Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 7 of 8  Not logged in ELOG logo
  ID Date Author Target/No.#down Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  15   Friday, September 23, 2011, 17:03 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8SpentRun finishedFriday, September 23, 2011, 16:54:

    Cu-gaskets used for leak
checking target had a leak rate of about 
  
  17   Monday, October 17, 2011, 14:45 John WongSiC#26HP-FEBIADITETM438295-938307-8SpentRun finished

    

       
            
 EE_after_teststand.jpgSiC#26_specification.png 
  4   Thursday, March 31, 2011, 15:38 John WongSiC#25HP-SISITETM438481-138307-?SpentITE-TM4-SiC#25-Hp-SIS Thu Mar 31 15:19:51 2011:  SiC#25
was made sometime in December of 2010. 
It is now in the target module and ready
 big_mass_scan.jpg 
  64   Wednesday, June 29, 2016, 11:49 Laura LambertSiC # 33HP-SIS  41369-4 ReadySiC#33 target description Wednesday, June 29, 2016, 11:47
See attachment for target
 elog_target_description.JPG 
  30   Tuesday, December 11, 2012, 15:44 Anders MjosSiCHP-FEBIADITWTM4nana (old style fittings)ReadyTest target for the Conditioning Station The target has been used for operator
training previously at the ISAC Test Stand.

    9-pin connector was completed
  
  36   Friday, August 30, 2013, 14:45 John WongNiO#2HP-FEBIAD  39530-639069-4SpentNiO target descriptionFriday, August 30, 2013, 14:38 
NiO/Ni#2                                            
Average
  
  29   Thursday, October 11, 2012, 11:41 John WongNiO#1HP-FEBIADITETM438481-739069-1/10(lid)SpentNiO target description (Should have posted this before my long
vacation... Anyway, it's for documentation)
Thursday, October 11, 2012, 11:38
  
  11   Wednesday, July 06, 2011, 14:29 John WongNb/SpareHP-SIS  38817-2 In progressTarget ready for AssemblyTarget oven w.o# 38817-2:
inner diameter: left = 18.29mm, right
= 18.16mm.
  
  103   Tuesday, October 27, 2020, 12:53 Aaron SchmidtNb#9LP-SISITETM444508-2 ReadyNb#9 LP-SIS target description Nb#9 LP-SIS target description:
 Nb#9_Target_Loading_data.pdf 
  28   Wednesday, September 12, 2012, 01:53 John WongNb#7LP-SIS  39165-6 SpentNb#7 target description Wednesday, September 12, 2012, 02:10
Nb#7 target description: 
Total Nb foils = 400 discs
 Nb#7_target_description.jpg 
  19   Monday, February 13, 2012, 16:00 John WongNb#6LP-SISITWTM138634-436833-1SpentNb#5 ready in the Conditioning Station 

Monday, February 13, 2012,
16:00 
  
  23   Monday, June 11, 2012, 13:46 John WongNb#6LP-SISITWTM138634-436833-1SpentNb#5 run finished

    

       
            
  
  135   Thursday, August 24, 2023, 14:16 Aaron SchmidtNb#11LP-IG-LISITWTM245447-9 In progressNb#11 Target descriptionNb#11 LP-IG-LIS target description:
 Nb#11_Target_Loading_Data.pdf 
  132   Friday, June 23, 2023, 09:02 Aaron SchmidtNb#10LP-IG-LISITWTM245447-7  Nb#10 target description. Nb#10 LP-IG-LIS target
description:
  
  8   Thursday, June 16, 2011, 17:26 John WongNbHP-SIS  38817-1 SpentTarget is ready and stored in cabinet  Thu Jun 16 17:21:10 2011
Two targets of Nb-HP-SIS are complete
and ready to be installed in the heat shields:
  
  26   Wednesday, August 01, 2012, 09:37 Pierre BricaultITE-TM4-UO#3LP-FEBIADITETM4  Problems/SolutionsShort has developed while lowering the cathode heater On tuesday July we lower the cathode
heater to swap the anode-cathode bias. While
lowering the cathode heater a short on the
  
  105   Tuesday, March 16, 2021, 17:05 Luca EgoritiITE-TM4-UC#32-P2N-SISHP-SISITETM4--In progressUO2 discs cuttingThis afternoon, Darwin prepared in the
hot lab fume hood the two UO2 slurries to
be cut into P2N target discs. Later, I took
 UC32-P2N_material_info.jpgFume_hood.jpg 
  126   Monday, February 06, 2023, 10:02 Darwin Ortiz RosalesC#6   45220-6 ReadyTarget C#6 Description   C#6_Description.png 
  125   Wednesday, December 14, 2022, 10:28 Darwin Ortiz RosalesC#5   44691-13 ReadyTarget C#5 DescriptionGraphite target  C#5_Description.png 
  122   Thursday, September 22, 2022, 13:18 Darwin Ortiz RosalesC#4LP-SIS  44691-3 ReadyTarget C#4 DescriptionThursday, September 22, 2022, 13:17  C#4_Target_Description.png 
ELOG V2.9.2-2455