions, Leak check / Troubleshoot Nov-2-2020_Leak.docx
Monday, November 02, 2020, 08:46:
Large Vacuum spike noted 5:30 approx. Tripped TS. On tail end of the Nb#9 conditioning run. HV & heating were completed last week
Monday, November 02, 2020, 08:47: Vacuum @ 2.66e-06T.
Entry  Friday, November 06, 2020, 12:53, Aaron Schmidt, Nb#9, LP-SIS, ITW, TM2, 44508-2, 43515-4, In progress, Conditioning Nb#9 w/ P/S Target & Bracket 7x
Attached end plate parasitic / symbiotic target & PEEK assembly bracket.
Friday, November 06, 2020, 12:24: Roughing.
Friday, November 06, 2020, 12:53: TP1B on.
Entry  Tuesday, November 10, 2020, 12:13, Aaron Schmidt, , , , , 43044-13, 44378-1, In progress, Pump down empty chamber / Leak. 
U-Loop installed on FS#5
Tuesday, November 10, 2020, 12:13: Roughing.
Tuesday, November 10, 2020, 12:57: TP1B on
Entry  Monday, November 23, 2020, 10:03, Aaron Schmidt, , , , , , , Problems/Solutions, RP2 Check / pump down issue 20201123_114110.jpg20201123_120204.jpg20201123_120208.jpg20201123_131124.jpg20201123_131127.jpg
TMSRP2 has been struggling since the power bump occurred Nov 18, 2020
Monday, November 23, 2020, 09:48: Open TMS:PV2.
Monday, November 23, 2020, 09:51: Close TMS:PV2. CG2B @ 0.515T.
Entry  Monday, December 21, 2020, 07:58, Aaron Schmidt, , , , , , , , Shutdown TS  
Shutting down the ISAC TS for the planned outage on Dec 22.
Monday, December 21, 2020, 07:50: Ion gauges & turbo pumps off.
Monday, December 21, 2020, 07:51: Confirm wire scanner shutoff.
Entry  Monday, January 04, 2021, 08:17, Aaron Schmidt, , , , , , , , Restart TS 
Restarting TS after holidays & planned power outage.
Monday, January 04, 2021, 08:17: All epics controls in a 'white out' state.
Monday, January 04, 2021, 08:20: Rebooted PLC / IOC. Controls returned.
Entry  Friday, January 29, 2021, 09:13, Aaron Schmidt, , LP-SIS, , , 44139-10, 44378-2, In progress, TS settings ok. 
Friday, January 29, 2021, 09:11: CANBUS controller was replaced. Quick systems check ok. Sources, HV, & Optics all good.
Entry  Monday, February 08, 2021, 09:20, Aaron Schmidt, , LP-SIS, , , 44139-10, 44378-2, Failed, Energy spread calibration with SIS. No PE ESC_-_Feb_8_Start.docx
Re-salted. PE removed. EE Cleaned
Monday, February 08, 2021, 09:17: Roughing.
Monday, February 08, 2021, 09:46: TP1B on