804
|
Tuesday, August 04, 2020, 15:07 |
Aaron Schmidt | UCx | LP-SIS | | | 44139-10 | 43515-4 | In progress | UCx HS conditioning with PEEK assembly | Tuesday, August 04, 2020, 15:04:
Roughing.
Wednesday, August 05, 2020, |
|
|
803
|
Tuesday, July 28, 2020, 13:27 |
Aaron Schmidt | | | | | | | Problems/Solutions | Water leak on magnet PS | Fault: 13334
|
|
|
802
|
Wednesday, July 22, 2020, 08:56 |
Luca Egoriti | P2N test | HP-SIS | ITE | TM4 | | | In progress | p2n heating test - electrical feedthrough configuration | The electrical feedthroughs at the
top of the test stand module were reconfigured
to deliver up to 1200A to the p2n target. |
|
|
801
|
Monday, July 20, 2020, 11:40 |
Aaron Schmidt | (Empty-Test) | | | | 44160-1 | 43822-2 | In progress | Conditioning Test P2N | Salts added:
Cs - 15 uL
Li - 10 uL |
|
|
800
|
Monday, July 13, 2020, 14:52 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 43515-2 | | UCx HS conditioning. | Broken LP-FEBIAD used to out gas.
Monday, July 13, 2020, 14:52: Roughing.
Monday, July 13, 2020, 15:29: Turbo |
|
|
799
|
Monday, July 06, 2020, 05:28 |
Fernando Maldonado | Test FEBIAD | HP-FEBIAD | | | 38295-8 | 42752-5 | Done | FEBIAD development part 3/3 | Reminder. Mini pump still linked
to SV1. DO NOT OPEN SV2!!! |
|
|
798
|
Tuesday, June 30, 2020, 21:59 |
Fernando Maldonado | Test FEBIAD | HP-FEBIAD | | | 38295-8 | 42752-5 | Done | FEBIAD development part 2/3 | Reminder. Mini pump
still linked to SV1. DO NOT OPEN SV2!!! |
|
|
797
|
Thursday, June 25, 2020, 08:57 |
Fernando Maldonado | Test FEBIAD | HP-FEBIAD | | | 38295-8 | 42752-5 | Done | FEBIAD development part 1/3 | Reminder. Mini
pump still linked to SV1. DO NOT OPEN SV2!!! |
|
|
796
|
Monday, June 22, 2020, 07:07 |
Aaron Schmidt | Test FEBIAD | HP-FEBIAD | | | 38295-8 | 42752-5 | In progress | Test FEBIAD (Fernando) | Reminder. Mini pump still linked to SV1.
DO NOT OPEN SV2!!!
Monday, June 22, 2020, 08:45: Roughing. |
|
|
795
|
Tuesday, June 16, 2020, 11:03 |
Aaron Schmidt | Ta#60 | LP-SIS | ITW | TM2 | 44139-13 | 43515-5 | In progress | Conditioning Ta#60 | Tuesday, June 16, 2020, 11:01: Turbo pumps
on.
Wednesday, June 17, 2020, |
|
|
794
|
Wednesday, June 10, 2020, 08:23 |
Aaron Schmidt | C#1 | LP-SIS | ITW | TM2 | 43044-8 | 43515-3 | In progress | Conditioning C#1 | Salts:
Li - 10 uL
Na - 10 uL |
7x |
|
793
|
Tuesday, May 19, 2020, 06:01 |
Aaron Schmidt | | | | | | 42972-8 | Problems/Solutions | Leak check / Troubleshoot | https://elog.triumf.ca/TIS/Test-Stand/791
|
|
|
792
|
Tuesday, April 07, 2020, 10:53 |
Anders Mjos | | | | | | | | Vacuum loss / spike / Shutdown |
|
|
|
791
|
Friday, March 27, 2020, 11:30 |
Aaron Schmidt | | | | | | | | Vacuum loss / spike / Shutdown | The ISAC was left with the turbo pumps
and water supplies running. Just the power
supplies off. Monday, March, 23, 2020. |
|
|
790
|
Tuesday, March 17, 2020, 11:40 |
Aaron Schmidt | SiC#40 | HP-SIS | ITW | TM2 | 42218-8 | 43515-8 | In progress | Conditioning SiC#40 | Tuesday, March 17, 2020, 11:37: Roughing.
FS# 3 re-connected. All waterlines
re-opened except FS#5 (HS cooling). |
|
|
789
|
Wednesday, March 11, 2020, 13:31 |
Aaron Schmidt | Ta#60 | LP-SIS | | | 44139-13 | 43515-5 | In progress | Ta#60 w/ EE testing - 2 | Thermocouples installed on EE. Double checked
continuity & used a heat gun.
Wednesday, March 11, 2020, 13:30: |
|
|
788
|
Wednesday, March 04, 2020, 17:15 |
Fernando Maldonado | | | | | | | Problems/Solutions | Emittance rig communication | Wednesday, March 04, 2020, 17:13: EPICS
page indicated a sucesful scan but data was
empty. |
|
|
787
|
Monday, March 02, 2020, 14:42 |
Aaron Schmidt | Ta#60 | LP-SIS | | | 44139-13 | 43515-5 | In progress | Full TS testing w/ HV using Ta#60 | Monday, March 02, 2020, 14:36: Roughing.
Monday, March 02, 2020, 15:08: Turbo
pumps on. |
|
|
786
|
Thursday, February 27, 2020, 07:20 |
Aaron Schmidt | | | | | | | | FS#3 - Fitting change out | Thursday, February 27, 2020, 07:10: Swapped
out an old brass fitting on the supply line
going into FS#3 - Line K. |
|
|
785
|
Thursday, February 20, 2020, 11:41 |
Aaron Schmidt | Ta#60 | LP-SIS | | | 44139-13 | 43515-5 | In progress | Ta#60 w/ EE testing | Ta#60 (Unconditioned) - Salts in.
Thursday, February 20, 2020, 14:04:
Roughing. |
|