Entry  Monday, October 15, 2018, 14:23, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Test FEBIAD w/ Silver bolts & sealed end caps  FEBIAD_Coil_Test_6-2_-_Neg_Cathode.docxTS-2018-10-15-14-15.rga
Anode / Cathode BIAS PS polarity reversed by John Chow. PS: Negative
Monday, October 15, 2018, 14:12: Power/sources on
Monday, October 15, 2018, 14:17: RGA on.
Entry  Monday, October 15, 2018, 14:38, Aaron Schmidt, , , , , , , Problems/Solutions, Anode / Cathode PS to Negative 
Monday, October 15, 2018, 13:00-14:00 Anode / Cathode BIAS PS polarity reversed by John Chow.
PS: Negative
Entry  Monday, October 22, 2018, 07:18, Aaron Schmidt, , , , , , , , TS restart after power outage 
Friday, October 19, 2018, 10:00 (Approx): Site wide power outage. TS completely shut down. 
Power brought back Saturday
Monday, October 22, 2018, 07:15: Full white out on screens. To restart PLC.
Entry  Monday, October 22, 2018, 11:07, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, In progress, Test FEBIAD w/ Silver bolts & sealed end caps  epics-plot-whiteout-181028_1322.PNGepics-whiteout-181028_1322.PNGFEBIAD_COIL_Test_6-3_Caps_in.docxTS-2018-10-22-09-47.rga
Restarted post power outage.
Water & Turbos on.
Monday, October 22, 2018, 10:55: Power / sources on. MB1?
Entry  Monday, October 29, 2018, 10:56, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, Problems/Solutions, TS communications issues. 
Sometime around 00:30 Sunday, October 28, 2018, the ISAC test stand lost communication to the PLC and shut down abruptly.
Monday, October 29, 2018, 09:00: PLC communications issues.
Rod N. was contacted this morning& the issues fixed by controls group.
Entry  Monday, October 29, 2018, 11:03, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 42752-5, Done, Test FEBIAD w/ Silver bolts & sealed end caps 
Restarting FEBIAD
Monday, October 29, 2018, 10:56: Restart roughing & Turbo pumps.
Monday, October 29, 2018, 11:03: Ion gauges on.
Entry  Tuesday, November 06, 2018, 08:52, Aaron Schmidt, , , , , , , In progress, Pump down empty chamber 
Tuesday, November 06, 2018, 08:50: Roughing
Tuesday, November 06, 2018, 08:51: Doors sealed.
Tuesday, November 06, 2018, 09:51: Turbo pumps on. 
Entry  Thursday, November 08, 2018, 10:54, Aaron Schmidt, , LP-FEBIAD, , , 395530-3, 42752-5, In progress, Test FEBIAD w/ Silver bolts & sealed end caps 
Silver bolts used on Coil, TGHT, & TBHT. Back panel opened for new gas bottles.
Thursday, November 08, 2018, 10:52: Roughing
Thursday, November 08, 2018, 10:53: Doors sealed.
Entry  Thursday, November 08, 2018, 14:13, Aaron Schmidt, , , , , , , , Ar & Ne gas bottle replacement. GasLeak_Datasheet.pdf
Thursday, November 08, 2018, 14:05: Fresh / recently calibrated Neon & Argon bottles installed.
Leak rates: Argon=2.02E-7 atm*cc/sec
                   Neon=1.75E-7 atm*cc/sec
Entry  Monday, November 19, 2018, 14:22, Aaron Schmidt, , , , , , , Problems/Solutions, Vacuum issues. 






