638
|
Tuesday, February 20, 2018, 09:04 |
Carla Babcock | | | | | | | | Trying HV with rubber corona shield | Tuesday, February 20, 2018, 09:01: Sparks
at 62.5kV after a couple minutes. Sounds
like they were in the EE spark gap but don't |
|
1019
|
Tuesday, August 13, 2024, 09:31 |
Dave Neilson | | | | | | | Problems/Solutions | Troubleshooting HV sparks and FC0 signal | Monday, August 12, 2024, 17:00 EOD.
target installed, roughed, turbos on. No
effect on vacuum from turning on water cooling |
|
559
|
Wednesday, January 18, 2017, 09:23 |
Aaron Schmidt | Ta Test | LP-FEBIAD | | | 39530-3 | | In progress | Tri-Coil FEBIAD for testing | Wednesday, January 18, 2017, 09:22: Roughing
Wednesday, January 18, 2017, 09:41:
Turbo pumps started. |
12x |
586
|
Monday, May 22, 2017, 09:43 |
Aaron Schmidt | | HP-FEBIAD-CTL | | | | | | Tri-Coil CTL-FEBIAD test IV | Monday, May 22, 2017, 09:41: Roughing.
Monday, May 22, 2017, 10:00: Turbo
pumps started. |
|
584
|
Tuesday, May 16, 2017, 14:25 |
Aaron Schmidt | | HP-FEBIAD-CTL | | | | | | Tri-Coil CTL-FEBIAD test III | Coil loose (Remove lid, Tighten and place
lid again)
Tuesday, May 16, 2017, 14:24: Roughing. |
8x |
576
|
Thursday, April 06, 2017, 12:06 |
Aaron Schmidt | | HP-FEBIAD-CTL | | | | | In progress | Tri-Coil CTL-FEBIAD test | Thursday, April 06, 2017, 12:06: Roughing.
Thursday, April 06, 2017, 13:07:
Turbo pumps on. |
|
219
|
Wednesday, October 03, 2012, 13:50 |
Aurelia Laxdal | | HP-FEBIAD | | | | | In progress | Training updates | On Monday October 1, the HP-FEBIAD source
was turned ON again, to complete the operator
training. The last session was yesterday |
|
720
|
Friday, May 03, 2019, 08:30 |
Anders Mjos | | | | | | | In progress | Training | Training: Venting and pump down
Friday, May 03, 2019, 08:30: Turbo
pumps stopped. |
|
225
|
Thursday, November 01, 2012, 11:16 |
Aurelia Laxdal | TiC#3 | LP-SIS | ITW | TM1 | | | | TiC#3-LP-SIS Startup | Did the HV conditioning for the TiC#3 up
to 30kV.
Heaters ramp up in progress. |
|
896
|
Wednesday, August 25, 2021, 15:30 |
Ferran Boix Pamies | | | | | | | | Thermocouple high voltage test | Wednesday, August 25, 2021, 15:29: Roughing.
Thursday, August 26, 2021,
04:11: IG1 switched on. Vacuum @ 8.35e-06T |
|
733
|
Wednesday, June 19, 2019, 17:25 |
Fernando Maldonado | | | | | | | Done | Thermocouple connection | Wednesday, June 19, 2019, 17:13 Ferran
and Fernando tested the 9-pin connector to
have a reading on a thermocouple following |
|
989
|
Thursday, January 18, 2024, 10:44 |
Aaron Schmidt | | | | | | | Done | Thermal tests 2 | December 18 - January 15. Were not logged.
Placed holder. Aurelia's tests. Included
thermocouples in the oven & ionizer. |
|
985
|
Thursday, November 16, 2023, 09:43 |
Aaron Schmidt | | LP-SIS | | | | | In progress | Thermal tests | Aurelia has been testing on the ISAC TS
since last week. Thermocouples are installed
in the end cap, left side & the ionizer. |
|
353
|
Thursday, January 02, 2014, 11:53 |
Anders Mjos | | | | | | | Problems/Solutions | The computer will not boot Windows | The computer has been brought over to PC
support for diagnostics.
Hard Drive was found to be corrupted. |
|
404
|
Thursday, September 25, 2014, 15:44 |
Anders Mjos | ThO#1 | | ITW | TM1 | 40282-5 | | Done | ThO#1 Heat Shield Conditioning | Thursday, September 25, 2014, 15:44: Roughing
Thursday, September 25, 2014, 16:06:
Starting turbos |
|
973
|
Thursday, July 13, 2023, 07:37 |
Aaron Schmidt | | | | | | | | Tests - Aurelia L | Thursday, July 13, 2023, 07:37: Chamber
is vented. Beamline is vented. Interlock
bypassed on TPS:IV4 - AS |
|
503
|
Wednesday, April 13, 2016, 13:03 |
Aaron Schmidt | | LP-SIS | | | 41790-2 | 39956-8 | | Testing restraint insulator prototype (2) | Wednesday, April 13, 2016, 13:03: Begin
roughing. (Plasma electrode in. Salts in)
Wednesday, April 13, 2016, 13:34: |
|
502
|
Monday, April 04, 2016, 11:33 |
Aaron Schmidt | | LP-SIS | | | 41790-2 | 39956-8 | In progress | Testing restraint insulator prototype | Monday, April 04, 2016, 11:31: Begin roughing.
(No plasma electrode)
Monday, April 04, 2016, 12:47: Started |
|
459
|
Monday, August 10, 2015, 18:01 |
Anders Mjos | | LP-SIS | | | | | In progress | Testing new center block target | Installed thermocouples:
T1: TGHT tube left side, inside
T2: TBHT restraint |
|
438
|
Friday, April 24, 2015, 12:26 |
Anders Mjos | | LP-FEBIAD | | TM2 | | 39230-1 | In progress | Testing new TM2 Source Tray | Photos on DocuShare
Friday, April 24, 2015 |
|
|