Tuesday, August 18, 2020, 12:07, Aaron Schmidt, Test FEBIAD, HP-FEBIAD, , , 38295-8, 42752-5, In progress, RP check & Mass magnet check.
|
Tuesday, August 18, 2020, 12:05: RP1 on
Tuesday, August 18, 2020, 12:10: RP1 off
Install Gas Ballast vapour port w/ filter. |
Thursday, September 03, 2020, 11:28, Aaron Schmidt, -, HP-FEBIAD, , , 38295-8, 42752-5, In progress, Leak check 2.0
|
Out Gas & MB1 check (Or leak check 2.0)
Ref: https://elog.triumf.ca/TIS/Test-Stand/809 - Leak Checks
Ref: https://elog.triumf.ca/TIS/Test-Stand/803 - Fault |
Tuesday, October 13, 2020, 12:34, Aaron Schmidt, , HP-FEBIAD, , , 38295-8, 42752-5, In progress, MB1 Check.
|
He & Ar calibrated leak bottles in.
Tuesday, October 13, 2020, 12:33: Roughing.
Tuesday, October 13, 2020, 13:17: TP1B on. |
Monday, February 22, 2021, 18:25, Fernando Maldonado, , HP-FEBIAD, , , , , Done, FEBIAD parameter scans
|
Monday, February 22, 2021, 17:48 Roughing
Monday, February 22, 2021, 18:17: Turbos on.
Monday, February 22, 2021, 18:25: IG1 on. |
Wednesday, March 10, 2021, 14:57, Aaron Schmidt, , HP-FEBIAD, , , , 42752-5, In progress, Emittance meter test with FEBIAD
|
Wednesday, March 10, 2021, 14:54: Roughing.
Wednesday, March 10, 2021, 14:57: BV1A open.
Thursday, March 11, 2021, 09:41: TP1B on. |
Wednesday, May 25, 2022, 15:48, Aaron Schmidt, SiC#42, HP-FEBIAD, ITW, TM2, 44692-9, 44378-5, In progress, Conditioning SiC#42
|
Wednesday, May 25, 2022, 15:46: Roughing.
Wednesday, May 25, 2022, 16:21: TP1B on.
Wednesday, May 25, 2022, 16:38: TP1A on. |
Saturday, June 18, 2022, 10:04, Aaron Schmidt, SiC#43, HP-FEBIAD, ITW, TM2, 42464-1, 44378-16, In progress, Conditioning SiC#43
|
Note: SiC#42 replacement.
Saturday, June 18, 2022, 09:54: Roughing.
Saturday, June 18, 2022, 10:08: Data logger removed. Pins 4 & 5 grounded. Power on. |
Thursday, June 23, 2022, 11:00, Aaron Schmidt, SiC#44, HP-FEBIAD, ITE, TM4, 37978-1, 44378-24, In progress, Conditioning SiC#44
|
Thursday, June 23, 2022, 10:58: Roughing.
Thursday, June 23, 2022, 11:03: BV1A open.
Thursday, June 23, 2022, 11:34: TP1B on |
Monday, December 19, 2022, 12:49, Carla Babcock, , HP-FEBIAD, , , , , , HP-FEBIAD tests
|
Monday, December 19, 2022, 12:06 : Tomislav changed the polarity of the anode power supply last week and everything has been closed up again. The anode
wire was switched to feedthru J and the short there removed. Forgot to put the short on the tube before closing the top but it should be ok for these tests
since it has the resistor still installed to keep it at some potential. Pumping out gas lines. |
Monday, April 17, 2023, 14:08, Aaron Schmidt, TiC#6, HP-FEBIAD, ITW, TM2, 44692-10, 45235-12, In progress, Conditioning TiC#6
|
Monday, April 17, 2023, 14:03: Roughing.
Monday, April 17, 2023, 14:08: BV1A open.
Monday, April 17, 2023, 14:32: TP1B on. |
Friday, May 05, 2023, 06:49, Aaron Schmidt, TiC#6, HP-FEBIAD, ITW, TM2, 44692-10, 45235-12, In progress, Conditioning TiC#6
|
Ceramic elbow installed on the anode.
Friday, May 05, 2023, 06:47: Roughing.
Friday, May 05, 2023, 07:24: TP1B on. |
Friday, February 16, 2024, 10:30, Aaron Schmidt, SiC# (Stock), HP-FEBIAD, , , 45447-4, 45235-21, In progress, Conditioning stock SiC HP FEBIAD
|
Friday, February 16, 2024, 10:30: Roughing
Friday, February 16, 2024, 17:38: TP1B on.
Friday, February 16, 2024, 17:47: TP1A on. |
Friday, April 26, 2024, 13:49, Aaron Schmidt, TiC#7, HP-FEBIAD, ITW, TM4, 45447-5, 45235-15, In progress, Conditioning TiC#7
|
FM-SW calibrated leak installed.
Friday, April 26, 2024, 13:48: Roughing.
Friday, April 26, 2024, 14:20: TP1B started. |
Wednesday, July 31, 2024, 18:50, Aaron Schmidt, TiC Spare, HP-FEBIAD, ITW, TM4, 45447-2, 42752-7, In progress, Conditioning Spare for TiC#7
|
Wednesday, July 31, 2024, 18:47: Roughing.
Wednesday, July 31, 2024, 19:24: TP1B on.
Wednesday, July 31, 2024, 19:30: TP1B at speed. Backing pressure CG1A @ 0.212T. |
Wednesday, June 29, 2011, 15:30, John Wong, , , , , , , , Testing Yield station elog
|
ABC 123 blah blah blah... |
Thursday, September 15, 2011, 09:20, Anders Mjos, , , , , , , , ISAC TestStand old e-log
|
link to old e-log |
Friday, September 23, 2011, 15:38, Rick Maharaj, , , , , , , , test stand vented
|
Test stand vented |
Friday, September 23, 2011, 16:40, Anders Mjos, , , , , , , Problems/Solutions, 9-pin connectors swapped on source tray
|
Friday, September 23, 2011, 16:3: The connection on the 9-pin connector for FEBIAD targets showed burn marks from the previous FEBIAD tests. Corresponding
mark was found on the connector on the target side. Because of this the upper and lower 9-pin connectors were swapped to have a clean connector for the
next FEBIAD target. |
Monday, September 26, 2011, 14:56, John Wong, , , , , , , Problems/Solutions, 9-pin connectors swapped on source tray
|
Anders Mjos wrote:
Friday, September 23, 2011, 16:3: The connection on the 9-pin connector for FEBIAD targets showed burn |
Monday, September 26, 2011, 16:14, Anders Mjos, , , , , , , Problems/Solutions, Fixed leak on water line for HS, added Kapton insulation
|
While testing SiC#26 a leak was discovered on the water line to the heat shield. The leak was in the right joint (see attachment). The heat
shield water lines were removed from the test stand and repaired in the Machine Shop.
Kapton was added to the FEBIAD coil line to prevent
it from shorting to the target heater line (see attachment).
|
|