Entry  Tuesday, May 15, 2012, 08:08, Rick Maharaj, sic#27, , , , , , , Turbos off 
Target needs to be removed form teststand to remove heatshielding around target oven. The chamber will be vented, water circuits flushed and target removed.
Entry  Monday, July 08, 2019, 09:20, Luca Egoriti, p2n1, , ITE, , , , In progress, p2n heating test Capture.PNGCapture1.PNG
(see entry 742)
 
p2n target heated over the weekend after the connections between the bottom target legs and the copper connector has been modified from rivets
Entry  Saturday, June 22, 2019, 17:05, Luca Egoriti, p2n, , , , , , Done, Test stand installation 
I opened the test stand because I forgot to install tantalum heat shields around the target. Everything was reinstalled as before (with heat shields).
I could turn on the TSGTP1B but TSGTP1A does not turn on for some reason. I tried multiple times opening/closing its valve (BV1A) but the pump never starts.
Will keep pumping over the weekend with TP1B only.
Entry  Wednesday, June 26, 2019, 14:41, Carla Babcock, none, , , , , , Problems/Solutions, Issues with test stand wiring in service cap area isk4523d_ITSrewiring_June2019.png
The wiring on the top of the test stand was burned, see entry 737.
Probable cause of this is as follows:
Coil lines are connected by a wire to HV common, the 9-pin feedthrough etc to maintain same voltage on all the insulator tops. This is also directly
Entry  Friday, August 31, 2018, 12:27, Aaron Schmidt, nSiC#1, LP-SIS, ITW, TM2, 43044-1, 42752-4, In progress, Conditioning nSiC#1 15x
Friday, August 31, 2018, 12:27: Roughing.
Friday, August 31, 2018, 13:19: Turbo pumps started.

Wednesday, September 05, 2018, 11:03: RGA on.
Entry  Friday, January 18, 2013, 15:34, Anders Mjos, empty, , , , , , , Pumping down empty chamber 
Started roughing
Friday, January 18, 2013, 15:25: Started turbos
Friday, January 18, 2013, 15:33: Turbos at speed
Entry  Tuesday, May 14, 2019, 10:22, Aaron Schmidt, ZrC#8, LP-SIS, ITE, TM2, 43044-5, 42972-3, In progress, Conditioning ZrC#8 HS ZrC#8.docxTS-2019-05-14-11-05.rgaTS-2019-05-16-07-30.rgaTS-2019-05-21-07-10.rgaITE-TM2-ZrC#8-LP-SIS_Test_Stand.docx
Tuesday, May 14, 2019, 10:21: Roughing
Tuesday, May 14, 2019, 10:51: Turbo pumps on.
Tuesday, May 14, 2019, 11:05: Ion gauge, RGA on.
Entry  Monday, June 15, 2015, 14:09, Anders Mjos, ZrC#7, LP-SIS, , TM2, 41177-1, , In progress, ZrC#7 Conditioning ZrC#7.docxER580-220-30kV-m39-off30.txt
Monday, June 15, 2015, 14:05 Roughing
Monday, June 15, 2015, 14:39: Turbos started.
Monday, June 15, 2015, 14:49: Turbos at speed. Vacuum at 5.3E-5 T
Entry  Tuesday, June 30, 2015, 14:51, Anders Mjos, ZrC#7, LP-SIS, , TM2, 41177-2, , In progress, ZrC#7 Conditioning 2 ZrC#7_Second_Time.docxTGT2-ER580-200-30kV-m39-off60-3.txt
Tuesday, June 30, 2015, 14:51: Roughing
Tuesday, June 30, 2015, 16:14: Started turbos. CG1 at 0.075 T
Tuesday, June 30, 2015, 16:23 : Turbos at speed. Vacuum at 1.4E-5 T
Entry  Friday, August 08, 2014, 12:45, Anders Mjos, ZrC#6, LP-SIS, ITW, TM1, 40282-3, 39230-5, Done, Condictioning ZrC#6 
Friday, August 08, 2014, 12:44: Stopped turbos
Friday, August 08, 2014, 14:42: Venting 
Target assembly inserted
Entry  Tuesday, May 31, 2022, 13:35, Aaron Schmidt, UCx HS, , ITW, TM2, , 44378-19, In progress, Conditioning UC#38 assembly 
Using a broken LP-FEBIAD source. TGHT only.
Tuesday, May 31, 2022, 13:24: Roughing.
Tuesday, May 31, 2022, 13:54: TP1B on.
Entry  Tuesday, August 04, 2020, 15:07, Aaron Schmidt, UCx, LP-SIS, , , 44139-10, 43515-4, In progress, UCx HS conditioning with PEEK assembly UCx_-_HS_w-PEEK_Assy_-_43515-4.docx
 Tuesday, August 04, 2020, 15:04: Roughing.

