688
|
Monday, October 15, 2018, 14:23 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | Test FEBIAD w/ Silver bolts & sealed end caps | Anode / Cathode BIAS PS polarity reversed
by John Chow. PS: Negative
Monday, October 15, 2018, 14:12: |
|
689
|
Monday, October 15, 2018, 14:38 |
Aaron Schmidt | | | | | | | Problems/Solutions | Anode / Cathode PS to Negative | Monday, October 15, 2018, 13:00-14:00 Anode
/ Cathode BIAS PS polarity reversed by John
Chow. |
|
690
|
Monday, October 22, 2018, 07:18 |
Aaron Schmidt | | | | | | | | TS restart after power outage | Friday, October 19, 2018, 10:00 (Approx):
Site wide power outage. TS completely shut
down. |
|
691
|
Monday, October 22, 2018, 11:07 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | Test FEBIAD w/ Silver bolts & sealed end caps | Restarted post power outage.
Water & Turbos on.
Monday, October 22, 2018, 10:55: |
|
692
|
Monday, October 29, 2018, 10:56 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | Problems/Solutions | TS communications issues. | Sometime around 00:30 Sunday, October 28,
2018, the ISAC test stand lost communication
to the PLC and shut down abruptly. |
|
693
|
Monday, October 29, 2018, 11:03 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | Done | Test FEBIAD w/ Silver bolts & sealed end caps | Restarting FEBIAD
Monday, October 29, 2018, 10:56:
Restart roughing & Turbo pumps. |
|
694
|
Tuesday, November 06, 2018, 08:52 |
Aaron Schmidt | | | | | | | In progress | Pump down empty chamber | Tuesday, November 06, 2018, 08:50: Roughing
Tuesday, November 06, 2018, 08:51:
Doors sealed. |
|
695
|
Thursday, November 08, 2018, 10:54 |
Aaron Schmidt | | LP-FEBIAD | | | 395530-3 | 42752-5 | In progress | Test FEBIAD w/ Silver bolts & sealed end caps | Silver bolts used on Coil, TGHT, &
TBHT. Back panel opened for new gas bottles.
Thursday, November 08, 2018, 10:52: |
|
696
|
Thursday, November 08, 2018, 14:13 |
Aaron Schmidt | | | | | | | | Ar & Ne gas bottle replacement. | Thursday, November 08, 2018, 14:05: Fresh
/ recently calibrated Neon & Argon bottles
installed. |
|
697
|
Monday, November 19, 2018, 14:22 |
Aaron Schmidt | | | | | | | Problems/Solutions | Vacuum issues. |
Normal
0
|
|
698
|
Wednesday, December 05, 2018, 10:22 |
Aaron Schmidt | | | | | | | Problems/Solutions | RGA Filament & Ionizer replacement | RGA Ionizer & Filament replaced as
per SRS RGA manual.
The ionizer was found to be dirty |
12x |
699
|
Thursday, December 06, 2018, 11:02 |
Aaron Schmidt | | | | | | | Problems/Solutions | FC0 Bellows Replacement. | Thursday, December 06, 2018, 11:02: Turbo
pumps (TP6 & TP2) off on beamline side.
IG6 off. |
|
700
|
Wednesday, December 12, 2018, 13:22 |
Aaron Schmidt | | LP-FEBIAD | | | 395530-3 | 42752-5 | In progress | Anode leak current check. | Wednesday, December 12, 2018, 13:15: Power
/ Sources on.
Wednesday, December 12, 2018, 13:20: |
|
701
|
Monday, December 17, 2018, 12:03 |
Aaron Schmidt | | LP-FEBIAD | | | 395530-3 | 42752-5 | | Anode leak current check. | Monday, December 17, 2018, 12:01: Connected
Multimeter through feedthroughs J & L.
Blue wire removed. |
|
702
|
Thursday, December 20, 2018, 13:55 |
Aaron Schmidt | | LP-FEBIAD | | | 395530-3 | 42752-5 | | Holiday shut down. | High winds caused a brief power outage
that completely shutoff the ISAC test stand.
Locked out the power. |
|
703
|
Tuesday, January 08, 2019, 08:11 |
Aaron Schmidt | | LP-FEBIAD | | | 395530-3 | 42752-5 | In progress | TS restart | Tuesday, January 08, 2019, 08:00: Epics
white out fixed. Ref: Fault report 11981.
Tuesday, January 08, 2019, 08:10: |
|
704
|
Wednesday, January 09, 2019, 09:10 |
Aaron Schmidt | | | | | | | | Cathode to Anode. PS to Positive | Wednesday, January 09, 2019, 09:09: Upper
HV cage set to Anode / Positive as per dwg
ISK4523D Rev 6. |
|
705
|
Thursday, January 10, 2019, 11:38 |
Aaron Schmidt | | | | | | | | Power outtage prep | Thursday, January 10, 2019, 11:32: Power
down TS. Lock out.
Thursday, January 10, 2019, 11:36: |
|
706
|
Monday, January 14, 2019, 09:47 |
Aaron Schmidt | | | | | | | | TS restart after power outage | Monday, January 14, 2019, 09:00: Epics
white out
Ref: Fault report 11993 (11981 |
|
707
|
Monday, January 21, 2019, 10:55 |
Aaron Schmidt | | | | | | | | 2019 Anode tests FM-1 | Monday, January 21, 2019, 10:50: RGA on.
Monday, January 21, 2019, 10:54:
Waterlines opened. No response on RGA. Vacuum |
|
|