ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
435
|
Monday, April 13, 2015, 13:07 |
Anders Mjos | | | | | | | Problems/Solutions | ISAC Test Stand Optical elements power supply drop out | See e-fault 8027
Monday, April 13, 2015
Kevin and Graham are working on it
|
436
|
Wednesday, April 22, 2015, 13:17 |
Anders Mjos | | | | | | | | Source Tray Removed | by Mico, Dan and Anders |
437
|
Friday, April 24, 2015, 12:25 |
Anders Mjos | | | | | | | Problems/Solutions | Backing line pressure high | TSG:RP1 backing line pressure is >200 mT. An e-fault has been submitted to have the roughing pump replaced.
Friday, April 24, 2015, 13:13: Pump replaced by vacuum group. |
438
|
Friday, April 24, 2015, 12:26 |
Anders Mjos | | LP-FEBIAD | | TM2 | | 39230-1 | In progress | Testing new TM2 Source Tray | Photos on DocuShare
Friday, April 24, 2015
The source tray has been installed and inspected.
Friday, April 24, 2015, 12:32: Roughing
Friday, April 24, 2015, 13:33: Starting turbos. Vacuum at 0.24 T
Friday, April 24, 2015, 13:42: Turbos at speed.
Friday, April 24, 2015, 13:43: 3.5E-5 T
Leak check performed with RGA and He pressurized on water line incl GE line to 50 psi. Doors and ANODE line blank off He sprayed. No response.
RGA response to He confirmed with FEBIAD gas leak.
Monday, April 27, 2015, 12:00: Ge water open.
Monday, April 27, 2015, 12:03: Water open
Monday, April 27, 2015, 15:07: Electrical check completed OK. Test results attached. Tested low voltage on EZL, CB1, VCB1, CBC, EE, ANODE and BIAS
Monday, April 27, 2015, 15:15: Turbos stopped. Colimator connected to HS lines (60 kV). Should be on GND potential.
Monday, April 27, 2015, 16:00: Roughing
Monday, April 27, 2015, 16:30: Starting turbos
Monday, April 27, 2015, 16:40: Turbos at speed. Vacuum at 1.8E-5 T
Tuesday, April 28, 2015, 09:46: Starting auto-ramping of heaters to 100 / 100 A at 2 A/min 3E-6 / 4E-6 T good/bad vacuum limits.
Tuesday, April 28, 2015, 10:38: Continue auto-ramping TGHT to 200 A
Tuesday, April 28, 2015, 11:15: Optics and steerers on.
Tuesday, April 28, 2015, 11:34: Continue auto-ramping TGHT to 250 A
Tuesday, April 28, 2015, 12:50: Continue auto-ramping TGHT/TBHT to 300 /150 A
Tuesday, April 28, 2015, 13:30: Continue auto-ramping TGHT/TBHT to 400 /200 A
Tuesday, April 28, 2015, 14:24: Continue auto-ramping TGHT/TBHT to 500 /250 A
Wednesday, April 29, 2015, 06:06: Starting auto-ramp down.
Wednesday, April 29, 2015, 09:09: ANODE to 200 V. No current.
Wednesday, April 29, 2015, 09:16 : ANODE to 300 V. No current.
Wednesday, April 29, 2015, 09:16: EE to 2kV. 691 uA
Wednesday, April 29, 2015, 09:17: ANODE off. EE to 1.5 kV
Wednesday, April 29, 2015, 09:20: BIAS/EZL at 5/5 kV
Wednesday, April 29, 2015, 09:26: BIAS/EZL at 7.5/5 kV
Wednesday, April 29, 2015, 09:32 : BIAS/EZL at 10/5 kV
Wednesday, April 29, 2015, 09:47: BIAS/EZL at 15/7.5 kV
Wednesday, April 29, 2015, 10:04: BIAS/EZL at 20/10 kV
Wednesday, April 29, 2015, 10:20: BIAS/EZL at 25/12.5 kV
Wednesday, April 29, 2015, 10:48: BIAS/EZL at 30/15 kV. 2 sparks in 10 min on BIAS
Wednesday, April 29, 2015, 10:54: No sparks for 10 min
Wednesday, April 29, 2015, 12:01: BIAS/EZL at 40/20 kV
Wednesday, April 29, 2015, 12:48: No spark for the last 15 min. 3 sparks in the last 30 min
Wednesday, April 29, 2015, 13:09: BIAS/EZL at 45/22.5 kV
Wednesday, April 29, 2015, 13:45: BIAS/EZL at 50/25 kV
Wednesday, April 29, 2015, 14:53: Sparking above 50 kV. Loosing EPICS communication.
