  945   Tuesday, November 15, 2022, 15:32 Sam Gupta       ATTS tantalum Bracket Heating testHeated up sample 01 for the second time
and measured the temperature with increasing
current. Used pyrometre to measure temperature
  
  944   Tuesday, November 15, 2022, 11:24 Aaron SchmidtUC#41 assemblyLP-SISITETM445220-845235-4In progressConditioning UC#41 assembly LP-SIS 45220-8 is empty & for
testing only.
Tuesday, November 15, 2022, 11:00:
 UC#41_assembly_conditioning.docx 
  943   Wednesday, October 19, 2022, 12:16 Aaron Schmidt       Test Stand controls changedgenepicsas.triumf.ca
x11 enabled.
Then use login credentials.
  
  942   Tuesday, October 18, 2022, 13:25 Aaron SchmidtC#5LP-SIS  45235-544691-13In progressConditioning C#5Tuesday, October 18, 2022, 13:25: Roughing.
Tuesday, October 18, 2022, 13:28:
BV1A open
 C#5_-_Conditioning_start_-_HV.docx 
  941   Thursday, September 29, 2022, 13:50 Aaron Schmidt      In progressPump down empty chamberWater loop installed.
Thursday, September 29, 2022, 13:50:
Roughing
  
  940   Tuesday, September 27, 2022, 07:55 Aaron SchmidtC#4LP-SISITETM444691-344378-23In progressConditioning C#4 w/ thermocouplesThermocouples attached on 5 X 5 multi-pin:
O - O
O - X
 C#4_Conditioning_-_HV_test.docxER-580-230-30kV-m7.txtER-580-230-30kV-m39.txtER-580-230-30kV-m134.txt 
  939   Tuesday, August 30, 2022, 13:58 Aaron Schmidt    44062-744378-25In progressConditioning UC#40 assemblyConditioning the UC#40 LP-SIS assembly
& ISAC TS main vacuum chamber. Straight
/ round oven in use (TGHT only).
  
  938   Monday, July 11, 2022, 09:17 Aaron Schmidt      In progressPump down empty chamberMonday, July 11, 2022, 09:15: Roughing.   
  937   Sunday, July 10, 2022, 22:19 Aaron Schmidt      Problems/SolutionsTP2 Trip / TMS:RP2 issue Sunday, July 10, 2022, 22:19: A trip
was noted on TP2. the backing pressure is
quite high. Shutting off the turbo pumps
  
  936   Thursday, July 07, 2022, 16:52 Aaron Schmidt LP-IG-LISITWTM2 42132-3In progressConditioning UC#39 assemblyNo UCx target installed. Straight / blank
oven in use for out gassing.
Thursday, July 07, 2022, 16:50: Roughing.
  
  935   Thursday, June 30, 2022, 13:50 Aaron Schmidt       Pump down empty chamberThursday, June 30, 2022, 13:46: Roughing.

Thursday, July 07, 2022,
15:00: Venting.
  
  934   Thursday, June 23, 2022, 11:00 Aaron SchmidtSiC#44HP-FEBIADITETM437978-144378-24In progressConditioning SiC#44Thursday, June 23, 2022, 10:58: Roughing.
Thursday, June 23, 2022, 11:03: BV1A
open.
 SiC#44_-_R.docxER-580-290-30kV-m28.txtSiC#44.docx 
  933   Monday, June 20, 2022, 11:49 Aaron Schmidt       Pump down empty chamberMonday, June 20, 2022, 11:49: Water line
loop installed. Roughing.

Thursday, June 23, 2022,
  
  932   Saturday, June 18, 2022, 10:04 Aaron SchmidtSiC#43HP-FEBIADITWTM242464-144378-16In progressConditioning SiC#43Note: SiC#42 replacement.
Saturday, June 18, 2022, 09:54: Roughing.
Saturday, June 18, 2022, 10:08: Data
 SiC#43_Conditioning_-_R.docxER-580-290-30kV-m27.txtSiC#43.docx 
  931   Wednesday, June 08, 2022, 10:01 Aaron SchmidtTa#64LP-SISITETM444691-1244378-13In progressConditioning Ta#64 & HV Test.Thermocouples connected. Test HV
Wednesday, June 08, 2022, 09:33:
Roughing.
 7x 
  930   Tuesday, May 31, 2022, 13:35 Aaron SchmidtUCx HS ITWTM2 44378-19In progressConditioning UC#38 assemblyUsing a broken LP-FEBIAD source. TGHT only.
Tuesday, May 31, 2022, 13:24: Roughing.
Tuesday, May 31, 2022, 13:54: TP1B
  
  929   Friday, May 27, 2022, 07:19 Fernando Maldonado      DoneFEBIAD parameter scan web-app and brief description (with links)A web-app for systematic FEBIAD parametrizations
has been develop and  now includes the
ISAC Test Stand (ITS) :
  
  928   Wednesday, May 25, 2022, 15:48 Aaron SchmidtSiC#42HP-FEBIADITWTM244692-944378-5In progressConditioning SiC#42Wednesday, May 25, 2022, 15:46: Roughing.
Wednesday, May 25, 2022, 16:21: TP1B
on.
 ER-580-290-30kV-m28.txtSiC#42.docxSiC#42_Conditioning_-_R.docx 
  927   Thursday, May 12, 2022, 10:50 Aaron Schmidt P2N-SISITETM444812-245240-1In progressP2N assembly conditioning - 4PE shimmed & extended 1mm due to likely
ion source contact.
Thursday, May 12, 2022, 10:41: Roughing.
  
  926   Wednesday, May 11, 2022, 10:05 Aaron Schmidt P2N-SISITETM444812-245240-1 P2N assembly conditioning - 3Target oven #45241-1 swapped out. SS bolts
were in use on the legs.
Molybdenum screws in the legs on
  