Normal
0




false
false
false

EN-US
X-NONE
X-NONE

Entry  Wednesday, December 05, 2018, 10:22, Aaron Schmidt, , , , , , , Problems/Solutions, RGA Filament & Ionizer replacement 12x
RGA Ionizer & Filament replaced as per SRS RGA manual.
The ionizer was found to be dirty and the previous RGA filament was broken. Initially the  old filament appeared to have warped and looked
stuck to the anode grid/cage.
Entry  Thursday, December 06, 2018, 11:02, Aaron Schmidt, , , , , , , Problems/Solutions, FC0 Bellows Replacement. 20181206_Old_Bellows.jpg20181210_112528.jpg20181210_115310.jpg20181211_New_Bellows_installed.jpg
Thursday, December 06, 2018, 11:02: Turbo pumps (TP6 & TP2) off on beamline side. IG6 off.
Thursday, December 06, 2018, 14:06: Turbo pumps restarted. FC0 bellows replacement to occur Monday.

Monday, December 10, 2018, 11:00: Vented on beam side of IV4. Turbo pumps & backing valves closed preemptively on chamber side due
Entry  Wednesday, December 12, 2018, 13:22, Aaron Schmidt, , LP-FEBIAD, , , 395530-3, 42752-5, In progress, Anode leak current check. 
Wednesday, December 12, 2018, 13:15: Power / Sources on.
Wednesday, December 12, 2018, 13:20: RGA on / set.
Wednesday, December 12, 2018, 13:29: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV.
Entry  Monday, December 17, 2018, 12:03, Aaron Schmidt, , LP-FEBIAD, , , 395530-3, 42752-5, , Anode leak current check. 
Monday, December 17, 2018, 12:01: Connected Multimeter through feedthroughs J & L. Blue wire removed.
To run TGHT, TBHT, Anode ONLY. HV will remain locked with yellow tape over the keyhole. Currently locked out.

Tuesday, December 18, 2018, 08:37: Power / sources on
Entry  Thursday, December 20, 2018, 13:55, Aaron Schmidt, , LP-FEBIAD, , , 395530-3, 42752-5, , Holiday shut down. 
High winds caused a brief power outage that completely shutoff the ISAC test stand.
Locked out the power.
RGA checked & shutoff complete
Entry  Tuesday, January 08, 2019, 08:11, Aaron Schmidt, , LP-FEBIAD, , , 395530-3, 42752-5, In progress, TS restart  
Tuesday, January 08, 2019, 08:00: Epics white out fixed. Ref: Fault report 11981.
Tuesday, January 08, 2019, 08:10: IV4 reset. Turbo Pumps on
TMS:IG6 & TSG:IG1 not responding. Timing out. Edi contacted
Entry  Wednesday, January 09, 2019, 09:10, Aaron Schmidt, , , , , , , , Cathode to Anode. PS to Positive 
Wednesday, January 09, 2019, 09:09: Upper HV cage set to Anode / Positive as per dwg ISK4523D Rev 6.

Thursday, January 10, 2019, 10:00: Switch Anode PS to positive
Thursday, January 10, 2019, 11:29: Anode switched on. Short discovered. 10 V = 0 V & 100 mA.
Entry  Thursday, January 10, 2019, 11:38, Aaron Schmidt, , , , , , , , Power outtage prep 
Thursday, January 10, 2019, 11:32: Power down TS. Lock out.
Thursday, January 10, 2019, 11:36: RGA switched off full.
Thursday, January 10, 2019, 11:38: All ion gauge and turbos off. BV's closed.
Entry  Monday, January 14, 2019, 09:47, Aaron Schmidt, , , , , , , , TS restart after power outage 
Monday, January 14, 2019, 09:00: Epics white out
Ref: Fault report  11993 (11981 & 11817)
Monday, January 14, 2019, 09:35: Vacuum page came back. Restarted Roughing pumps. All other pages still in whiteout state.
Entry  Monday, January 21, 2019, 10:55, Aaron Schmidt, , , , , , , , 2019 Anode tests FM-1 
Monday, January 21, 2019, 10:50: RGA on.
Monday, January 21, 2019, 10:54: Waterlines opened. No response on RGA. Vacuum ok @ 8.4e-07. IG6 not responding. Ok for this test.
Monday, January 21, 2019, 11:00: Power / Sources on.