Wednesday, April 12, 2017, 16:04, Anders Mjos, , , , , , , Problems/Solutions, Leak on FS#3 COIL and EE
|
A water to vacuum leak has been found on FS#3. The leak is not detected on the leak detector, but can be seen as an increase in vacuum and on partial water pressure on the RGA
Wednesday, April 12, 2017, 17:11: The leak is on circuit EG (Coil +). Confirmed with water pressure
Wednesday, April 12, 2017, 17:21: RGA off. Turbos stopped.
Wednesday, April 19, 2017, 13:00: Leak detector hooked up to TS. (Check Turbo)
Wednesday, April 19, 2017, 14:00: He to FS#3.
Wednesday, April 19, 2017, 14:31: Minimal response on leak detector. No response on RGA.
Wednesday, April 19, 2017, 14:36: Manual valve closed. Leak detector off. RGA off.
Wednesday, April 19, 2017, 14:37: FS#3 purged.
Wednesday, April 19, 2017, 14:39: Ion gauge off. Turbos off.
Wednesday, April 19, 2017, 14:44: Leak detector disconnected.
Thursday, April 20, 2017, 07:35: Venting
Thursday, April 20, 2017, 09:10: TRI-COIL CTL-FEBIAD removed.
Thursday, April 20, 2017, 09:23: Water lines (E) (G) removed w/ block.
Thursday, April 20, 2017, 09:30: Roughing.
Thursday, April 20, 2017, 10:04: Turbos on.
Thursday, April 20, 2017, 13:15: Leak detector attached & turned on.
Thursday, April 20, 2017, 13:25: Water lines FS#5 opened to create loop. Pressurized @ 30 PSI.
Thursday, April 20, 2017, 13:45: RGA on.
Thursday, April 20, 2017, 13:58: All lines opened, purged, and re-pressurized @ 30 PSI with He.
Thursday, April 20, 2017, 14:15: Minimal response on Leak detector. No response on RGA.
Friday, April 21, 2017, 07:26: Vacuum @ 4.87E-07T. No He response on RGA. Lines still pressurized @ 30 PSI of Helium.
Friday, April 21, 2017, 10:19: Vacuum level close, but not optimal after 24 hrs. 2e-07T range is optimal.
Friday, April 21, 2017, 10:22: Adjustment of Turbo (TSG:TP1B) flanges. Stud Flange to Chamber (loose nuts found). brief vacuum spike noted.
Friday, April 21, 2017, 10:27: Turbo pump flange to Stud Flange tightened. No change on vacuum.
Friday, April 21, 2017, 10:41: Test Stand Exhaust cleaned. Clog noticed. Monitor Vacuum
Monday, April 24, 2017, 10:24: Three leaks found on FS#3. Two on the soldered ends of the VCRS (Mid-line) and one on the block. Requires repair/replacement.
Tuesday, May 02, 2017, 08:32 : RGA off.
Tuesday, May 02, 2017, 08:33: Ion gauge & Turbos off.
Tuesday, May 02, 2017, 12:55: Venting
|
Monday, April 10, 2017, 15:12, Anders Mjos, , , , , , , Problems/Solutions, Vacuum leak on front door
|
The vacuum behaved erratic over night with excursion up into the mid 10^-6 Torr range. To investigate the chamber was vented. With the doors open, the o-rings and sealing surfaces were cleaned. When pumping down again a vacuum leak could be heard at the front door by the lock. The chamber was vented again twice, finally the two o-rings were swapped. This removed the large leak. The door is prevented from contacting the box at the lock, which is likely the source of the leak. |
Thursday, April 06, 2017, 12:06, Aaron Schmidt, , HP-FEBIAD-CTL, , , , , In progress, Tri-Coil CTL-FEBIAD test
|
Thursday, April 06, 2017, 12:06: Roughing.
Thursday, April 06, 2017, 13:07: Turbo pumps on.
Thursday, April 06, 2017, 13:18: Ion gauge on.
Thursday, April 06, 2017, 13:25: RGA filament error FL5. RESET RGA.
Thursday, April 06, 2017, 13:34: RGA on.
Friday, April 07, 2017, 08:35: Waterlines opened. No response on RGA. Vacuum @ 3.24e-07T
Monday, April 10, 2017, 11:51: Vacuum unstable. Venting to investigate.
Monday, April 10, 2017, 11:52: Turbos stopped.
Monday, April 10, 2017, 14:57: Roughing.
Monday, April 10, 2017, 15:18: Turbos started.
Monday, April 10, 2017, 15:23: TP1 at speed. Opened gases.
Monday, April 10, 2017, 15:26: Turbos at speed. Vacuum at 2.0E-5 T
Tuesday, April 11, 2017, 16:55 : Stopped turbos.
Tuesday, April 11, 2017, 17:01: Venting through turbos to replace seals on HS
Tuesday, April 11, 2017, 17:48: Turbos started
Thursday, April 20, 2017, 09:10: Assembly removed from test stand. |
Tuesday, April 04, 2017, 14:33, Aaron Schmidt, , , , , , , , Power supply failure to E-rig
|
Wednesday, March 29, 2017, 15:15: DAC power supply appears to have failed. Pop sound and electrical smoke/smell noticed.
