  384   Friday, June 13, 2014, 08:43 Anders MjosSiC#30HP-FEBIADITETM338481-839956-5DoneSiC#30 HV and Heaters Conditioning

    

       
            
  
  383   Thursday, June 12, 2014, 09:28 Anders Mjos      Problems/SolutionsElevated backing pressure on ISAC Test Stand TMS:RP2

    

       
            
  
  382   Monday, May 26, 2014, 14:15 Aurelia LaxdalSiC#30HP-FEBIADITETM3  DoneSiC#30 HV and Heaters Conditioning HV and Heaters Conditioning for SiC#30
was completed Friday, May 23, 2014. The target
was cooled down and it's ready for the on-line
 SiC#30_Conditioning_2nd_time.docx 
  381   Wednesday, May 21, 2014, 17:05 Aurelia LaxdalSiC#30HP-FEBIADITETM3  In progressSiC#30 HV and Heaters conditiongAs per Friedhelm the conditioning settings
are:


  
  380   Tuesday, May 20, 2014, 12:39 Anders Mjos      DoneFEBIAD Cathode Negative BIAS configurationAs per ISK4562 Rev 3 and ISK4563 Rev 3
By Ray D. and co.
  
  379   Tuesday, May 20, 2014, 11:17 Anders Mjos      Problems/SolutionsBurnt off GND connection on Service CapThe ground connection between B and F (ISK4523D
Rev 6) was found burnt off. It will be switched
out as per CATHODE BIAS configuration (ISK4563D
  
  378   Thursday, May 15, 2014, 14:58 Anders Mjos      Problems/SolutionsIOC rebooted to recover from white-out.Restarted archivers.   
  377   Monday, May 12, 2014, 14:20 Anders MjosSiC#30HP-FEBIADITETM338481-839956-5In progressConditioning SiC#30Monday, May 12, 2014, 14:14 : Roughing
Monday, May 12, 2014, 14:34: Starting
turbos
 SiC#30_Conditioning.docx 
  376   Friday, May 09, 2014, 10:48 Anders Mjos      Problems/SolutionsEPICS white-out e-fault 7380Monday, May 12, 2014, 10:02: Jane R. power
cycled the hardware. EPICS is back up. Sources
archiver required a restart.
  
  375   Thursday, May 08, 2014, 15:09 Anders Mjos      Problems/SolutionsSOURCES archiver reported stopped Archiver restarted.   
  374   Monday, April 28, 2014, 10:23 Anders Mjos      In progressCu-strip cleaning test - sample #2, cleanedMonday, April 28, 2014, 10:23: Started
roughing
Monday, April 28, 2014, 10:48: Started
  
  373   Wednesday, April 23, 2014, 14:16 Anders Mjos      DoneCu-strip cleaning test - sample #1, not cleanedWednesday, April 23, 2014, 14:15: Roughing
Wednesday, April 23, 2014, 14:34
: Starting turbos
 Front_2014-04-24_2_05_56_PM.jpgSide_2014-04-24_2_06_12_PM.jpg 
  372   Wednesday, April 23, 2014, 09:37 Anders Mjos      Problems/SolutionsStarted Sources archiverThe archiver was not running   
  371   Friday, April 04, 2014, 17:01 Rick MaharajUC#9LP-SISITWTM1 39230-3DoneConditioning Heatshield for UCx#9Friday, April 04, 2014, 16:26: Heatshield/Ionsource
assembly for UC LP SIS  installed in
test stand with Ta tube as heat load.
  
  370   Friday, April 04, 2014, 08:24 Anders MjosTiC#4HP-SISITETM3  In progressVenting 

    
  
  369   Thursday, April 03, 2014, 16:46 Aurelia LaxdalTiC#4HP-SISITETM3  DoneHV and Heaters ConditioningHV and Heaters Conditioning had finished.
The target was cooled down and it's ready
for the on-line installation.
 ITE-TM3-TiC#4-HP-SIS_Test_Stand_Conditioning.docx 
  368   Tuesday, April 01, 2014, 11:09 Aurelia LaxdalTiC#4HP-SISITETM3  In progressHV and Heaters Conditioning Started March 31, 2014: 
- did the HV conditioning up to 30kV.
April 1, 2014: 
 ITE-TM3-TiC#4-HP-SIS_Test_Stand_Conditioning.docx 
  367   Friday, March 28, 2014, 10:39 Anders MjosTiC#4HP-SISITETM3  In progressConditioning TiC#4NOTE:

TBHT Power Supply is 600A. EPICS thinks
  
  366   Friday, March 21, 2014, 14:12 Anders Mjos      Problems/SolutionsElevated backing pressure on ISAC Test Stand TMS:RP2The performance of the roughing pump has
gradually gone down. Notably after the system
has been vented. See attached screenshot
 TMSCG2_2014-03-21.png 
  365   Friday, March 21, 2014, 13:55 Anders Mjos      In progressPumping down empty chamberRoughing
Friday, March 21, 2014, 13:59: Starting
turbos
  