  183   Monday, August 27, 2012, 13:21 Aurelia LaxdalNiO#1HP-FEBIADITETM4  In progressHV conditioning at Test Stand Did HV conditioning up to TSG:BIAS=30kV,
TSH=EE=-600V
Turned off the HV for Kazuya to check
  
  6   Friday, September 16, 2011, 12:39 Aurelia LaxdalTaC#1LP-SISITETM138634-636833-6In progressHV conditioningStarted the HV conditioning: TSG:BIAS=30kV
and TSH:EE=-700V.
  
  15   Wednesday, September 28, 2011, 16:33 Aurelia LaxdalSiC#26HP-FEBIADITETM438295-938307-8In progressHV conditioningStarted the HV conditioning: TSG:BIAS=30kV   
  368   Tuesday, April 01, 2014, 11:09 Aurelia LaxdalTiC#4HP-SISITETM3  In progressHV and Heaters Conditioning Started March 31, 2014: 
- did the HV conditioning up to 30kV.
April 1, 2014: 
 ITE-TM3-TiC#4-HP-SIS_Test_Stand_Conditioning.docx 
  369   Thursday, April 03, 2014, 16:46 Aurelia LaxdalTiC#4HP-SISITETM3  DoneHV and Heaters ConditioningHV and Heaters Conditioning had finished.
The target was cooled down and it's ready
for the on-line installation.
 ITE-TM3-TiC#4-HP-SIS_Test_Stand_Conditioning.docx 
  646   Monday, March 12, 2018, 10:07 Aaron Schmidt       HV Test w-gasMonday, March 12, 2018, 09:45: Gas lines
opened. Leak rate set. Vacuum @ 1.16e-06T
Monday, March 12, 2018, 10:00: RGA
  
  641   Wednesday, February 28, 2018, 11:50 Aaron Schmidt       HV Test NpNew parts installed. Corona Shield, brackets,
and board/spark gap orientation.
Wednesday, February 28, 2018, 11:48:
 2018_HV_test_Np.docx 
  413   Friday, December 12, 2014, 14:09 Anders Mjos LP-FEBIAD  Tube only In progressHV BIAS TestBIAS current limit pot changed from 2.40
to 0.25
EZL current limit pot changed from
 2014-12-17_60_kV_3h.png60_kV_Test.docx 
  422   Wednesday, January 21, 2015, 13:40 Anders Mjos      In progressHV BIAS TestWednesday, January 21, 2015, 13:34: Opened
water flow.
Wednesday, January 21, 2015, 13:42:
  
  102   Friday, June 01, 2012, 12:23 Aurelia LaxdalTa#38LP-SISITWTM1  In progressHV & Heaters conditioning.Did the HV conditioning.
Heaters conditioning in progress.
The Hall probe is not working: couldn't
  
  532   Monday, August 15, 2016, 08:09 Aaron Schmidt    41882-441751-4 HS Test OR CleanHeat Shield Test (OR Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge
 HS_41751-4_TEST.docxTS-2016-08-15-11-45.rga20160824_143550.jpg 
  533   Wednesday, August 17, 2016, 08:19 Aaron Schmidt    41882-441751-5 HS Test OR CleanHeat Shield Test (OR Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge
 HS_41751-5_TEST.docxTS-2016-08-17-11-45.rga20160824_143555.jpg20160824_143558.jpg 
  535   Wednesday, August 24, 2016, 09:16 Aaron Schmidt    41882-441751-6 HS Test OR CleanHeat Shield Test (OR only).
For all 6 tests:
-Start Turbo pumps & Ion gauge
 7x 
  529   Monday, August 08, 2016, 09:48 Aaron Schmidt    41882-441751-1 HS Test Full CleanHeat Shield Test (Fully Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge
 HS_41751-1_TEST.docxTS-2016-08-08-11-45.rga20160824_144103.jpg20160824_144106.jpg 
  530   Wednesday, August 10, 2016, 08:09 Aaron Schmidt    41882-441751-2 HS Test Full CleanHeat Shield Test (Fully Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge
 HS_41751-2_TEST.docxTS-2016-08-10-11-45.rga20160824_143539.jpg 
  534   Monday, August 22, 2016, 08:20 Aaron Schmidt    41882-441751-3 HS Test Full CleanHeat Shield Test (Fully Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge
 HS_41751-3_TEST.docxTS-2016-08-22-11-50.rga20160824_143544.jpg 
  952   Monday, December 19, 2022, 12:49 Carla Babcock HP-FEBIAD     HP-FEBIAD testsMonday, December 19, 2022, 12:06 : Tomislav
changed the polarity of the anode power supply
last week and everything has been closed
  
  956   Monday, January 16, 2023, 16:02 Aaron Schmidt HP-FEBIAD-CTL    In progressHP-FEBIAD testsExtra wraps of foil around the center block
(6) + 3 full wraps around the shield.
Monday, January 16, 2023, 15:40:
  
  854   Thursday, February 18, 2021, 15:15 Fernando Maldonado      DoneHLA testsThursday, February 18, 2021, 15:01: With
the help of Spencer Kiy, we tested the proper
communication from python to epics.
  
  849   Friday, February 12, 2021, 12:16 Fernando Maldonado      Problems/SolutionsGrounding collimator cable from outside Friday, February 12, 2021, 12:13:
Since the collimator is not used, Carla and
I installed a BNC short outside the cage.
 20210212_121227.jpg 