Tuesday, April 04, 2017, 14:15: Kepco BOP 500M power supply replaced with back up Kepco BOP 500M.
Tuesday, April 04, 2017, 14:32: No response from new power supply. All connections in OK. Further inquiry required.
It has been determined, due to the damage shown in the uploaded pictures, that theis power supply will need replacing. |
Friday, March 24, 2017, 14:43, Aaron Schmidt, Ta#51, LP-SIS, ITW, TM2, 41790-4, 41751-5, In progress, Conditioning Ta#51 9x
|
Friday, March 24, 2017, 15:40: Roughing.
Friday, March 24, 2017, 15:59: Turbo pumps on.
Friday, March 24, 2017, 16:04: Ion gauge on.
Friday, March 24, 2017, 16:07: RGA on. Turbo pumps @ speed.
Monday, March 27, 2017, 09:07: Water lines opened. No response on RGA. Vacuum @ 1.81e-07T
Monday, March 27, 2017, 09:10: Power on.
Monday, March 27, 2017, 09:50: Troubleshooting: Sources/Optics non-responsive. Controls group notified.
Monday, March 27, 2017, 11:16: Optics all green minus the magnet TMS : MB1. PLC issue reported.
Monday, March 27, 2017, 11:30: PLC reboot. Brief whiteout on screens. Screen function returned. TMS : MB1 still interlocked.
Monday, March 27, 2017, 14:30: TMS : MB1 no longer interlocked. Optics non-responsive to 'P/S On'. Voltages can be adjust while optics are 'in black'
Tuesday, March 28, 2017, 09:30: Optics still have error but can be run.
Tuesday, March 28, 2017, 09:43: BIAS / EZL / EE @ 30 / 13 / 1.5 kV . Spark noted while bring up BIAS.
Tuesday, March 28, 2017, 09:45: IV4 opened.
Tuesday, March 28, 2017, 11:13: RGA Fatal error. Restarted 11:15.
Tuesday, March 28, 2017, 12:57: Optics ok.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.5 |
3.89 |
TBHT |
27.3 |
3.00 |
COIL + EE |
27.1 |
4.94 |
TGHT |
27.1 |
5.59 |
Tuesday, March 28, 2017, 13:01: Auto ramping TGHT / TBHT to 300 / 100 A @ 2A per min.
Tuesday, March 28, 2017, 15:52: TGHT / TBHT @ 300 / 100. Vacuum @ 2.16e-07T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.5 |
3.85 |
TBHT |
26.7 |
3.12 |
COIL + EE |
25.8 |
4.92 |
TGHT |
26.5 |
5.59 |
Wednesday, March 29, 2017, 08:25: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Wednesday, March 29, 2017, 11:23: TMS : MB1 set from 'Reverse' to 'Normal' manually. Interlock Reset. (Mass Scan ok).
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
36.9 |
3.82 |
TBHT |
27.2 |
3.07 |
COIL + EE |
27.4 |
4.97 |
TGHT |
29.4 |
5.58 |
Wednesday, March 29, 2017, 13:09: Auto ramping TBHT to 220 A @ 2A per min.
Wednesday, March 29, 2017, 13:20: Source page @ 218.9A - Read back on power supply @ 219A. Fatal Error on RGA.
Wednesday, March 29, 2017, 13:27: Manually ramp TBHT to 230 A @ 2A per min (approx).
Wednesday, March 29, 2017, 15:15: DAC power supply appears to have failed. Pop sound and electrical smoke/smell noticed.
Wednesday, March 29, 2017, 15:28: Auto cooling TBHT to 220 A @ 2A per min.
Thursday, March 30, 2017, 08:42: Auto-cooling @ 2A per min.
Friday, March 31, 2017, 08:35: IV4 closed.
Friday, March 31, 2017, 08:44: Power/sources off.
Friday, March 31, 2017, 08:46: Ion gauge, Turbos off. Waterlines purged.
Thursday, April 06, 2017, 10:40: Venting |
Wednesday, March 22, 2017, 09:37, Anders Mjos, , , , , , , , Pump down empty chamber
|
Wednesday, March 22, 2017, 09:3: Roughing
Wednesday, March 22, 2017, 10:05: Turbos started
Friday, March 24, 2017, 11:01: Turbos off. Ion gauge off.
Friday, March 24, 2017, 14:42: Venting. |
Friday, March 10, 2017, 15:42, Aaron Schmidt, UC#19, , , , 41882-4, 41751-2, In progress, Conditioning Heat shield for UC#19
|
Friday, March 10, 2017, 15:40: Roughing.
Friday, March 10, 2017, 15:58: Turbo pumps started.
Friday, March 10, 2017, 16:19: Ion gauge on.
Friday, March 10, 2017, 16:22: RGA on.
Monday, March 13, 2017, 09:20: Water lines opened. No response on RGA. Vacuum @ 1.99e-07T
Monday, March 13, 2017, 09:38: Power/sources on
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.6 |
3.84 |
TBHT |
24.4 |
3.00 |
COIL + EE |
24.4 |
4.89 |
TGHT |
24.6 |
5.56 |
Monday, March 13, 2017, 09:42: Auto ramping TGHT to 580A @ 2A per min.