Wednesday, April 29, 2015, 15:46: BIAS/EZL at 53/27.5 kV
Wednesday, April 29, 2015, 16:11: BIAS/EZL at 53/27.5 kV. No sparks for 15 min
Wednesday, April 29, 2015, 16:19: BIAS/EZL/EE off for today
Thursday, April 30, 2015, 08:37: BIAS/EZL at 40/20 kV. EE at 1.5 kV. IG1 at 7.1E-7 T
Thursday, April 30, 2015, 08:55: BIAS/EZL at 50/25 kV
Thursday, April 30, 2015, 09:10: 1 spark in the last 15 min
Thursday, April 30, 2015, 09:32: BIAS/EZL at 53/25 kV
Thursday, April 30, 2015, 09:42: No sparks for 10 min
Thursday, April 30, 2015, 09:53: BIAS/EZL at 54/25 kV
Thursday, April 30, 2015, 10:00: Sparking caused lost EPICS communication.Manually current limiting PS
Thursday, April 30, 2015, 10:25: BIAS/EZL at 53/25 kV
Thursday, April 30, 2015, 10:31: BIAS/EZL at 54/25 kV
Thursday, April 30, 2015, 10:47: BIAS/EZL at 55/25 kV
Thursday, April 30, 2015, 10:53: BIAS/EZL at 55/27.5 kV. No sparks for 5 min
Thursday, April 30, 2015, 10:57: No sparks for 10 min.
Thursday, April 30, 2015, 11:01: BIAS/EZL at 55/30 kV
Thursday, April 30, 2015, 11:17: No sparks for 30 min.
Thursday, April 30, 2015, 11:19: BIAS at 30 kV
Thursday, April 30, 2015, 11:36: ANODE to 200 V. COIL is limited in EPICS to 0A and 0V
Thursday, April 30, 2015, 11:41: Opened isolation valve
Thursday, April 30, 2015, 11:42: Autoramping heaters to 500 / 250 A at 4/2 A/min. Good vacuum 2E-6 T, bad vacuum 3E-6 T
Thursday, April 30, 2015, 12:01: No EZL sparks for 60 min
Thursday, April 30, 2015, 12:03: EZL to 14 kV
Thursday, April 30, 2015, 13:50: Continue ramping to 580 / 300 A at 1/1 A/min
Troubleshooting FEBIAD coil power supply
Thursday, April 30, 2015, 14:10: Pumping on gas lines.
Thursday, April 30, 2015, 14:18: Tripped heaters when opening gas line to vacuum.
Thursday, April 30, 2015, 14:20: Autoramping heaters 500 / 250 A at 6/3 A/min.
A large (water?) leak opened up with target close to max temperature. Water lines were pressurized in an attempt to identify the leaky line. The test yesterday were not conclusive and was repeated this morning with no He response. The vacuum did not improve over night.
Friday, May 01, 2015, 10:08: Venting
Left coil line removed.
Friday, May 01, 2015, 11:10: Roughing
Friday, May 01, 2015, 11:41: Started turbos
With the leak detector pumping on the left coil line, a large leak could be confirmed at the soldering site. |
Attachment 1: TM2_Source_Tray_in_Test_Stand_-_Electrical_Check.pdf
|
|
Attachment 2: TM2_Source_Tray_in_Test_Stand_FEBIAD_Coil_Water_Leak.pdf
|
|
Attachment 3: TM2_Source_Tray_Test_FEBIAD_Target.docx
|
Attachment 4: TM2_Source_Tray_Coil_Leak_2015-04-30.png
|
|
439
|
Monday, May 04, 2015, 09:51 |
Anders Mjos | | | | | | | Problems/Solutions | FEBIAD Coil power supply replaced | Power supply did not work after high voltage conditioning. On Friday May 1st John Chow replaced the power supply with a 12 V 100 A power supply temporary while the other supply is being repaired. EPICS controls have not been adjusted. |
440
|
Friday, May 08, 2015, 09:07 |
Anders Mjos | | | | | | | Problems/Solutions | EPICS lost contact with the PLC | Everything shut down, while EPICS showed everyhing to be on.
