Entry  Thursday, September 08, 2016, 09:12, Anders Mjos, , , , , , , Problems/Solutions, Filament change on IG6 
Thursday, September 08, 2016, 08:20: Vacuum group changed to the other filament to investigate vacuum spikes on IG6
Entry  Monday, December 02, 2019, 16:01, Fernando Maldonado, , , , , , , In progress, Ferran irradiation copper end plate tests (aka MIST) 
Friday: Test to validate Ferran's assembly. The plan is to ramp up to operating current, apply high voltage, and possibly extract beam.
Turbos on. IG1. Power on.

Monday, December 02, 2019, 15:59: Auto-ramp to 230/600 A for TBHT/TGHT @ 2A/min and 4A/min  (0.5A/15 s 1 A/15s.)
Entry  Thursday, July 21, 2016, 09:51, Aaron Schmidt, , LP-FEBIAD, , , , , , Febiad Test - NEW COIL - No PE 
Thursday, July 21, 2016, 08:55: Roughing.
Thursday, July 21, 2016, 09:50: Turbo pumps started.
Thursday, July 21, 2016, 09:54: Ion Gauge on.
Entry  Thursday, February 27, 2020, 07:20, Aaron Schmidt, , , , , , , , FS#3 - Fitting change out 
Thursday, February 27, 2020, 07:10: Swapped out an old brass fitting on the supply line going into FS#3 - Line K. 
Replaced w/ SS fitting for interchangeability w/ other lines in case a bypass is needed.
Entry  Friday, August 17, 2012, 08:30, Pierre Bricault, , , , , , , In progress, FEBIAD test with cathode biased 
Yesterday Ray Dube has changed the configuration in order to run the FEBIAD with the cathode on negative bias.
There were a short between the gas line and the common. The box has been opened and the short removed.
This morning I am turning on the cathode heater to 290 A.
Entry  Friday, August 17, 2012, 10:09, Pierre Bricault, , , , , , , In progress, FEBIAD test cathode bias 
Backing pressure on the bender section is quite large. TMSIG6 reads 5.09E-7 T and TMS:CG2B reads 0.249 T!
Entry  Friday, August 10, 2012, 12:44, Pierre Bricault, NA, LP-FEBIAD, , , NA, NA, In progress, FEBIAD test 
Rick put the helium bottle back in the rack.
Waiting for status of the gas lines.
 
Entry  Monday, August 13, 2012, 14:26, Pierre Bricault, , , , , , , In progress, FEBIAD test 
I am done with the FEBIAD test (anode biased)
We will swap the bias now to the cathode and change the polarity to negative.
Entry  Monday, August 13, 2012, 14:56, Pierre Bricault, , , , , , , In progress, FEBIAD test 
One thing that seems to be strange regarding this FEBIAD is the best results are without any current in the coil.
Normally for the neon ionization the on-line source wanted to be at around 50 to 80 Amp. Not this one.
Is there anything special about this coil?
Entry  Monday, March 01, 2021, 12:58, Fernando Maldonado, , LP-FEBIAD, , , , , Done, FEBIAD parameter scans v2 
 Monday, March 01, 2021, 12:57: Roughing
Monday, March 01, 2021, 13:30: Turbos on. Started a bit late as I was distracted. They were ready at around 13:26
Monday, March 01, 2021, 13:41: IG1 on. 
Entry  Thursday, February 18, 2021, 16:48, Fernando Maldonado, , , , , , , Failed, FEBIAD parameter scans 
Thursday, February 18, 2021, 15:19: Gas lines roughed and refilled. Gauge reads -50 kPa. Absolute pressure is 50 kPa.
IG1 @ 9.7 e-7 T.
Thursday, February 18, 2021, 15:27: BIAS/EZL/EE @ 30/13/1.5 kV. No sign of instabilities as before. Bias current=0.08 mA.
Entry  Friday, February 19, 2021, 13:44, Fernando Maldonado, , , , , , , Failed, FEBIAD parameter scans GND-COIL_spark.jpgGND-HS_spark.jpg
Friday, February 19, 2021, 13:28: Roughing
Friday, February 19, 2021, 13:43: Power on
Friday, February 19, 2021, 13:59: Turbos on
Entry  Monday, February 22, 2021, 18:25, Fernando Maldonado, , HP-FEBIAD, , , , , Done, FEBIAD parameter scans ESC_-_Feb_23_FEBAID_parameter_initial_checks.docxER-580-290-30kV-m28_2021-2-23.txt
Monday, February 22, 2021, 17:48 Roughing
Monday, February 22, 2021, 18:17: Turbos on.
Monday, February 22, 2021, 18:25: IG1 on.
Entry  Friday, May 27, 2022, 07:19, Fernando Maldonado, , , , , , , Done, FEBIAD parameter scan web-app and brief description (with links) 
A web-app for systematic FEBIAD parametrizations has been develop and  now includes the ISAC Test Stand (ITS) :
https://beta.hla.triumf.ca/degaussing/FEBIAD-scan/
Upon landing in the web-app the ITS will be selected by default as well as the TMS:FC6:SCALECUR faraday cup, which corresponds the last cup of
Entry  Friday, February 12, 2021, 16:38, Fernando Maldonado, , , , , , , Failed, FEBIAD parameter scan - efficiency measurements - energy spread. 
Friday, February 12, 2021, 16:37: FEBIAD installed with mechanical calibrated leak
Friday, February 12, 2021, 16:38: Roughing.
Gas lines opened all the way to the sour. SV4 and SV5.
Entry  Wednesday, June 30, 2021, 19:08, Fernando Maldonado, , LP-FEBIAD, , , , , Failed, FEBIAD parameter scan - efficiency measurements  anomalous-ionization-regime.pngFernando_screenshots.docx
Wednesday, June 30, 2021, 19:08: Roughing

Thursday, July 01, 2021, 08:57: Turbos on 
Thursday, July 01, 2021, 09:11: TP1A timed out. Reset it. Waiting for CG1A to drop a bit more. 
Entry  Friday, July 30, 2021, 16:28, Fernando Maldonado, , LP-FEBIAD, , , 41790-10, 44378-5, Done, FEBIAD parameter scan - efficiency measurements  
Restarting everything after swapping RP1 (see elog 889).


Friday, July 30, 2021, 16:14: IG1 @ 7.02e-7 T.
Entry  Tuesday, July 27, 2021, 12:57, Fernando Maldonado, , LP-FEBIAD, , , 41790-10, 44378-5, Failed, FEBIAD parameter scan - efficiency measurements 
Assembly has new gas tube to the target for better fit and clearance to the HS.
Electric checks before closing shows no short between TIS and HS.

Tuesday, July 27, 2021, 12:57: Venting
Entry  Wednesday, July 28, 2021, 08:48, Fernando Maldonado, , LP-FEBIAD, , , 41790-10, 44378-5, Failed, FEBIAD parameter scan - efficiency measurements 
Modified spiral tube from VCR to counteract torque towards the HS. Now points towards TBHT.

Electric checks before closing shows no short between TIS and HS.
Entry  Monday, July 26, 2021, 17:35, Fernando Maldonado, , LP-FEBIAD, , , 41790-10, 44378-5, Failed, FEBIAD efficiency measurements. 
 Monday, July 26, 2021, 17:23: Roughing
Monday, July 26, 2021, 17:55: Turbos on.
Monday, July 26, 2021, 18:03 : TP1A timed out ...again