IDdown Date Author Category Type Specific Subject Text Attachments
  298   Thursday, July 28, 2022, 12:51 Adam NewsomeRepairOtherHot CellMeson Hall Hot Cell - Nuclear Ventilation IssueIt was reported today by Peter Bratt that
the nuclear ventilation system for the hot
cell is not functioning. At this time, the
  
  297   Wednesday, July 06, 2022, 12:52 Adam NewsomeOtherOtherHot CellPotential hot cell window oil leakSome oil was noticed around the hot cell
window, on the control panel, and on the
ground below the control panel. A leak is
  
  296   Wednesday, July 06, 2022, 12:49 Adam NewsomeRepairOtherHot CellHot Cell - Helium wand tubing brokenThe tubing for the helium wand inside the
hot cell is broken and needs to be replaced.
More tubing has been ordered and the job
  
  295   Wednesday, July 06, 2022, 12:49 Matthew GareauRepairOtherOtherHelium line damage, and hotcell window oil leakingToday myself and Adam Newsome started the
leak detection steps for a target exchange
and notice that the Helium line was not connected/broken
  
  294   Wednesday, June 08, 2022, 08:59 Adam NewsomeOtherTarget 2CoolingT2 flow rate sensor (BL1A:T2CS:FGTGT ) - warning and trip limits adjustedSee fault 14966: 





Normal
0
 After_Adjustment.PNGSensor_data_around_June_6-8.PNG 
  293   Wednesday, May 25, 2022, 10:16 Adam NewsomeStandard OperationTarget 2TargetT2-MK2 moved: from storage location to hot cellTarget T2-MK2 was moved from the storage
location (formerly position 3) to the hot
cell in preparation for replacement of end
  
  292   Wednesday, May 25, 2022, 10:15 Adam NewsomeStandard OperationTarget 1TargetT1-MK2 moved from hot cell to storage areaThe T1-MK2 target was moved from the hot
cell to the storage area, in position 5.
Note: manual nudging of the flask was required
  
  291   Thursday, May 05, 2022, 14:39 Adam NewsomeStandard OperationTarget 1TargetT1-MK1 and T2-MK1 profile monitor actuation testThe profile monitor actuation tests were
completed for T1 and T2. No abnormalities
were noticed in vacuum during either test.
  
  290   Thursday, May 05, 2022, 14:38 Adam NewsomeMaintenanceTarget 2ControlsT2-MK1: profile monitor actuation check and repair to connectorAn attempt was made to actuation the T2
profile monitor, however it showed up in
EPICS as being not present. Furthermore,
 T2-MK1_prof_mon_connector_-_rear_-_after_fix.jpg 
  289   Wednesday, May 04, 2022, 11:27 Adam NewsomeStandard OperationTarget 2M9M9 and M20 Beam Blocker Actuation TestThe beam blockers for M9 and M20 were actuated,
and vacuum was monitored to ensure no disruptions.
Both actuation tests were successful. Motion
  
  288   Thursday, April 14, 2022, 14:38 Adam NewsomeOtherTarget 2DiagnosticsIssue with Protect Monitor SHV CableDiagnostics group (Shengli Liu) noted a
lack of connectivity between control panel
and T2 Protect Monitor via the high voltage
 PXL_20220414_210238000.jpgPXL_20220414_210053641.jpgPXL_20220414_210037717.jpg 
  287   Wednesday, April 13, 2022, 12:33 Adam NewsomeStandard OperationTarget 2TargetT2-MK1 moved: from storage area to target stationThe T2-MK1 target was moved from the storage
area (formerly position 4) to the target
station. Services were reconnected in order
  
  286   Wednesday, April 13, 2022, 12:31 Adam NewsomeStandard OperationTarget 2TargetT2-MK2 moved: from target station to storageThe T2-MK2 target was moved from the target
station to the storage area (position 3).
Upon removal, it was measured with a pole
  
  285   Wednesday, March 16, 2022, 14:16 Matthew GareauStandard OperationOtherCoolingT1/T2 water packages drained to B1A AWHT, tested, and released. Also solenoid valve SV1 broken The T1/T2 water packages were drained
into the B1AAWHT (280L), the water was sampled
and tested by RPG, results included in elog.
 11_Mar_2022_Tritium_Records_T1_T2_from_RPG.pdfsolenoid_valve_SV1.jpg 
  284   Monday, March 14, 2022, 14:09 Adam NewsomeMaintenanceTarget 2Cooling T2 cooling system: filled, tuned, leak-checked The T2 cooling system was refilled with
water via the expansion tank until the tank
level read approximately 38 cm. 
  
  283   Monday, March 14, 2022, 14:08 Adam NewsomeMaintenanceTarget 1CoolingT1 cooling system: filled, tuned, leak-checkedThe T1 cooling system was refilled with
water via the expansion tank until the tank
level read approximately 38 cm.
  
  282   Friday, March 11, 2022, 15:09 Adam NewsomeMaintenanceTarget 2CoolingFilters replaced: T2 cooling systemAll filters were replaced for the T2 cooling
system: demineralizing resin circuit and
target water system. 
  
  281   Friday, March 11, 2022, 15:08 Adam NewsomeMaintenanceTarget 1CoolingFilters replaced: T1 cooling systemAll filters were replaced for the T1 cooling
system: demineralizing resin circuit, target
water system, and M15. 
  
  280   Friday, March 11, 2022, 15:06 Adam NewsomeMaintenanceTarget 2CoolingO-rings on T2 cooling package water reservoir changedThe four o-rings on top of the T2 cooling
package water reservoir were  changed as
per the recommended 5 year replacement schedule.
  
  279   Friday, March 11, 2022, 15:05 Adam NewsomeMaintenanceTarget 1CoolingO-rings on T1 cooling package water reservoir changedThe four o-rings on top of the T1 cooling
package water reservoir were changed as per
the recommended 5 year replacement schedule.
  