Controls group (Dave Morris) has reestablished contact. System is operations.
TSG section vented for Source Tray work
Friday, May 08, 2015, 09:13: TMS turbos at speed. Vacuum at 1.2E-5 T |
441
|
Wednesday, May 13, 2015, 13:27 |
Anders Mjos | | LP-FEBIAD | | TM2 | | 39230-1 | In progress | Re-testing new TM2 Source Tray | NOTE: COIL PS is a 100 A supply, thus actual COIL current is 0.5x COIL set point.
Changed the FEBIAD connector blocks to have copper tubes exit below the block. Extended ANODE wire to allow it to be wrapped around Cu-tubes and keep it further away from the GE lines.
Wednesday, May 13, 2015, 13:45: Roughing
Wednesday, May 13, 2015, 14:13: Starting turbos
Wednesday, May 13, 2015, 14:23: Turbos at speed. Vacuum at 4.6E-5 T
Thursday, May 14, 2015, 09:27: He pressure tested waterlines to 70 psi He. No response on the RGA. Vacuum 3.3E-6 T
Thursday, May 14, 2015, 09:39: Opened water supply. No increase on the RGA or IG
Thursday, May 14, 2015, 10:04: Tested COIL to 50 A set point (= 25 A). Returned to 0 A.
Thursday, May 14, 2015, 10:09: Auto-ramping to 400 / 200 A at 4 / 2 A/min. Good/Bad vacuum 4E-6 / 5E-6 T
Thursday, May 14, 2015, 13:59: COIL at 50 A
Thursday, May 14, 2015, 21:57 : Starting cool down.
Friday, May 15, 2015, 06:25: Stopped turbos
Friday, May 15, 2015, 07:42 : Venting
C-seals installed.
Friday, May 15, 2015, 13:56: Roughing
Friday, May 15, 2015, 14:28 : Staring turbos
Friday, May 15, 2015, 14:38: Turbos ate speed. Vacuum at 3.9E-5 T
Tuesday, May 19, 2015, 07:31: Vacuum at 7.1E-7 T. Pumping on gas lines
Tuesday, May 19, 2015, 07:35: Water lines opened. Vacuum stable at 7.1E-7 T. No response on RGA
Tuesday, May 19, 2015, 07:43: Opened gas lines (SV5)
Tuesday, May 19, 2015, 07:47: Auto-ramping to 400 / 200 A at 4 / 2 A/min. Good/Bad vacuum 2E-6 / 4E-6 T
Tuesday, May 19, 2015, 08:46: ANODE and COIL to 200 V and 50 A
Tuesday, May 19, 2015, 09:39: Auto-ramping to 500 / 250 A at 2 / 1 A/min. Good/Bad vacuum 2E-6 / 4E-6 T
Tuesday, May 19, 2015, 10:54: Opened IV4
Tuesday, May 19, 2015, 11:14: Atuo-ramping to 270 A. BIAS/EZL/EE at 30 / 15 / 1.5 kV
Tuesday, May 19, 2015, 11:42: BIAS/EZL/EE to 20 / 10 / 1.5 kV
Wednesday, May 20, 2015, 09:55: Auto-ramping to 500 / 250 A at 4 / 2 A/min. Good/Bad vacuum 2E-6 / 4E-6 T
Wednesday, May 20, 2015, 09:57: BIAS/EZL/EE at 30 / 15 / 1.5 kV
Wednesday, May 20, 2015, 11:57: Auto-ramping to 580 / 290 A at 2 / 1 A/min.
Wednesday, May 20, 2015, 12:55: Vacuum excursion during beam tuning. Stopped turbos.
