86
|
Tuesday, May 15, 2012, 08:08 |
Rick Maharaj | sic#27 | | | | | | | Turbos off | Target needs to be removed form teststand
to remove heatshielding around target oven.
The chamber will be vented, water circuits |
|
744
|
Monday, July 08, 2019, 09:20 |
Luca Egoriti | p2n1 | | ITE | | | | In progress | p2n heating test | (see entry 742)
p2n target heated over the weekend |
|
735
|
Saturday, June 22, 2019, 17:05 |
Luca Egoriti | p2n | | | | | | Done | Test stand installation | I opened the test stand because I forgot
to install tantalum heat shields around the
target. Everything was reinstalled as before |
|
739
|
Wednesday, June 26, 2019, 14:41 |
Carla Babcock | none | | | | | | Problems/Solutions | Issues with test stand wiring in service cap area | The wiring on the top of the test stand
was burned, see entry 737.
Probable cause of this is as follows: |
|
683
|
Friday, August 31, 2018, 12:27 |
Aaron Schmidt | nSiC#1 | LP-SIS | ITW | TM2 | 43044-1 | 42752-4 | In progress | Conditioning nSiC#1 | Friday, August 31, 2018, 12:27: Roughing.
Friday, August 31, 2018, 13:19: Turbo
pumps started. |
15x |
274
|
Friday, January 18, 2013, 15:34 |
Anders Mjos | empty | | | | | | | Pumping down empty chamber | Started roughing
Friday, January 18, 2013, 15:25:
Started turbos |
|
722
|
Tuesday, May 14, 2019, 10:22 |
Aaron Schmidt | ZrC#8 | LP-SIS | ITE | TM2 | 43044-5 | 42972-3 | In progress | Conditioning ZrC#8 HS | Tuesday, May 14, 2019, 10:21: Roughing
Tuesday, May 14, 2019, 10:51: Turbo
pumps on. |
|
450
|
Monday, June 15, 2015, 14:09 |
Anders Mjos | ZrC#7 | LP-SIS | | TM2 | 41177-1 | | In progress | ZrC#7 Conditioning | Monday, June 15, 2015, 14:05 Roughing
Monday, June 15, 2015, 14:39: Turbos
started. |
|
454
|
Tuesday, June 30, 2015, 14:51 |
Anders Mjos | ZrC#7 | LP-SIS | | TM2 | 41177-2 | | In progress | ZrC#7 Conditioning 2 | Tuesday, June 30, 2015, 14:51: Roughing
Tuesday, June 30, 2015, 16:14: Started
turbos. CG1 at 0.075 T |
|
397
|
Friday, August 08, 2014, 12:45 |
Anders Mjos | ZrC#6 | LP-SIS | ITW | TM1 | 40282-3 | 39230-5 | Done | Condictioning ZrC#6 | Friday, August 08, 2014, 12:44: Stopped
turbos
Friday, August 08, 2014, 14:42: Venting |
|
930
|
Tuesday, May 31, 2022, 13:35 |
Aaron Schmidt | UCx HS | | ITW | TM2 | | 44378-19 | In progress | Conditioning UC#38 assembly | Using a broken LP-FEBIAD source. TGHT only.
Tuesday, May 31, 2022, 13:24: Roughing.
Tuesday, May 31, 2022, 13:54: TP1B |
|
804
|
Tuesday, August 04, 2020, 15:07 |
Aaron Schmidt | UCx | LP-SIS | | | 44139-10 | 43515-4 | In progress | UCx HS conditioning with PEEK assembly | Tuesday, August 04, 2020, 15:04:
Roughing.
Wednesday, August 05, 2020, |
|
806
|
Tuesday, August 11, 2020, 12:04 |
Aaron Schmidt | UCx | LP-SIS | | | 44139-10 | 43515-4 | In progress | UCx HS conditioning with PEEK assembly | HS target leg openings were milled. Short
from previous test by the look of it. TBHT
insulator on source side is cracked. |
|
371
|
Friday, April 04, 2014, 17:01 |
Rick Maharaj | UC#9 | LP-SIS | ITW | TM1 | | 39230-3 | Done | Conditioning Heatshield for UCx#9 | Friday, April 04, 2014, 16:26: Heatshield/Ionsource
assembly for UC LP SIS installed in
test stand with Ta tube as heat load. |
|
1026
|
Tuesday, October 29, 2024, 18:25 |
Aaron Schmidt | UC#46 (assembly only) | LP-IG-LIS | ITW | TM4 | | 42972-6 / 39956-1 | In progress | Conditioning UC#46 Assembly | 42972-6 Base / 39956-1 Lid
Tuesday, October 29, 2024, 18:20:
Roughing. |
|
944
|
Tuesday, November 15, 2022, 11:24 |
Aaron Schmidt | UC#41 assembly | LP-SIS | ITE | TM4 | 45220-8 | 45235-4 | In progress | Conditioning UC#41 assembly | LP-SIS 45220-8 is empty & for
testing only.
Tuesday, November 15, 2022, 11:00: |
|
875
|
Wednesday, June 02, 2021, 10:45 |
Aaron Schmidt | UC#34 HS | LP-SIS | | TM2 | 43044-13 | 44378-1 | In progress | UC#34 HS conditioning | Straight tube target / TGHT for outgassing.
Wednesday, June 02, 2021, 11:06:
Roughing. |
|
874
|
Wednesday, May 26, 2021, 14:29 |
Aaron Schmidt | UC#33 (HS) | LP-SIS | ITW | TM2 | | 44378-3 | In progress | UC#33 HS conditioning | HS waterlines were very tight to line up.
Wednesday, May 26, 2021, 14:29: Roughing.
Wednesday, May 26, 2021, 15:09: TP1B |
|
686
|
Friday, September 21, 2018, 11:41 |
Aaron Schmidt | UC#26 | LP-IG-LIS | ITE | TM4 | | 42132-1 | In progress | Conditioning Heat Shield for UC#26 | Friday, September 21, 2018, 11:40: Roughing
Friday, September 21, 2018, 11:41:
Doors sealed for roughing. |
|
685
|
Monday, September 17, 2018, 11:52 |
Aaron Schmidt | UC#25 | LP-SIS | ITW | TM2 | | 42752-9 | In progress | Conditioning Heat Shield for UC#25 | Monday, September 17, 2018, 11:47: Roughing*.
Doors not sealing, help acq'd
Monday, September 17, 2018, 11:51: |
|
|