ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
19
|
Monday, February 13, 2012, 16:00 |
John Wong | Nb#6 | LP-SIS | ITW | TM1 | 38634-4 | 36833-1 | Spent | Nb#5 ready in the Conditioning Station |
Monday, February 13, 2012,
16:00 |
|
23
|
Monday, June 11, 2012, 13:46 |
John Wong | Nb#6 | LP-SIS | ITW | TM1 | 38634-4 | 36833-1 | Spent | Nb#5 run finished |
|
|
12
|
Wednesday, July 06, 2011, 14:32 |
John Wong | Ta#36 | LP-SIS | ITE | TM4 | 38634-2 | 38307-10 | Spent | Target ready, will go online on July 27 | Ta-LP-SIS (w.o#38634-2)
Target consists of 400 Ta foils,
4.4 cm in length. Total mass + Ta wire |
|
18
|
Wednesday, November 16, 2011, 14:08 |
John Wong | UCx#3 | LP-SIS | ITW | TM1 | 38634-10 | 36833-3 | Spent | UCx#3 ready to go online | Wednesday, November 16, 2011, 13:51
UCx#3 descriptions:
Target oven wrapped with 3-Ta heat |
|
20
|
Monday, February 20, 2012, 16:39 |
John Wong | UO2/Nb #1 | LP-FEBIAD | ITE | TM4 | 38481-9 | | Spent | target ready for assembly | Monday, February 20, 2012, 16:25
Mass of empty target oven used =
461.55g |
|
24
|
Wednesday, July 04, 2012, 11:32 |
Anders Mjos | UO2/Nb #1 | LP-FEBIAD | ITE | TM4 | 38481-9 | 39069-3 | Spent | target assembled |
|
|
41
|
Wednesday, April 30, 2014, 16:36 |
John Wong | SiC#30 | HP-FEBIAD | ITE | TM3 | 38481-8 | | Spent | SiC#30 Target description | Wednesday, April 30, 2014, 15:16
Note:
This target was built in 2011. |
|
29
|
Thursday, October 11, 2012, 11:41 |
John Wong | NiO#1 | HP-FEBIAD | ITE | TM4 | 38481-7 | 39069-1/10(lid) | Spent | NiO target description | (Should have posted this before my long
vacation... Anyway, it's for documentation)
Thursday, October 11, 2012, 11:38 |
|
34
|
Wednesday, July 10, 2013, 18:41 |
John Wong | SiC#29 | HP-FEBIAD-CTL | ITE | TM4 | 38481-6 | 39956-4 | Spent | SiC#29 - Target description | Wednesday, July 10, 2013, 18:32
SiC#29 HP-FEBIAD-CTL target description:
Total SiC foils = 510 discs |
|
3
|
Tuesday, March 29, 2011, 14:14 |
John Wong | Ta#35 | HP-SIS | ITE | TM4 | 38481-3 | 38303-4 | Spent | ITE-TM4-Ta#35-Hp-SIS | ITE-TM4-Ta#35-Hp-SIS
Thu Apr 7 15:32:32 2011:
Target oven - w.o#38481-3. |
|
4
|
Thursday, March 31, 2011, 15:38 |
John Wong | SiC#25 | HP-SIS | ITE | TM4 | 38481-1 | 38307-? | Spent | ITE-TM4-SiC#25-Hp-SIS | Thu Mar 31 15:19:51 2011: SiC#25
was made sometime in December of 2010.
It is now in the target module and ready |
|
15
|
Friday, September 23, 2011, 17:03 |
Anders Mjos | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | Spent | Run finished | Friday, September 23, 2011, 16:54:
Cu-gaskets used for leak
checking target had a leak rate of about |
|
17
|
Monday, October 17, 2011, 14:45 |
John Wong | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | Spent | Run finished |
|
|
10
|
Wednesday, July 06, 2011, 14:13 |
John Wong | Ta#40 | HP-SIS | | | 38295-4 | | Spent | Target description | Details about Ta Hp surface, w.o#38295-4
(spare):
This target was built as a spare. |
|
121
|
Tuesday, August 16, 2022, 09:48 |
Darwin Ortiz Rosales | SiC#44 | HP-FEBIAD | | | 37978-1 | | Ready | Target SiC#44 Description | Tuesday, August 16, 2022, 09:47
|
|
105
|
Tuesday, March 16, 2021, 17:05 |
Luca Egoriti | ITE-TM4-UC#32-P2N-SIS | HP-SIS | ITE | TM4 | - | - | In progress | UO2 discs cutting | This afternoon, Darwin prepared in the
hot lab fume hood the two UO2 slurries to
be cut into P2N target discs. Later, I took |
|
9
|
Friday, June 17, 2011, 11:58 |
John Wong | UCx (flakes) | LP-SIS | | | | | Problems/Solutions | Making UC2 flakes (stock# 2011_A & _B) | Fri Jun 17 10:28:47 2011
First batch of UO2/C mixture of carbonization
(Stock# 2011_A): |
8x |
26
|
Wednesday, August 01, 2012, 09:37 |
Pierre Bricault | ITE-TM4-UO#3 | LP-FEBIAD | ITE | TM4 | | | Problems/Solutions | Short has developed while lowering the cathode heater | On tuesday July we lower the cathode
heater to swap the anode-cathode bias. While
lowering the cathode heater a short on the |
|
46
|
Monday, August 18, 2014, 14:39 |
Laura Lambert | ThO2 #1 | LP-SIS | | | | | | ThO2 #1 Target Description | Monday, August 18, 2014, 14:53
See attachment for target description
|
|
61
|
Friday, March 11, 2016, 10:18 |
Laura Lambert | Ta # 47 | | ITE | TM4 | | | Spent | Ta # 47 target desscription | Friday, March 11, 2016, 10:13
Ta#47 LP-SIS [new small center |
|