A leak was observed on the left coil conductor again. After inspecting the service cap, it was found that there was no water flow going through the left coil line due to differences in routing between the TM2 and the Test Stand source tray. A new coil line will be made and the water and electrical connections on the service cap will be reconfigured. |
442
|
Tuesday, May 19, 2015, 19:10 |
Anders Mjos | | | | | | | Problems/Solutions | EPICS white out | Likely caused by the PLC. e-fault 8139
Wednesday, May 20, 2015
Dave Morris re-established contact with controls. (PLC IOC was down). |
443
|
Thursday, May 21, 2015, 16:40 |
Anders Mjos | | | | | | | Problems/Solutions | Reconfigured service cap coil connections | The service cap has been reconfigured (colling and electric) to be compatible with the TM2 Source tray. Coil- is E & F , Coil+ is G & H. |
Attachment 1: TestStandSourceTray.jpg
|
|
Attachment 2: TM2SourceTray.jpg
|
|
444
|
Thursday, May 21, 2015, 17:26 |
Anders Mjos | | LP-FEBIAD | | TM2 | | | In progress | Re-testing new TM2 Source Tray | Thursday, May 21, 2015, 17:26: Roughing
Thursday, May 21, 2015, 18:02: Turbos started
Thursday, May 21, 2015, 18:12: Turbos at speed. Vacuum at 4.7E-5 T
Friday, May 22, 2015, 08:00: Opened water. Vacuum stable at 3.4E-6 T. No response on RGA
Friday, May 22, 2015, 08:10: Pumping on gas line
Friday, May 22, 2015, 08:21: Opened gas line.
Friday, May 22, 2015, 08:30: Auto-ramping to 500 / 250 A at 4/2 A/min. Good/bad vacuum 4E-6 and 5E-6 T
Friday, May 22, 2015, 08:35: BIAS/EZL/EE to 10 / 10 / 1.5 kV. COIL 50 A, ANODE 200 V
Friday, May 22, 2015, 12:16: Opened IV4
Friday, May 22, 2015, 14:59: BIAS/EZL/EE to 30 / 15 / 1.5 kV
Friday, May 22, 2015, 15:29 : Auto-ramping to 580 / 270 A at 2/1 A/min.
Saturday May 23 15:10 TGHT: 7.51 V 580 A, TBHT: 2.23 V 270 A, ANODE 200 V 13.4 mA, FC0 1.5e-8 A, IG1 1.9e-6 T, COIL 0 V 0 A not responding, some bias sparking over last 7 hours
Monday, May 25, 2015, 09:07: EE current limiting. Started auto-cool down at 4/2 A/min. Vacuum 1.2E-6 T
Monday, May 25, 2015, 09:37: BIAS and EZL to 0
Monday, May 25, 2015, 10:34 : Closed IV4
Monday, May 25, 2015, 11:56 : Cool down complete. Stopped turbos.
Monday, May 25, 2015, 13:17: Venting
Monday, May 25, 2015, 13:25: HS cooling circuit purged.
Monday, May 25, 2015, 14:25: The EE water line was found to be touching the COIL lines on the source tray. |
Attachment 1: TM2_Source_Tray_Test_FEBIAD_Target_Test_3.docx
|
Attachment 2: 2015-05-22_Flow.xlsx
|
445
|
Thursday, May 21, 2015, 17:38 |
Anders Mjos | | | | | | | Problems/Solutions | Installed equipment for measuring outgassing rate | A gauge and a valve was installed on the roughing line to the large turbo pump |
447
|
Wednesday, May 27, 2015, 14:19 |
Anders Mjos | | LP-FEBIAD | | TM2 | | | In progress | Re-testing new TM2 Source Tray | Wednesday, May 27, 2015, 14:19: Roughing
Wednesday, May 27, 2015, 14:50: Turbos started
Wednesday, May 27, 2015, 15:00: Turbos at speed. Vacuum at 1.6e-5 T
Thursday, May 28, 2015, 08:13: Water opened on HS line. Vacuum stable at 4.3E-7 T. No response on RGA
Thursday, May 28, 2015, 08:17: Pumping on gas line.
Thursday, May 28, 2015, 08:37: Open gas lines.
Thursday, May 28, 2015, 08:50: Started auto-ramping to 500 / 250 A at 4/2 A/min.
