Entry  Monday, July 29, 2024, 23:02, Aurelia Laxdal, Ta#67 Thin foils, LP-SIS, ITE, TM3, 45447-14, 45235-10, , Cooldown for removing the V wires  
 22:55 Cooldown completed to remove the voltage wires from inside the vacuum box. 
Entry  Wednesday, July 17, 2013, 12:55, Anders Mjos, , , , , , , Problems/Solutions, Controls are removing dust/cleaning their devices 
Thursday, July 18, 2013, 08:41: Restarting archivers
Entry  Friday, June 29, 2012, 08:57, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Continue cathode heating 
 This morning the pressure was 3.5E-7 T. Current at 275 A is 30nA.
Continue cathode heating to 290 A during meeting.
Start seeing some electron current from the cathode around 275 A.
Entry  Friday, January 18, 2013, 15:57, Anders Mjos, , , , , , , Problems/Solutions, Conductor bolts to be replaced Model.jpgdamaged_bolt.JPG
After the last test at the test stand, one of the conductor bolts (ITD0058) is damaged. To prevent damage to the thread inserts, all conductor bolts
will be replaced with new ones.
Entry  Friday, February 16, 2024, 10:30, Aaron Schmidt, SiC# (Stock), HP-FEBIAD, , , 45447-4, 45235-21, In progress, Conditioning stock SiC HP FEBIAD Stock_SiC_Elog_996_HP-FEBIAD_Cathode_BM_-_HV_&_Coil.docxHP-FEBIAD_Elog_996_-_Ramp_up_&_mass_scans.docxStock_SiC_Elog_996_HP-FEBIAD_Cathode_BIAS_mode_-_2.docx
Friday, February 16, 2024, 10:30: Roughing
Friday, February 16, 2024, 17:38: TP1B on. 
Friday, February 16, 2024, 17:47: TP1A on. 
Entry  Thursday, February 08, 2018, 14:44, Carla Babcock, , , , , , , Done, Conditioning station power supply integrated into EPICS 
The 75kV power supply is now in EPICS under the usual TSG:BIAS controls. The upper limit has been set to 70kV to protect the transformer.
Entry  Thursday, May 30, 2024, 16:00, Aaron Schmidt, , LP-FEBIAD, , , 44692-4, 45235-18, In progress, Conditioning spare FEBIAD 
Anode short repaired (Should be :) )
Thursday, May 30, 2024, 15:56: Roughing.
Thursday, May 30, 2024, 16:10: Waterline FS#5 open. Vacuum ok & roughing down.
Entry  Friday, August 30, 2013, 15:09, Anders Mjos, NiO#2, HP-FEBIAD, ITE, TM3, 39530-6, 39069-4, Done, Conditioning of NiO#2 2013-09-12_NiO#2_TBHT_jump.PNG
Friday, August 30, 2013, 15:09 : Turbos stopped in preparation for installation. 
Friday, August 30, 2013, 16:22: Venting
Friday, August 30, 2013, 17:08: Roughing with NiO#2
Entry  Friday, August 31, 2018, 12:27, Aaron Schmidt, nSiC#1, LP-SIS, ITW, TM2, 43044-1, 42752-4, In progress, Conditioning nSiC#1 15x
Friday, August 31, 2018, 12:27: Roughing.
Friday, August 31, 2018, 13:19: Turbo pumps started.

Wednesday, September 05, 2018, 11:03: RGA on.
Entry  Wednesday, April 17, 2024, 14:16, Aaron Schmidt, Empty (Online), LP-FEBIAD, ITW, TM4, 45447-24, 42972-8, In progress, Conditioning empty FEBIAD for online use - Run 2 2024_-_ITW-_TM4_LP_FEBIAD_-_2.docx
https://elog.triumf.ca/TIS/Test-Stand/1003
EE Issue resolved. TS closed up.
Wednesday, April 17, 2024, 14:08: IV4 opened. Vacuum @ 5.26e-07T.
Entry  Tuesday, April 09, 2024, 16:01, Aaron Schmidt, Empty (Online), LP-FEBIAD, ITW, TM4, 45447-24, 42972-8, In progress, Conditioning empty FEBIAD for online use EE_issue_-_Conditioning_LP-FEBIAD_ITW-TM4.docx2024_-_ITW-_TM4_LP_FEBIAD.docx
Tuesday, April 09, 2024, 15:25: Roughing.