Monday, March 13, 2017, 11:58: Water: 95 PSI on Supply. 10 PSI on Return.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
26.1 |
3.82 |
TBHT |
26.3 |
3.20 |
COIL + EE |
24.7 |
4.95 |
TGHT |
25.4 |
5.56 |
Tuesday, March 14, 2017, 08:55: Vacuum @ 3.26e-07T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
34.0 |
3.85 |
TBHT |
25.9 |
3.11 |
COIL + EE |
24.9 |
4.98 |
TGHT |
26.8 |
5.57 |
Tuesday, March 14, 2017, 15:54:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
34.1 |
3.82 |
TBHT |
25.2 |
3.07 |
COIL + EE |
25.0 |
4.94 |
TGHT |
27.1 |
5.58 |
Tuesday, March 14, 2017, 15:55: Auto-cooling started @ 2A per min
Tuesday, March 21, 2017, 09:30: Power/Sources off.
Tuesday, March 21, 2017, 14:11: RGA off
Tuesday, March 21, 2017, 14:13: Ion gauge & Turbo pumps off.
by Anders
Wednesday, March 22, 2017, 08:47: Venting
Wednesday, March 22, 2017, 09:3: HS removed |
Tuesday, February 21, 2017, 10:35, Aaron Schmidt, , , , , 42218-11, 41751-6, Problems/Solutions, Water leak (E)(G)
|
Water leak found on water block lines (E) & (G) on FS #3.
Both lines were removed at the water blocks and the coil connection at the heat shield. They ends were blanked off.
Tuesday, February 21, 2017, 10:32: Roughing
Tuesday, February 21, 2017, 10:34: BV1B opened.
Tuesday, February 21, 2017, 10:51: Turbo pumps started.
Tuesday, February 21, 2017, 11:23: Ion gauge & RGA started. Vacuum @ 7.60E-06T.
Wednesday, February 22, 2017, 10:30: The test stand was pressurized with Air (HPA). The loop was completed through the heat shield line FS #5.
Pressurized @ 80 PSI w/ HPA. Monitor. No response on RGA or Vacuum.
Wednesday, February 22, 2017, 10:42: The test stand was pressurized with Helium. The loop was completed through the heat shield line FS #5. The air was purged from the lines using the Helium.
Pressurized @ 30 PSI w/ Helium. Monitor.
Wednesday, February 22, 2017, 11:57: De-pressurize the lines. No response on RGA.
Wednesday, February 22, 2017, 13:47: Pressurize line (G) @ 40 PSI w/ Helium directly.
Wednesday, February 22, 2017, 14:00: No response on RGA or Vacuum. Disconnect.
Wednesday, February 22, 2017, 14:03: Pressurize line (E) @ 38 PSI w/ Helium directly.
Wednesday, February 22, 2017, 14:30: No response on RGA or Vacuum. Disconnect.
Thursday, February 23, 2017, 08:11: RGA, Ion gauge, & Turbo pumps off.
Thursday, February 23, 2017, 10:21: Venting.
Thursday, February 23, 2017, 11:45 Lines (G)(E) reinstalled w/ new seals
Thursday, February 23, 2017, 11:58: Roughing.
Thursday, February 23, 2017, 13:00: Turbos on.
Thursday, February 23, 2017, 13:05: Ion Gauge on.
Thursday, February 23, 2017, 13:10: RGA on.
Friday, February 24, 2017, 08:15: Waterlines opened on FS #3.
Friday, February 24, 2017, 08:18: RGA froze.
Friday, February 24, 2017, 08:20: Restarted RGA.
Friday, February 24, 2017, 08:48: FS #2, #4, #5 all opened.
Friday, February 24, 2017, 10:20: Vacuum & Leak appear to be stable. Vacuum @ 2.54E-07T
Friday, February 24, 2017, 10:25: Cage re-installed on top of vacuum Chamber
Friday, February 24, 2017, 10:28: Power/sources on
Friday, February 24, 2017, 10:30: Auto ramping TGHT / TBHT to 580 / 200 A @ 4A per min. Heat check.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
21.4 |
4.06 |
TBHT |
22.2 |
3.28 |
COIL + EE |
21.2 |
5.16 |
TGHT |
21.4 |
5.82 |
Friday, February 24, 2017, 10:37: RGA froze (Fatal communication error message).
Friday, February 24, 2017, 10:40: RGA restarted.
Friday, February 24, 2017, 13:30: No major sign of leak detected. Standard response on Vacuum and RGA to heating.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
32.1 |
4.06 |
TBHT |
24.5 |
3.28 |
COIL + EE |
23.0 |
5.17 |
TGHT |
24.9 |
5.80 |
Friday, February 24, 2017, 13:55: Vacuum and water appear leveled off with no indication of a major leak.
Friday, February 24, 2017, 14:00: Auto-cooling started @ 4A per min.
Monday, February 27, 2017, 08:12: Power/sources off. The likely cause for the leak was one of the seals within lines (G)(E). Either one of the O-rings or VCR's. Once the seals were changed, no further leaks were detected.