Wednesday, August 05, 2020, 06:08: Turbo pumps on. 

Thursday, August 06, 2020, 06:58: Vacuum @ 1.52e-06T
Entry  Tuesday, August 11, 2020, 12:04, Aaron Schmidt, UCx, LP-SIS, , , 44139-10, 43515-4, In progress, UCx HS conditioning with PEEK assembly 
HS target leg openings were milled. Short from previous test by the look of it. TBHT insulator on source side is cracked.
Wiring up top adjusted for better clearance. EE (K) Cap appears ok.
Tuesday, August 11, 2020, 12:03: Roughing.
Entry  Friday, April 04, 2014, 17:01, Rick Maharaj, UC#9, LP-SIS, ITW, TM1, , 39230-3, Done, Conditioning Heatshield for UCx#9 
Friday, April 04, 2014, 16:26: Heatshield/Ionsource assembly for UC LP SIS  installed in test stand with Ta tube as heat load.
Friday, April 04, 2014, 16:29: Chamber roughing started
Friday, April 04, 2014, 16:51: Turbos started
Entry  Tuesday, October 29, 2024, 18:25, Aaron Schmidt, UC#46 (assembly only), LP-IG-LIS, ITW, TM4, , 42972-6 / 39956-1, In progress, Conditioning UC#46 Assembly 
 42972-6 Base / 39956-1 Lid
Tuesday, October 29, 2024, 18:20: Roughing. 
Tuesday, October 29, 2024, 18:52: TP1B on. 
Entry  Tuesday, November 15, 2022, 11:24, Aaron Schmidt, UC#41 assembly, LP-SIS, ITE, TM4, 45220-8, 45235-4, In progress, Conditioning UC#41 assembly UC#41_assembly_conditioning.docx
 LP-SIS 45220-8 is empty & for testing only.
Tuesday, November 15, 2022, 11:00: Roughing.
Tuesday, November 15, 2022, 11:21: BV1A open. 
Entry  Wednesday, June 02, 2021, 10:45, Aaron Schmidt, UC#34 HS, LP-SIS, , TM2, 43044-13, 44378-1, In progress, UC#34 HS conditioning 
 Straight tube target / TGHT for outgassing.
Wednesday, June 02, 2021, 11:06: Roughing.
Wednesday, June 02, 2021, 12:15: TP1B on. 
Entry  Wednesday, May 26, 2021, 14:29, Aaron Schmidt, UC#33 (HS), LP-SIS, ITW, TM2, , 44378-3, In progress, UC#33 HS conditioning Conditioning_UC#33_HS.docx
HS waterlines were very tight to line up.
Wednesday, May 26, 2021, 14:29: Roughing.
Wednesday, May 26, 2021, 15:09: TP1B on. 
Entry  Friday, September 21, 2018, 11:41, Aaron Schmidt, UC#26, LP-IG-LIS, ITE, TM4, , 42132-1, In progress, Conditioning Heat Shield for UC#26 TS-2018-09-21-14-53.rgaUC#26.docx
Friday, September 21, 2018, 11:40: Roughing
Friday, September 21, 2018, 11:41: Doors sealed for roughing.
Friday, September 21, 2018, 14:02: Turbos on.
Entry  Monday, September 17, 2018, 11:52, Aaron Schmidt, UC#25, LP-SIS, ITW, TM2, , 42752-9, In progress, Conditioning Heat Shield for UC#25 OMEGA_OM-DAQPRO-5300_24-Sep-18_08.08.26.dlpTS-2018-09-17-14-10.rgaUC#25.docx
Monday, September 17, 2018, 11:47: Roughing*. Doors not sealing, help acq'd 
Monday, September 17, 2018, 11:51: Roughing. Doors sealed
Monday, September 17, 2018, 12:30: Turbo pumps started.