Wednesday, April 10, 2024, 05:41: TP1B on. 
Wednesday, April 10, 2024, 05:47: TP1A on. 
Entry  Tuesday, May 14, 2019, 10:22, Aaron Schmidt, ZrC#8, LP-SIS, ITE, TM2, 43044-5, 42972-3, In progress, Conditioning ZrC#8 HS ZrC#8.docxTS-2019-05-14-11-05.rgaTS-2019-05-16-07-30.rgaTS-2019-05-21-07-10.rgaITE-TM2-ZrC#8-LP-SIS_Test_Stand.docx
Tuesday, May 14, 2019, 10:21: Roughing
Tuesday, May 14, 2019, 10:51: Turbo pumps on.
Tuesday, May 14, 2019, 11:05: Ion gauge, RGA on.
Entry  Monday, January 22, 2024, 13:55, Aaron Schmidt, , LP-SIS, , , 45447-19, 45235-22, In progress, Conditioning UCx HS - 2 
Conditioning HS for UCx. LP-SIS oven / end caps installed
Monday, January 22, 2024, 13:53: Roughing.
Monday, January 22, 2024, 14:21: TP1B On.
Entry  Thursday, January 18, 2024, 10:49, Aaron Schmidt, , LP-SIS, , , 44139-2, 45235-22, In progress, Conditioning UCx HS  
Straight/closed TGHT tube oven installed. SIS Assembly.
Thursday, January 18, 2024, 10:32: Roughing.
Thursday, January 18, 2024, 10:57: TP1B on.
Entry  Tuesday, January 31, 2023, 10:42, Aaron Schmidt, , LP-SIS, , , 44062-1-SK, 45235-7, In progress, Conditioning UC#x assembly 
SK Series of LP-SIS targets are for conditioning only.
Tuesday, January 31, 2023, 10:39: Roughing. (Took quite a bit of effort to get the doors to shut. It's colder than usual in here. The seals were
stiff)
Entry  Thursday, February 02, 2023, 12:44, Aaron Schmidt, , LP-SIS, , , 44062-1-SK , 45235-1, In progress, Conditioning UC#x assembly 
SK Series of LP-SIS targets are for conditioning only.
Thursday, February 02, 2023, 12:41: Roughing.
Thursday, February 02, 2023, 12:43: BV1A open.
Entry  Wednesday, November 13, 2024, 14:36, Aaron Schmidt, UC#(47) - Not included, LP-SIS, ITE, TM3, 44691-8, 45235-24, In progress, Conditioning UC#47 (Assembly only) UC#47_empty_conditioning_test_1_-_Failed.docxUC#47_empty_conditioning_test_2.docx
Gas line is attached. 
Wednesday, November 13, 2024, 14:18: Roughing.
Wednesday, November 13, 2024, 18:20: Closed backing valves. Vacuum @ 2.140 T? 
Entry  Tuesday, October 29, 2024, 18:25, Aaron Schmidt, UC#46 (assembly only), LP-IG-LIS, ITW, TM4, , 42972-6 / 39956-1, In progress, Conditioning UC#46 Assembly 
 42972-6 Base / 39956-1 Lid
Tuesday, October 29, 2024, 18:20: Roughing. 
Tuesday, October 29, 2024, 18:52: TP1B on. 
Entry  Wednesday, October 18, 2023, 15:43, Aaron Schmidt, , LP-SIS, , , 45447-12, 45235-17, In progress, Conditioning UC#43 (empty) w/ gas line UC#43_Conditioning_empty_with_Gas_mod.docxUC#43_HS_with_gas_line_mod_-_Test_2.docxUC#43_HS_with_gas_line_mod_-_HV_Test.docx
Thermocouples attached on end plate
Indium salt @ 10 µl
3 wraps of Ta HS on oven. Gas line on center block. Empty oven.
Entry  Tuesday, November 15, 2022, 11:24, Aaron Schmidt, UC#41 assembly, LP-SIS, ITE, TM4, 45220-8, 45235-4, In progress, Conditioning UC#41 assembly UC#41_assembly_conditioning.docx
 LP-SIS 45220-8 is empty & for testing only.
Tuesday, November 15, 2022, 11:00: Roughing.
Tuesday, November 15, 2022, 11:21: BV1A open. 