Wednesday, March 08, 2017, 08:40: RGA timed out. RGA off. No leak detected.
Friday, March 10, 2017, 10:05: Water lines purged.
Friday, March 10, 2017, 10:09: Ion gauge & Turbos off.
Friday, March 10, 2017, 14:24: Venting. |
Wednesday, February 15, 2017, 13:42, Aaron Schmidt, , , , , 42218-11, 41751-6, Problems/Solutions, Vacuum Check (Water leak)
|
*Vacuum from previous test still active, minus turbo pumps. Same target, & heat shield as well.*
Wednesday, February 15, 2017, 13:38: Both Turbo pumps started.
Wednesday, February 15, 2017, 13:43: Ion gauge on. TP1B @ speed 42 KRPM.
Wednesday, February 15, 2017, 13:51: RGA on. Vacuum @4.79E-05T.
Monitor water & vacuum with the RGA.
Thursday, February 16, 2017, 09:05: Main water supply & return shut off to the test stand. Purged. Vacuum @ 7.13E-07T.
Thursday, February 16, 2017, 09:16: Vacuum @ 3.59E-07T. Confirms water leak
Thursday, February 16, 2017, 09:17: RGA stopped.
Thursday, February 16, 2017, 09:20: RGA restarted.
Thursday, February 16, 2017, 09:30: Open main supply & return water supply. Individual valves are closed.
Thursday, February 16, 2017, 09:35: Open supply and return to FS #2. Vacuum @ 3.24E-07T. No response on RGA
Thursday, February 16, 2017, 09:40: Open supply and return to FS #3. Vacuum @ 6.76E-07T. Response on RGA. (Leak detected)
Thursday, February 16, 2017, 09:42: Close main Supply & Return. Purge & close FS #2 & FS #3 . Allow vacuum to stabilize.
Thursday, February 16, 2017, 09:50: Open main supply & return water supply. Open supply and return to FS #3. Vacuum @ 6.76E-07T. Response on RGA. (Leak confirmed)
Thursday, February 16, 2017, 09:53: Close main Supply & Return. Purge & close FS #3 . Allow vacuum to stabilize.
Thursday, February 16, 2017, 09:55: Open main supply & return. All valves are closed. Vacuum @ 3.51E-07T
Thursday, February 16, 2017, 10:00: Open supply and return to FS #4. Vacuum @3.26E-07T. No response on RGA.
Water leak confirmed in FS #3
Thursday, February 16, 2017, 10:05: Close main Supply & Return. Purge & close FS #4 . Allow vacuum to stabilize.
Thursday, February 16, 2017, 10:37: RGA off.
Thursday, February 16, 2017, 10:38: Ion gauge. Turbos off
Thursday, February 16, 2017, 11:58: Venting
Friday, February 17, 2017, 14:10: Roughing.
Friday, February 17, 2017, 14:30: Both Turbo pumps started.
Friday, February 17, 2017, 14:36: Ion gauge on.
Friday, February 17, 2017, 14:44: RGA on. Vacuum @ 2.32E-05T. Note* Waterlines FS #3 currently pressurized with 38 PSI Helium.
Monday, February 20, 2017, 08:26: Vacuum @ 2.60E-07T
Leak is apparent on RGA via Helium. He @ 20 PSI
Monday, February 20, 2017, 09:55: He in line brought up to 40 PSI. Monitor on RGA.
Monday, February 20, 2017, 10:00: No response on RGA. Connectivity gaps?.
Monday, February 20, 2017, 10:05: RGA restarted.
Monday, February 20, 2017, 10:39: Top cage removed from test stand. Waterlines purged of Helium. Immediate drop in RGA Helium reading.
Monday, February 20, 2017, 11:23: FS #3 (K) re-routed with return from (F). EE (K) pressurized with He @ 20-30 PSI. No significant response on RGA. Purge He
Monday, February 20, 2017, 11:36: FS #3 (K) returned back to (G). Return connected through (E). Pressurized to 20-30 PSI. No significant response on RGA. Purge He
Monday, February 20, 2017, 11:46: FS #3 (K) routed through to (H). (F) return to return. Pressurized to 20-30 PSI. Left pressurized for one hour
Monday, February 20, 2017, 12:51: No response on RGA. He Purged.
Monday, February 20, 2017, 12:55: Re-pressurize all of FS #3 with He @ 30 PSI.
Monday, February 20, 2017, 13:00: Purge Helium. Switch to water.
Monday, February 20, 2017, 13:12: Water supply/return on. No response on RGA.
Monday, February 20, 2017, 13:22: Slow response noted on RGA. Slow climb on water observed.
Monday, February 20, 2017, 13:30: Slight increase from 2.52E-07T to 3.26E-07T noted on Vacuum. Purge water lines. Reconnect/route lines & Test.
Monday, February 20, 2017, 13:40: FS #3 (K) re-routed with return from (F). EE (K). Open waterlines & observe.
Monday, February 20, 2017, 13:57: No response on RGA or Vacuum. Purge water & Re-route lines.
