Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 38 of 53  Not logged in ELOG logo
  ID Date Authordown Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  570   Wednesday, February 15, 2017, 13:42 Aaron Schmidt    42218-1141751-6Problems/SolutionsVacuum Check (Water leak)*Vacuum from previous test still active,
minus turbo pumps. Same target, & heat
shield as well.*
  
  571   Tuesday, February 21, 2017, 10:35 Aaron Schmidt    42218-1141751-6Problems/SolutionsWater leak (E)(G)Water leak found on water block lines (E)
& (G) on FS #3.
Both lines were removed at the water
  
  572   Friday, March 10, 2017, 15:42 Aaron SchmidtUC#19   41882-441751-2In progressConditioning Heat shield for UC#19Friday, March 10, 2017, 15:40: Roughing.
Friday, March 10, 2017, 15:58: Turbo
pumps started.
 TS-2017-03-10-16-20.rgaOMEGA_OM-DAQPRO-5300_22-Mar-17_09.05.23.dlp 
  574   Friday, March 24, 2017, 14:43 Aaron SchmidtTa#51LP-SISITWTM241790-441751-5In progressConditioning Ta#51Friday, March 24, 2017, 15:40: Roughing.
Friday, March 24, 2017, 15:59: Turbo
pumps on.
 9x 
  575   Tuesday, April 04, 2017, 14:33 Aaron Schmidt       Power supply failure to E-rigWednesday, March 29, 2017, 15:15: DAC power
supply appears to have failed. Pop sound
and electrical smoke/smell noticed.
 20170330_094009.jpg20170330_094019.jpg20170407_115355.jpg20170407_115223.jpg20170407_115414.jpg 
  576   Thursday, April 06, 2017, 12:06 Aaron Schmidt HP-FEBIAD-CTL    In progressTri-Coil CTL-FEBIAD testThursday, April 06, 2017, 12:06: Roughing.
Thursday, April 06, 2017, 13:07:
Turbo pumps on.
  
  579   Tuesday, April 18, 2017, 07:46 Aaron Schmidt      Problems/SolutionsTSG:TP1B & TSG:BV1B trippedTuesday, April 18, 2017, 07:30: TSG : TP1B
Tripped on Saturday.
Tuesday, April 18, 2017, 07:40: TSG
 Cooling_&_Turbo_Replacement.docx 
  580   Tuesday, May 02, 2017, 14:03 Aaron Schmidt       Pump down empty chamber. (FS#3 out)Check to fit lines FS#3
Tuesday, May 02, 2017, 14:00: Rouging. 

Wednesday, May 03, 2017,
 20170504_133718.jpg20170504_133723.jpg20170504_133728.jpg20170504_133735.jpg 
  581   Thursday, May 04, 2017, 13:49 Aaron SchmidtUC#20LP-IG-LIS     Conditioning Heat shield for UC#20 (1)Thursday, May 04, 2017, 13:48: Roughing.
Thursday, May 04, 2017, 14:09: Turbos
on.
 UC#20_Heat_shield_conditioning-1.docxTS-2017-05-05-07-35.rga 
  582   Friday, May 05, 2017, 14:28 Aaron SchmidtUC#20LP-IG-LIS     Conditioning Heat shield for UC#20 (2) New O-rings installed on FS#3.
Friday, May 05, 2017, 14:24: Roughing.
Friday, May 05, 2017, 14:34: Waterlines
 UC#20_Heat_shield_conditioning-2.docxTS-2017-05-05-17-11.rgaTS-2017-05-11-07-50.rga 
  583   Wednesday, May 10, 2017, 15:07 Aaron Schmidt       Pump down empty chamber. (FS#3 out)FS#3 lines blanked off.
Wednesday, May 10, 2017, 14:40: Roughing
Wednesday, May 10, 2017, 15:05: Turbos
 05-11-2017_Water_leak.docx 
  584   Tuesday, May 16, 2017, 14:25 Aaron Schmidt HP-FEBIAD-CTL     Tri-Coil CTL-FEBIAD test IIICoil loose (Remove lid, Tighten and place
lid again)
Tuesday, May 16, 2017, 14:24: Roughing.
 8x 
  586   Monday, May 22, 2017, 09:43 Aaron Schmidt HP-FEBIAD-CTL     Tri-Coil CTL-FEBIAD test IVMonday, May 22, 2017, 09:41: Roughing.
Monday, May 22, 2017, 10:00: Turbo
pumps started.
 CTL_FEBIAD_Test_IV.docxTS-2017-05-22-10-07.rgaTS-2017-05-25-15-42.rga 
  588   Friday, June 02, 2017, 15:57 Aaron SchmidtSiC#36HP-FEBIAD-CTLITWTM241369-1042132-6/9 Conditioning SiC#36Friday, June 02, 2017, 15:20: Coil loose
(Remove lid, Tighten and place lid again)
Friday, June 02, 2017, 15:52: Roughing
 9x 
  590   Tuesday, June 06, 2017, 09:22 Aaron Schmidt       Pump down empty chamberTuesday, June 06, 2017, 09:21: roughing.

Friday, June 09, 2017, 08:50:
Ion gauge off. Turbo pumps off.
  
  591   Wednesday, June 07, 2017, 12:49 Aaron Schmidt       Gas bottles Gas bottles for FEBIAD testing were
exchanged yesterday around 1:30. One Neon
& one Argon bottle were removed.
  
  592   Friday, June 09, 2017, 13:28 Aaron SchmidtTa#52LP-SISITETM442218-1441751-8In progressConditioning Ta#52Friday, June 09, 2017, 13:27: Roughing.
Friday, June 09, 2017, 14:09: Turbo
pumps on.
 8x 
  593   Friday, June 16, 2017, 11:23 Aaron Schmidt       Pump down empty chamber.Friday, June 16, 2017, 11:22: roughing.
Friday, June 16, 2017, 14:28: Turbo
pumps on
  
  594   Friday, June 30, 2017, 13:31 Aaron SchmidtTa#53HP-SISITWTM242218-641751-6In progressConditioning Ta#53 Friday, June 30, 2017, 13:48: Roughing.
Friday, June 30, 2017, 14:26: Turbo
pumps on.
 Ta#53.docxTS-2017-06-30-14-35.rga 
  595   Thursday, July 06, 2017, 13:16 Aaron SchmidtTa#55LP-SIS  42218-1142738-2In progressConditioning Ta spare for Ta#52Thursday, July 06, 2017, 13:56: Roughing.
Thursday, July 06, 2017, 14:25: Turbo 
pumps started.
 10x 
ELOG V2.9.2-2455