  RH-Meson Hall, Page 17 of 18  Not logged in ELOG logo
IDdown Date Author Category Type Specific Subject Text Attachments
  38   Thursday, June 07, 2012, 18:08 Isaac EarleRepairTarget 1TargetHot Cell Manipulator Broken Tape A tape snapped on the west side manipulator
today while working on the T1-MK2 target
repair.  The tape travels through to
  
  37   Wednesday, June 06, 2012, 08:58 Isaac EarleMaintenanceTarget 2TargetT2 Monolith Leak Check While leak checking components in
the M20 front end on May 25th, the top of
the T2 monolith was also checked by flooding
  
  36   Wednesday, June 06, 2012, 08:48 Isaac EarleRepairTarget 1TargetManipulator Repair Complete Repair of the west side hot cell
manipulator was completed and the manipulator
was re-installed into the hot cell.  No
  
  35   Wednesday, May 30, 2012, 15:39 Isaac EarleRepairTarget 1TargetWest Side Manipulator Removed from Hot Cell The west side manipulator was removed
from the hot cell using the new manipulator
removal frame.  The operation went smoothly
 IMG_0227.JPGIMG_0231.JPGIMG_0238.JPGIMG_0241.JPG 
  34   Monday, May 28, 2012, 17:17 Isaac EarleRepairTarget 2CoolingT2 Water Loss Update The T2 cooling package, the top of
the T2 monolith, and the Hansen water connections
which connect the package to the target were
  
  33   Thursday, May 24, 2012, 18:26 Isaac EarleRepairTarget 2CoolingWater Leak From T2 Cooling Package (Disconnected from Target) Today I noticed a "NOT OK"
signal from T2 water expansion tank warning
level sensor.  I checked the water level
  
  32   Monday, April 23, 2012, 09:55 Isaac EarleRepairTarget 1TargetHot Cell Manipulator Broken Cable While working on the leak repair
of the T1-MK2 target in the hot cell on Friday
April 20th, a cable snapped on the slave
  
  31   Thursday, April 12, 2012, 15:19 Isaac EarleMaintenanceTarget 2TargetT2 Target Water Drained In preparation for extended periods
of the T2 volume being vented during the
M20 repair, the T2 water package was shut-off,
  
  30   Wednesday, April 11, 2012, 17:02 Isaac EarleRepairTarget 2TargetT2 Vacuum Interlock & Expansion Tank Level Sensor The problem with the T2 vacuum interlock
was fixed by restarting the "Crate TG1"
control panel microprocessor.  The T1
  
  29   Thursday, April 05, 2012, 15:22 Isaac EarleMaintenanceTarget 1TargetT1 & T2 Profile and Protect "Blip" Test Diagnostics group completed their
"blip" signal response tests on
the T1 and T2 profile and protect monitors.
  
  28   Thursday, April 05, 2012, 12:14 Isaac EarleRepairTarget 1TargetT1 & T2 Profile MonitorsControls Group replaced the wiring and
wire harness for the profile monitor limit
switches on T2.  The monitor was actuated
  
  27   Wednesday, April 04, 2012, 15:51 Isaac EarleRepairTarget 2TargetBL1A UpdateVacuum interlock defeat jumpers were removed
for T1 and T2.  The interlock was tested
by venting the T1 and T2 volumes.  Both
  
  26   Tuesday, April 03, 2012, 15:55 Isaac EarleMaintenanceTarget 1TargetT1 Ladder Position Look-up Tables Updated Graham Waters has activated the appropriate
target ladder position look-up tables for
the T1-MK1 target which was installed in
  
  25   Monday, April 02, 2012, 15:18 Isaac EarleRepairTarget 1TargetT1-MK1 Installed in Beam Line The T1-MK1 target was transferred
from the storage pit to the beam line.  Services
were hooked up and the cooling package was
  
  24   Tuesday, March 27, 2012, 13:14 Isaac EarleRepairTarget 1TargetWater removal from T1 monolithAll water was removed from the base of
the target hole in the T1 monolith using
a suction tube device and wypalls.  Video
 downstream.jpgsouth.jpgupstream.jpgM13.jpg 
  23   Friday, March 23, 2012, 14:50 Isaac EarleRepairTarget 1TargetT1 Target Leak - UpdateThe T1-MK2 target was transferred from
the beam line to the hot cell.  Water
was seen in the bottom of the target pipe
  
  22   Thursday, March 22, 2012, 13:58 Isaac EarleRepairTarget 1CoolingT1 Package Water Leak - Update Vacuum group pumped down on the T1
& T2 volumes (because there is no cold
trap on the T1 pump) for approximately 1
  
  21   Wednesday, March 21, 2012, 17:28 Isaac EarleRepairTarget 1CoolingT1 Package Water Leak - Update The water level in the T1 cooling
package expansion tank was checked again
today approximately 24 hours after it was
  
  20   Tuesday, March 20, 2012, 10:31 Isaac EarleRepairTarget 1CoolingT1 Cooling Package - Potential Water LeakThe T1 expansion tank warning level sensor
had tripped and the level was approximately
1cm from the base of the tank.  No trip
  
  19   Tuesday, March 06, 2012, 15:27 Isaac EarleRepairTarget 1TargetQuick Connect Fittings on T1 Target The air hoses for the profile monitor
supply line were inspected and no cracking
was found (was found on T2).  The quick
  
ELOG V2.9.2-2455