Monday, February 20, 2017, 14:05: FS #3 (K) returned back to (G). Return connected through (E). Open waterlines & observe.
Monday, February 20, 2017, 14:10: The water leak is apparent on (G) & (E) route. Vacuum climbed from 2.80E-07T to 3.33E-07T. RGA shows increase on water.
Monday, February 20, 2017, 14:14: Purge water lines.
Monday, February 20, 2017, 14:21: FS #3 (K) routed through to (H). (F) return to return. Waterlines opened to rule out (F) & (H) route.
Monday, February 20, 2017, 14:30: No response on RGA. Vacuum Stable. Purge water & Re-connect lines back to standard.
Monday, February 20, 2017, 15:22: Intermittent purging. Flow meter paddles pick up speed with air if purged for too long.
Tuesday, February 21, 2017, 08:34: RGA off, Ion gauge off, Turbos off.
Tuesday, February 21, 2017, 09:32: Venting. |
Monday, February 06, 2017, 09:14, Aaron Schmidt, , , , , , , Problems/Solutions, Power outage.
|
Weekend power outage. All turbos were tripped. Epics white out. Control group notified.
Monday, February 06, 2017, 09:07: Turbo pumps TMS : TP2 & TMS : TP6 restarted.
Monday, February 06, 2017, 09:12: TMS: IG6 ion gauge restarted.
Monday, February 06, 2017, 10:14: Turbo pumps TSG : TP1A & TSG : TP1B restarted.
Monday, February 06, 2017, 10:19: Ion gauge on. TP1B @ speed 42 KRPM.
Monday, February 06, 2017, 10:22: TP1A @ speed 38 KRPM. |
Wednesday, January 25, 2017, 14:57, Aaron Schmidt, , , , , 42218-11, 41751-6, Done, Target cleaning test LP-SIS Full Clean
|
Target Test (Fully Cleaned vs Crystal Clean only).
For all tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
- Ensure previous test turbos are off by 8:15 and started venting by 9:15am to meet timeline.
-Start Roughing by 10:10am +/- 1 minute.
-TGHT / TBHT ramping starts @ 8:30am. 2A per min to 580A / 200A
ALL START TIMES MUST BE CONSISTENT.
***Pre-outgassed*** Heat Shield W.O# 41751-6: Includes insulators, new Al grounded 9-pin, bracket, & gripper arms. Blank/Plate. No source cup/EE.
HP-SIS Target # 42218-11: Full Clean. Crystal Clear, Acetone, & Methanol used.
Thursday, February 09, 2017, 09:44: HS removed from test stand. Exchange target.
Thursday, February 09, 2017, 10:04: Target # 42218-11 placed into test stand. Door open for 20 minutes.
Thursday, February 09, 2017, 10:10: Roughing.
Thursday, February 09, 2017, 10:10: Doors sealed for roughing.
Thursday, February 09, 2017, 10:11: BV1B OPEN. Opened @ 428T.
Thursday, February 09, 2017, 10:29: Both Turbo pumps started.
Thursday, February 09, 2017, 10:34: Ion gauge on. TP1B @ speed 42 KRPM.
Thursday, February 09, 2017, 10:37: TP1A @ speed 38 KRPM.
Thursday, February 09, 2017, 10:40: RGA on. Vacuum @ 1.45E-05T.
Thursday, February 09, 2017, 10:47: Strip tool Vacuum.Current restarted.
Thursday, February 09, 2017, 15:34: Check. Vacuum @ 3.97E-07T.
***NOTE: Small water anomaly on RGA affecting Vacuum***
***NOTE: Small water anomaly on RGA affecting Vacuum*** Continues. Monitor through heating.
Friday, February 10, 2017, 08:06: Water lines opened. No response on RGA. Vacuum stable @ 3.24E-07T.
Friday, February 10, 2017, 08:08: Power/Sources on.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.4 |
4.02 |
TBHT |
24.2 |
3.22 |
COIL + EE |
24.2 |
5.26 |
TGHT |
24.4 |
5.90 |
08:30: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
10:00: Check. Vacuum @ 3.68-4.87E-07T. (Anomaly variant)
11:40: Check. Vacuum @ XE-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
34.6 |
4.12 |
TBHT |
25.5 |
3.21 |
COIL + EE |
25.5 |
5.29 |
TGHT |
27.3
|
5.88 |
Check. Vacuum @ 4.41E-07T.
Auto-cooling started @ 2A per min. Vacuum @ 4.25E-07T.
Tuesday, February 14, 2017, 08:22: Power/sources off.
Tuesday, February 14, 2017, 08:23: Water lines purged.
Tuesday, February 14, 2017, 08:26: RGA off. Ion Gauge off. Turbo pumps off. |
Wednesday, January 25, 2017, 14:56, Aaron Schmidt, , , , , 42218-14, 41751-6, Done, Target cleaning test LP-SIS CC Clean
|
Target Test (Fully Cleaned vs Crystal Clean only).
For all tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
- Ensure previous test turbos are off by 8:15 and started venting by 9:15am to meet timeline.
-Start Roughing by 10:10am +/- 1 minute.
