2
|
Wednesday, September 14, 2011, 15:33 |
John Wong | Test#1 | HP-SIS | ITW | TM1 | test | test | In progress | testing elog for test stand | Wednesday, September 14, 2011, 15:33
blah blah blah... |
|
|
748
|
Sunday, July 28, 2019, 14:22 |
Luca Egoriti | P2N - 1 | HP-FEBIAD | ITE | TM2 | p2n - test1 | p2n - test1 | Problems/Solutions | p2n heating test 3 | Friday. July 26th 2019
A new electrical configuration of
the test stand was decided and installed. |
|
|
156
|
Friday, August 10, 2012, 11:29 |
Pierre Bricault | NA | | | | N A | NA | In progress | Test FEBIAD | The helium bottle was found empty.
Rick will refill it and hook the
leak detector on the system to find out |
|
|
157
|
Friday, August 10, 2012, 12:44 |
Pierre Bricault | NA | LP-FEBIAD | | | NA | NA | In progress | FEBIAD test | Rick put the helium bottle back in the
rack.
Waiting for status of the gas lines. |
|
|
160
|
Friday, August 10, 2012, 15:29 |
Pierre Bricault | NA | LP-FEBIAD | | | NA | NA | | finishing the gas installation and its pump | 1524H Start small pump.
1529H stop the pump.
|
|
|
162
|
Saturday, August 11, 2012, 13:34 |
Pierre Bricault | NA | LP-FEBIAD | | | NA | NA | In progress | Test FEBIAD anode bias 120 V | |
|
|
756
|
Thursday, August 29, 2019, 14:47 |
Fernando Maldonado | | | | | | Ferran's heat shield | Problems/Solutions | Rewiring-Baking out | Thursday, August 29, 2019, 14:47 : Changing
back to the nominal wiring
Thursday, August 29, 2019, 17:01: |
|
|
923
|
Thursday, May 05, 2022, 14:43 |
Aaron Schmidt | | P2N-SIS | | | 45241-1 | 45240-1 | In progress | P2N assembly conditioning. | Thursday, May 05, 2022, 14:43: Roughing.
Open BV1B
Thursday, May 05, 2022, 14:46: Upper |
|
|
925
|
Tuesday, May 10, 2022, 10:09 |
Aaron Schmidt | | P2N-SIS | ITE | TM4 | 45241-1 | 45240-1 | In progress | P2N assembly conditioning - 2 | Ref: https://elog.triumf.ca/TIS/Test-Stand/924.
During testing, it was noted one leg was
glowing vs the other. P2N assembly was removed |
|
|
926
|
Wednesday, May 11, 2022, 10:05 |
Aaron Schmidt | | P2N-SIS | ITE | TM4 | 44812-2 | 45240-1 | | P2N assembly conditioning - 3 | Target oven #45241-1 swapped out. SS bolts
were in use on the legs.
Molybdenum screws in the legs on |
|
|
927
|
Thursday, May 12, 2022, 10:50 |
Aaron Schmidt | | P2N-SIS | ITE | TM4 | 44812-2 | 45240-1 | In progress | P2N assembly conditioning - 4 | PE shimmed & extended 1mm due to likely
ion source contact.
Thursday, May 12, 2022, 10:41: Roughing. |
|
|
980
|
Monday, September 25, 2023, 16:31 |
Aaron Schmidt | Ta#66 | LP-SIS | ITW | TM2 | 45220-5 | 45235-9 | Done | Conditioning Ta#66 & HV Tests. | Thermocouples installed on the left end
plate x 2.
Monday, September 25, 2023, 16:23: |
|
|
966
|
Tuesday, May 09, 2023, 10:40 |
Aaron Schmidt | SiC#45 | HP-SIS | ITE | TM4 | 44692-3 | 45235-8 | In progress | Conditioning SiC#45 | Tuesday, May 09, 2023, 10:28: Roughing.
Tuesday, May 09, 2023, 11:25: TP1B
on. |
|
|
958
|
Tuesday, January 31, 2023, 10:42 |
Aaron Schmidt | | LP-SIS | | | 44062-1-SK | 45235-7 | In progress | Conditioning UC#x assembly | SK Series of LP-SIS targets are for conditioning
only.
Tuesday, January 31, 2023, 10:39: |
|
|
969
|
Wednesday, May 31, 2023, 15:19 |
Aaron Schmidt | SiC#46 | HP-SIS | | | 44692-2 | 45235-6 | In progress | Conditioning SiC#2023A (Spare, renamed SiC-23B) - No salts | (Spare HP-SIS SiC SiC-23B)
Wednesday, May 31, 2023, 15:18: Roughing.
Thursday, June 01, 2023, |
|
|
944
|
Tuesday, November 15, 2022, 11:24 |
Aaron Schmidt | UC#41 assembly | LP-SIS | ITE | TM4 | 45220-8 | 45235-4 | In progress | Conditioning UC#41 assembly | LP-SIS 45220-8 is empty & for
testing only.
Tuesday, November 15, 2022, 11:00: |
|
|
975
|
Wednesday, August 09, 2023, 14:29 |
Aaron Schmidt | | LP-SIS | | | 45220-6 | 45235-3 | In progress | Graphite target test 1 (C2023A) | Graphite
experiment 2: ID Gr-230601, WO#45220-6 (
|
|
|
976
|
Monday, August 14, 2023, 12:11 |
Aaron Schmidt | | LP-SIS | | | 45220-11 | 45235-3 | | Graphite target test 2 (C2023B) | Graphite experiment insert 1: ID GR-230515,
WO#45220-11. https://elog.triumf.ca/TIS/Evaporator_2/622
New disc form. End caps expanded, |
|
|
1000
|
Thursday, April 04, 2024, 10:38 |
Dave Neilson | | LP-SIS | | | 44691-8 | 45235-26 | Done | Mass marker testing | Thursday, April 04, 2024, 09:49:
Target inserted yesterday, April 3. mass
marker tube connections carefully confirmed. |
|
|
1006
|
Wednesday, April 24, 2024, 16:21 |
Dave Neilson | | LP-SIS | | | 44691-8 | 45235-26 | | | Wednesday, April 24, 2024, 16:20:
Target assembly installed.
Wednesday, April 24, 2024, 16:20: |
|