Thursday, May 28, 2015, 08:55: ANODE 200 V, COIL 50 A
Thursday, May 28, 2015, 08:52: Opened IV4
Thursday, May 28, 2015, 09:01: BIAS/EZL/EE to 30 / 15 / 1.5 kV
Thursday, May 28, 2015, 10:56: Continue auto-ramping to 580/290 A at 2/2 A/min
Thursday, May 28, 2015, 13:01: Ramping TBHT to 300 A
Friday, May 29, 2015, 08:23: ANODE current limited. Increased limit to 125 uA
Friday, May 29, 2015, 08:25: TPS:Q1 and Q4 found to be off. Switched back on
Friday, May 29, 2015, 14:38: Starting cool down of source.
Friday, May 29, 2015, 15:34: Close IV4
Friday, May 29, 2015, 15:36: BIAS/EZL/EE, COIL and ANODE off
Monday, June 01, 2015, 08:23: Vacuum at 2.8E-7 T. BIAS/EZL to 30 / 15 kV
Monday, June 01, 2015, 08:37: BIAS/EZL to 40 / 20 kV
Monday, June 01, 2015, 09:05: BIAS/EZL to 50 / 25 kV
Monday, June 01, 2015, 09:17: BIAS/EZL to 40 / 20 kV (target hand over to RH)
Monday, June 01, 2015, 09:50: BIAS/EZL to 50 / 25 kV
Monday, June 01, 2015, 10:08: BIAS/EZL to 55 / 25 kV. No sparks so far.
Monday, June 01, 2015, 10:28: EZL to 30 kV
Monday, June 01, 2015, 11:03: 2 sparks last 30 min
Monday, June 01, 2015, 11:48: 5 BIAS sparks last 80 min
Monday, June 01, 2015, 11:49: BIAS /EZL/ EE off
Monday, June 01, 2015, 15:38: Stopped TP1B for out-gassing measurement tomorrow.
Tuesday, June 02, 2015, 10:28: Stopped TP1A.
Tuesday, June 02, 2015, 13:57: Water lines purged. GE line closed (not purged).
Wednesday, June 03, 2015, 08:25: Venting |
Attachment 1: TM2_Source_Tray_Test_FEBIAD_Target_Test_4.docx
|
Attachment 2: TM2_Source_Tray_in_Test_Stand_-_Test_Results.pdf
|
|
448
|
Wednesday, June 03, 2015, 09:35 |
Anders Mjos | | | | | | | Problems/Solutions | PLC upgrade | Wednesday, June 03, 2015, 09:35: TP6 and TP2 off
Wednesday, June 03, 2015, 10:15: Upgrade in progress. |
449
|
Monday, June 15, 2015, 14:07 |
Anders Mjos | | | | | | | Problems/Solutions | Test Stand Source Tray installed | Monday, June 15, 2015
Remaining items to do
- ANODE wire not yet attached
- FEBIAD COILS not yet reconfigured
Tuesday, June 16, 2015:
Coils reconfigured. See attached photo.
|
Attachment 1: Coils_configuration.jpg
|
|
451
|
Monday, June 22, 2015, 15:49 |
Anders Mjos | | | | | | | In progress | Installed new 9-pin feed through | No wires connected yet.
Monday, June 22, 2015, 15:48: Roughing
Tuesday, June 23, 2015, 09:05: Roughing vacuum does not go below 0.9 T. Venting to investigate.
Tuesday, June 23, 2015, 10:16: Turbos started at 0.9 T
Tuesday, June 23, 2015, 10:276: Turbos at speed. Vacuum at 7.5E-4 T
Tuesday, June 23, 2015, 10:32: Stopped turbos
Tuesday, June 23, 2015, 11:01: Venting
Tuesday, June 23, 2015, 11:22: Roughing
Tuesday, June 23, 2015, 13:37: Venting
Tuesday, June 23, 2015, 16:48: Leak found on the newly installed f/t.
Wednesday, June 24, 2015, 09:29: Venting
Replaced f/t with a blank off.Installed TM2 FEBIAD test target
Wednesday, June 24, 2015, 10:31: Roughing
Wednesday, June 24, 2015, 11:07: Started turbos.
Wednesday, June 24, 2015, 11:17: Turbos at speed. Vacuum at 3.3E-5 T
Thursday, July 09, 2015
Installed the fixed f/t. |
Attachment 1: 9-pin_feed_through.jpg
|
|
452
|
Thursday, June 25, 2015, 09:00 |
Anders Mjos | | LP-FEBIAD | | TM2 | | | | TM2 FEBIAD Test | Thursday, June 25, 2015, 09:00: Water on HS. No vacuum response.