-TGHT / TBHT ramping starts @ 8:30am. 2A per min to 580A / 200A
ALL START TIMES MUST BE CONSISTENT.
***Pre-outgassed*** Heat Shield W.O# 41751-6: Includes insulators, new Al grounded 9-pin, bracket, & gripper arms. Blank/Plate. No source cup/EE.
LP-SIS Target # 42218-14: Crystal Clean only.
Tuesday, February 07, 2017, 09:48: HS removed from test stand. Exchange target.
Tuesday, February 07, 2017, 10:07: Target # 42218-14 placed into test stand. Door open for 19 minutes.
Tuesday, February 07, 2017, 10:10: Roughing.
Tuesday, February 07, 2017, 10:10: Doors sealed for roughing.
Tuesday, February 07, 2017, 10:11: BV1B OPEN. Opened @ 430T.
Tuesday, February 07, 2017, 10:29: Both Turbo pumps started.
Tuesday, February 07, 2017, 10:34: Ion gauge on. TP1B @ speed 42 KRPM.
Tuesday, February 07, 2017, 10:37: TP1A @ speed 38 KRPM.
Tuesday, February 07, 2017, 10:39: RGA on. Vacuum @ 1.49E-05T.
Tuesday, February 07, 2017, 15:30: Check. Vacuum @ 3.26E-07T.
Wednesday, February 08, 2017, 08:12: Water lines opened. No response on RGA. Vacuum stable @ 1.29E-07T.
Wednesday, February 08, 2017, 08:14 : Power/Sources on.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
20.8 |
4.06 |
TBHT |
20.5 |
3.17 |
COIL + EE |
20.6 |
5.27 |
TGHT |
20.7 |
5.88 |
Wednesday, February 08, 2017, 08:30: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Wednesday, February 08, 2017, 10:00: Check. Vacuum @ 3.33E-07T.
Wednesday, February 08, 2017, 11:40: Check. Vacuum @ 1.70E-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
30.2 |
4.06 |
TBHT |
21.0 |
3.17 |
COIL + EE |
21.1 |
5.22 |
TGHT |
21.3
|
5.82 |
Wednesday, February 08, 2017, 13:30: Check. Vacuum @ 3.53E-07T.
Wednesday, February 08, 2017, 15:30: Auto-cooling started @ 2A per min. Vacuum @ 3.88E-07T.
***NOTE: Small water anomaly on RGA affecting Vacuum***
***NOTE: Small water anomaly on RGA affecting Vacuum continues***
Thursday, February 09, 2017, 08:08: Sources/power off.
Thursday, February 09, 2017, 08:10: Water lines purged.
Thursday, February 09, 2017, 08:11: RGA off.
Thursday, February 09, 2017, 09:00: Venting |
Wednesday, January 25, 2017, 14:55, Aaron Schmidt, , , , , 42218-6, 41751-6, Done, Target cleaning test (Long) HP-SIS Full Clean
|
Target Test (Fully Cleaned vs Crystal Clean only).
For all tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
- Ensure previous test turbos are off by 8:15 and started venting by 9:15am to meet timeline.
-Start Roughing by 10:10am +/- 1 minute.
-TGHT / TBHT ramping starts @ 8:30am. 2A per min to 580A / 200A
ALL START TIMES MUST BE CONSISTENT.
***Pre-outgassed*** Heat Shield W.O# 41751-6: Includes insulators, new Al grounded 9-pin, bracket, & gripper arms. Blank/Plate. No source cup/EE.
HP-SIS Target # 42218-6: Full Clean. Crystal Clear, Acetone, & Methanol used.
Wednesday, February 01, 2017, 09:47: HS removed from test stand. Exchange target.
Wednesday, February 01, 2017, 10:04: Target # 42218-6 placed into test stand. Door open for 17 minutes.
Wednesday, February 01, 2017, 10:10: Roughing.
Wednesday, February 01, 2017, 10:10: Doors sealed for roughing.
Wednesday, February 01, 2017, 10:11 BV1B OPEN. Opened @ 431T.
Wednesday, February 01, 2017, 10:29: Both Turbo pumps started.
Wednesday, February 01, 2017, 10:34: Ion gauge on. TP1B @ speed 42 KRPM.
Wednesday, February 01, 2017, 10:37: TP1A @ speed 38 KRPM.
Wednesday, February 01, 2017, 10:40: RGA on. Vacuum @ 6.79E-05T.
Wednesday, February 01, 2017, 15:30: Check. Vacuum @ 3.18E-7T.
Thursday, February 02, 2017, 08:15: Water lines opened. No response on RGA. Vacuum stable @ 1.29E-07T.
Thursday, February 02, 2017, 08:18: Power/Sources on.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
22.7 |
3.92 |
TBHT |
22.5 |
3.08 |
COIL + EE |
22.5 |
5.10 |
TGHT |
22.7 |
5.66 |
Thursday, February 02, 2017, 08:30: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Thursday, February 02, 2017, 10:00: Check. Vacuum @ 6.76E-07T.
