Thursday, September 24, 2015, 13:42, Laura Lambert, SiC#32, HP-FEBIAD, , , 39530-5, , Ready, SiC#32 target description
|
Thursday, September 24, 2015, 11:46
See attachment for target description.
|
Wednesday, April 29, 2015, 15:39, Laura Lambert, SiC#31, HP-SIS, , , 38817-7, , Ready, SiC#31 Target description
|
Wednesday, April 29, 2015, 15:30
SiC#31 HP-SIS target description:
Total SiC foils = 520 discs |
Wednesday, April 30, 2014, 16:36, John Wong, SiC#30, HP-FEBIAD, ITE, TM3, 38481-8, , Spent, SiC#30 Target description
|
Wednesday, April 30, 2014, 15:16
Note:
This target was built in 2011. The endcaps were replaced after they got vaporized in Evap#1 during the sintering process, and the target |
Wednesday, July 10, 2013, 18:41, John Wong, SiC#29, HP-FEBIAD-CTL, ITE, TM4, 38481-6, 39956-4, Spent, SiC#29 - Target description
|
Wednesday, July 10, 2013, 18:32
SiC#29 HP-FEBIAD-CTL target description:
Total SiC foils = 510 discs |
Tuesday, March 19, 2013, 13:32, John Wong, SiC#28-RFQ, LP-SIS, , TM4, LP-RFQ (NEW), , Spent, SiC#28-RFQ target description
|
Tuesday, March 19, 2013, 12:28
SiC#28 - RFQ target description:
Total SiC foils = 325 discs |
Wednesday, August 01, 2012, 09:37, Pierre Bricault, ITE-TM4-UO#3, LP-FEBIAD, ITE, TM4, , , Problems/Solutions, Short has developed while lowering the cathode heater
|
On tuesday July we lower the cathode heater to swap the anode-cathode bias. While lowering the cathode heater a short on the anode developed.
The polarity swap was not possible because the target/tube assembly has also a short to common.
We return the configuration has it was and we added two 100 Ohms: 5 W resistor between the common and the heaters to prevent current to flow back |
Friday, September 23, 2011, 17:03, Anders Mjos, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Spent, Run finished
|
Friday, September 23, 2011, 16:54:
Cu-gaskets used for leak checking target had a leak rate of about 10-8 10-9 atm cc/sec. Replaced
with silver plated SS gaskets and no leak detected above 10-11 atm cc/sec.
The target can not hold high voltage when it is sitting |
Monday, October 17, 2011, 14:45, John Wong, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Spent, Run finished
|
Anders Mjos wrote:
Friday, September 23, 2011, 16:54: |
Thursday, October 11, 2012, 11:41, John Wong, NiO#1, HP-FEBIAD, ITE, TM4, 38481-7, 39069-1/10(lid), Spent, NiO target description
|
(Should have posted this before my long vacation... Anyway, it's for documentation)
Thursday, October 11, 2012, 11:38
|
Friday, August 30, 2013, 14:45, John Wong, NiO#2, HP-FEBIAD, , , 39530-6, 39069-4, Spent, NiO target description
|
Friday, August 30, 2013, 14:38
NiO/Ni#2
Average |
Tuesday, October 27, 2020, 12:53, Aaron Schmidt, Nb#9, LP-SIS, ITE, TM4, 44508-2, , Ready, Nb#9 LP-SIS target description
|
Nb#9 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm |
Wednesday, September 12, 2012, 01:53, John Wong, Nb#7, LP-SIS, , , 39165-6, , Spent, Nb#7 target description
|
Wednesday, September 12, 2012, 02:10
Nb#7 target description:
Total Nb foils = 400 discs |
Monday, June 11, 2012, 13:46, John Wong, Nb#6, LP-SIS, ITW, TM1, 38634-4, 36833-1, Spent, Nb#5 run finished
|
John Wong wrote:
|
Monday, February 13, 2012, 16:00, John Wong, Nb#6, LP-SIS, ITW, TM1, 38634-4, 36833-1, Spent, Nb#5 ready in the Conditioning Station
|
Monday, February 13, 2012, 16:00
Nb#5 target description: |
Thursday, August 24, 2023, 14:16, Aaron Schmidt, Nb#11, LP-IG-LIS, ITW, TM2, 45447-9, , In progress, Nb#11 Target description
|
Nb#11 LP-IG-LIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm (0.001") |
Friday, June 23, 2023, 09:02, Aaron Schmidt, Nb#10, LP-IG-LIS, ITW, TM2, 45447-7, , , Nb#10 target description.
|
Nb#10 LP-IG-LIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm (0.001") |
Tuesday, June 21, 2022, 15:34, Matthew Gareau, SiC#42, SiC#43, , , TM2, , , Problems/Solutions, Multipin guide pin issues
|
While removing the SiC#42 it became apparent that the multipin guide pin had become loose again and was not allowing the target to dismount from
the module.
The multipin shoulder bolts were removed and then the multipin was able to be pried off. |
Tuesday, September 27, 2011, 10:36, Anders Mjos, TaC#1, LP-SIS, ITE, TM1, 38634-6, 36833-6, Problems/Solutions, Material deposited on Extraction Electrode after Test Stand
|
John Wong wrote:
Tuesday, September 06, 2011, 13:14: |
Friday, June 17, 2011, 11:58, John Wong, UCx (flakes), LP-SIS, , , , , Problems/Solutions, Making UC2 flakes (stock# 2011_A & _B) 8x
|
Fri Jun 17 10:28:47 2011
First batch of UO2/C mixture of carbonization (Stock# 2011_A):
UO2 used = 50.120g (left overs + container = 411.23g) |
Tuesday, March 29, 2011, 14:14, John Wong, Ta#35, HP-SIS, ITE, TM4, 38481-3, 38303-4, Spent, ITE-TM4-Ta#35-Hp-SIS
|
ITE-TM4-Ta#35-Hp-SIS
Thu Apr 7 15:32:32 2011:
Target oven - w.o#38481-3. |
|