Thursday, June 25, 2015, 11:48: Started auto ramping heaters.
Thursday, June 25, 2015, 17:14: Target at 580/275 A. BIAS/EZL/EE at 30 / 13.5 / 1.5 kV
Friday, June 26, 2015, 08:04: Stopped TP1B for outgasing measurements
Friday, June 26, 2015, 10:25: Performing outgasing measurements
Friday, June 26, 2015, 10:35: Starting TP1B.
Friday, June 26, 2015, 10:39: TP1B at speed.
Friday, June 26, 2015, 11:12: Started cool-down.
Friday, June 26, 2015, 11:47: BIAS/EZL/EE/COIL/ANODE off
Friday, June 26, 2015, 11:47: Closed IV4
Tuesday, June 30, 2015, 13:32: Venting |
453
|
Monday, June 29, 2015, 16:51 |
Friedhelm Ames | | | | | | | Problems/Solutions | TSG:BV1B closed | found TSG:TP1B tripped off. Closed TSG:BV1B as pressure at TSG:iG1 was rising. Pressure is coming down again.
Tuesday, June 30, 2015 by AM
Found the control cable not completely inserted. Inserted cable, which tripped TP1A. Started both turbo pumps again.
Tuesday, June 30, 2015, 09:54: Both turbos at speed.
Tuesday, June 30, 2015, 09:56: Stopped turobs. BV1B does not close when TP1B is switched off. Requested Dave Morris to look into it. All remaining BVs close when TP is swithced off in TMS and TSG sections. |
455
|
Monday, July 06, 2015, 09:29 |
Anders Mjos | | | | | | | Problems/Solutions | Replaced out gassing gauge on the backing line | |
456
|
Monday, July 06, 2015, 14:26 |
Anders Mjos | | | | | | | | Pumping down empty chamber | Monday, July 06, 2015, 14:26: Roughing
Wednesday, July 08, 2015, 09:26: Venting
Thursday, July 09, 2015, 11:42: Roughing
Thursday, July 09, 2015, 13:16: Turbos started.
Friday, July 10, 2015, 08:54 : Stopped turbos
Friday, July 10, 2015, 11:29 : Venting
Friday, July 10, 2015, 16:56: Roughing |
457
|
Monday, July 13, 2015, 17:19 |
Anders Mjos | | LP-SIS | | | | | In progress | SIS Cup insulator clamping test | Monday, July 13, 2015, 17:09: Roughing
Monday, July 13, 2015, 17:51: Turbos started
Monday, July 13, 2015, 18:01: Turbos at speed. Vacuum at 3.7E-5 T
Tuesday, July 14, 2015, 09:05: Opened HS water. No response on IG or RGA.
Tuesday, July 14, 2015, 09:12: Started auto-ramping to 300 / 150 A
Tuesday, July 14, 2015, 14:46: TGHT at 400 A, TBHT at 150 A. HS 27 C, SIS cup 76 C
Wednesday, July 15, 2015, 13:57: TGHT 580, TBHT 200. HS 20, SIS cup 120 C
Wednesday, July 15, 2015, 15:08: TBHT 220 A. HS 20, SIS Cup 133 C
Wednesday, July 15, 2015, 15:08: Started ramping down heaters.
Thursday, July 16, 2015, 08:52: Turbos stopped.
Thursday, July 16, 2015, 10:24: Venting
Reconfigured target to no clamping (standard SIS Cup configuration)
Thursday, July 16, 2015, 11:41: Roughing
Thursday, July 16, 2015, 13:40: Turbos started.
Friday, July 17, 2015, 08:47: Opened S water. No response on IG or RGA.
Friday, July 17, 2015, 08:51 : Started auto-ramping to 580 / 220 A
Friday, July 17, 2015, 13:30: TGHT at 560 A, TBHT at 220 A. HS 25 C, SIS cup 514 C
Friday, July 17, 2015, 14:10: TGHT at 580 A, TBHT at 220 A. HS 23 C, SIS cup 530 C
Friday, July 17, 2015, 15:56: Starting cool-down
Monday, August 10, 2015, 08:43: Turbos stopped. Vacuum at 2.9E-7 T
Monday, August 10, 2015, 14:42: Venting |
|