Thursday, February 02, 2017, 11:41: Check. Vacuum @ 3.26E-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
29.1 |
3.99 |
TBHT |
23.9 |
3.16 |
COIL + EE |
23.8 |
5.19 |
TGHT |
25.5 |
5.80 |
Thursday, February 02, 2017, 13:30: Check. Vacuum @ 1.97E-07T.
Thursday, February 02, 2017, 15:30: Check. Vacuum @ 1.88E-07T.
Friday, February 03, 2017, 08:45: Check. Vacuum @ 1.62E-07T
Friday, February 03, 2017, 08:50: RGA restarted.
Friday, February 03, 2017, 10:50: Auto-cooling started @ 2A per min.
Monday, February 06, 2017, 08:18: Multiple attempts made to restart epics. Strip tools are not available. Vacuum data not available (White out screen). (see power outage eLog)
Monday, February 06, 2017, 08:20: RGA confirmed shut down.
Monday, February 06, 2017, 08:23: Sources/power off.
Monday, February 06, 2017, 08:25: Water lines purged.
Monday, February 06, 2017, 10:14: Turbo pumps restarted.
Monday, February 06, 2017, 10:19: Ion gauge on. TP1B @ speed 42 KRPM.
Monday, February 06, 2017, 10:22: TP1A @ speed 38 KRPM.
Tuesday, February 07, 2017, 08:13: Turbos off.
Tuesday, February 07, 2017, 09:10: Venting. |
Wednesday, January 25, 2017, 14:54, Aaron Schmidt, , , , , 42218-9, 41751-6, Done, Target cleaning test HP-SIS CC Clean
|
Target Test (Fully Cleaned vs Crystal Clean only).
For all tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
- Ensure previous test turbos are off by 8:15 and started venting by 9:15am to meet timeline.
-Start Roughing by 10:10am +/- 1 minute.
-TGHT / TBHT ramping starts @ 8:30am. 2A per min to 580A / 200A
ALL START TIMES MUST BE CONSISTENT.
***Pre-outgassed*** Heat Shield W.O# 41751-6: Includes insulators, new Al grounded 9-pin, bracket, & gripper arms. Blank/Plate. No source cup/EE.
HP-SIS Target # 42218-9: Crystal Clean only.
Monday, January 30, 2017, 09:44: HS removed from test stand. Exchange target.
Monday, January 30, 2017, 10:01: Target # 42218-9 placed into test stand. Door open for 17 minutes.
Monday, January 30, 2017, 10:10: Roughing.
Monday, January 30, 2017, 10:10: Doors sealed for roughing.
Monday, January 30, 2017, 10:11: BV1B OPEN. Opened @ 350T.
Monday, January 30, 2017, 10:29: Both Turbo pumps started.
Monday, January 30, 2017, 10:34: Ion gauge on. TP1B @ speed 42 KRPM.
Monday, January 30, 2017, 10:37: TP1A @ speed 38 KRPM.
Monday, January 30, 2017, 10:40: RGA on. Vacuum @1.24E-05T.
Monday, January 30, 2017, 15:30: Vacuum @ 4.49E-07T.
Tuesday, January 31, 2017, 08:14: Water lines opened. No response on RGA. Vacuum stable @ 1.44E-07T.
Tuesday, January 31, 2017, 08:19: Power/Sources on.
Tuesday, January 31, 2017, 08:20: DAQPro loose. re-connected.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
20.9 |
3.95 |
TBHT |
20.7 |
3.08 |
COIL + EE |
20.9 |
5.13 |
TGHT |
21.1 |
5.72 |
Tuesday, January 31, 2017, 08:30: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Tuesday, January 31, 2017, 10:00: Check. Vacuum @ 7.73E-07T.
Tuesday, January 31, 2017, 11:40: Check. Vacuum @ 3.42E-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.4 |
3.92 |
TBHT |
27.0 |
3.45 |
COIL + EE |
23.0 |
5.02 |
TGHT |
24.9 |
5.61 |
Tuesday, January 31, 2017, 13:30: Check. Vacuum @ 2.34E-07T
Tuesday, January 31, 2017, 15:30: Auto-cooling started @ 2A per min.
Wednesday, February 01, 2017, 08:10: Power/sources off.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
22.2 |
3.95 |
TBHT |
22.2 |
3.06 |
COIL + EE |
22.0 |
5.02 |
TGHT |
22.2 |
5.67 |
Wednesday, February 01, 2017, 08:14: Waterlines purged.
Wednesday, February 01, 2017, 08:15: RGA, Ion gauge, turbo pumps off.
Wednesday, February 01, 2017, 09:15: Venting. |
Wednesday, January 25, 2017, 09:48, Aaron Schmidt, , , , , 41882-4, 41751-6, Done, Out gas Heat Shield for Target cleaning test 7x
|
No EE. Insulators, gripper arms, and blank EE plate included
-New grounded 9 pins included in brackets
-TGHT included to out gas Heat shield
Wednesday, January 25, 2017, 09:45: Roughing
Wednesday, January 25, 2017, 10:04: Turbo pumps started.
Wednesday, January 25, 2017, 11:26: Ion gauge & RGA on.
Thursday, January 26, 2017, 08:25: RGA restarted. (Fatal communication error)
Thursday, January 26, 2017, 08:32: Water lines opened. No response on RGA. Vacuum stable @ 1.44e-07T.
Thursday, January 26, 2017, 08:35: Power/sources on.
Thursday, January 26, 2017, 08:37: Auto-ramping TGHT to 580A @ 2A per min. Vacuum @ 1.44e-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
23.5 |
4.02 |
TBHT |
23.3 |
3.13 |
COIL + EE |
23.3 |
5.18 |
TGHT |
23.4 |
5.78 |
Thursday, January 26, 2017, 13:11: RGA restarted. (Fatal communication error)
Thursday, January 26, 2017, 15:20: RGA restarted. (Fatal communication error)
Thursday, January 26, 2017, 15:26: RGA being shut down. (Fatal communication error)
Thursday, January 26, 2017, 15:31: RGA Restarted.
Friday, January 27, 2017, 08:06: RGA running ok.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
30.2 |
4.06 |
TBHT |
21.2 |
3.14 |
COIL + EE |
21.4 |
5.11 |
TGHT |
23.3 |
5.78 |
Friday, January 27, 2017, 15:23: Auto-cooling started @ 2A per min.
Monday, January 30, 2017, 08:02: RGA off. Ion Gauge off. Turbo pumps off.
Monday, January 30, 2017, 08:05: Power/sources off. Water lines purged.
Monday, January 30, 2017, 09:09: Venting. |
Tuesday, January 24, 2017, 14:14, Aaron Schmidt, , , , , , , , Calibrated leak tanks removed
|
Tuesday, January 24, 2017, 13:30: Calibrated leak tanks of Argon & Neon removed. Both old Neon tanks were re-installed in their place. |
Monday, January 23, 2017, 15:30, Aaron Schmidt, , , , , , , , Pump down empty chamber.
|
Monday, January 23, 2017, 15:30: Roughing
Wednesday, January 25, 2017, 09:05: Venting |
Friday, January 20, 2017, 08:45, Aaron Schmidt, , , , , , , Problems/Solutions, TSG:TP1A & TSG:BV1A tripped
|
Friday, January 20, 2017, 08:25: TSG : TP1A and TSG : BV1A were noticed to be tripped around 6am.
Friday, January 20, 2017, 08:42: Bypass to restart TSG : TP1A and TSG : BV1A. TP1A is at speed.
------
Continue to monitor. |
Tuesday, November 29, 2016, 11:20, Anders Mjos, , , , , , , Problems/Solutions, TSH:UHV1 remvoed
|
The variable leak rate valve will be used for TM3 HV spark tests in TCS |
Thursday, January 19, 2017, 13:23, Anders Mjos, , , , , , , Problems/Solutions, TSH:UHV1 remvoed
|
Anders Mjos wrote: |
The variable leak rate valve will be used for TM3 HV spark tests in TCS
|
Variable leak valve returned yesterday (2017-01-18). New calibrated leaks installed. Ar and Ne. System leak checked OK after. |
Wednesday, January 18, 2017, 09:23, Aaron Schmidt, Ta Test, LP-FEBIAD, , , 39530-3, , In progress, Tri-Coil FEBIAD for testing 12x
|
Wednesday, January 18, 2017, 09:22: Roughing
Wednesday, January 18, 2017, 09:41: Turbo pumps started.
Wednesday, January 18, 2017, 11:01: Ion gauge on.
Thursday, January 19, 2017, 08:15: Water lines opened. No response on RGA. Vacuum stable @ 1.70e-07T.
Thursday, January 19, 2017, 08:55: Power/Sources on. BIAS/EZL/EE @ 30/15/1.5 kV . Coil @ 50 A . Anode @ 200 V.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.9 |
3.99 |
TBHT |
24.8 |
3.15 |
COIL + EE |
24.7 |
5.16 |
TGHT |
24.7 |
5.05 |
Thursday, January 19, 2017, 08:59: IV4 opened. Auto ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Friday, January 20, 2017, 08:25: TSG : TP1A and TSG : BV1A were noticed to be tripped around 6am.
Friday, January 20, 2017, 08:42: Bypass to restart TSG : TP1A and TSG : BV1A. TP1A is at speed.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
34.1 |
3.99 |
TBHT |
25.0 |
3.19 |
COIL + EE |
24.7 |
5.19 |
TGHT |
26.5 |
5.05 |
Friday, January 20, 2017, 11:48: Auto ramping TBHT to 320 A @ 2A per min.
Friday, January 20, 2017, 15:51: Coil @ 100A
Saturday, January 21, 2017, 11:00: Increased TB HT voltage limit to 2.75 V. TBHT current went back up from 313 to 319 A. -AM
Monday, January 23, 2017, 10:08: Argon Valve closed.
Monday, January 23, 2017, 10:33: Neon Valve closed.
Monday, January 23, 2017, 11:00: Auto-cooling @ 4A per min. Coil reduced from 100 A to 50 A
Monday, January 23, 2017, 13:32: Power/sources off.
Monday, January 23, 2017, 13:35: RGA off. IV4 closed. Ion gauge off. Turbo pumps off.
Monday, January 23, 2017, 14:45: Venting |
|