  182   Tuesday, October 13, 2015, 10:52 Isaac EarleStandard OperationTarget 1TargetT1 & T2 Target Ladder Moves The T1 and T2 targets were both moved
from Position 0 to Position 4 at approximately
2:30am on Saturday October 10th using the
  
  61   Wednesday, October 24, 2012, 17:38 Isaac EarleRepairTarget 2TargetT1 & T2 Target Ladder Control System Status During the recent shutdown for the
T2/M9 joint repair Graham Waters replaced
the corrupted application code on the controller
  
  155   Thursday, April 23, 2015, 16:29 Isaac EarleStandard OperationTarget 1TargetT1 & T2 Profile and Protect Monitors Electrical Check CompletedAn electrical check has been completed
for the T1 & T2 Profile and Protect Monitors
by Dave Cameron and Mike Russell.  They
  
  29   Thursday, April 05, 2012, 15:22 Isaac EarleMaintenanceTarget 1TargetT1 & T2 Profile and Protect "Blip" Test Diagnostics group completed their
"blip" signal response tests on
the T1 and T2 profile and protect monitors.
  
  82   Tuesday, May 14, 2013, 13:26 Isaac EarleDevelopmentTarget 1TargetT1 & T2 Profile ScanThe T1 and T2 profile monitors were used
during today's development shift.  Target
ladder movement for T1 was done at the panel
  
  28   Thursday, April 05, 2012, 12:14 Isaac EarleRepairTarget 1TargetT1 & T2 Profile MonitorsControls Group replaced the wiring and
wire harness for the profile monitor limit
switches on T2.  The monitor was actuated
  
  185   Monday, January 18, 2016, 17:19 Isaac EarleStandard OperationTarget 1CoolingT1 & T2 Packages Drained; BL1A Holding Tank Released The T1 and T2 cooling packages were
drained to the BL1A holding tank on Jan 8
2016.  The volumes were 100L and 80L
  
  134   Monday, January 12, 2015, 16:35 Isaac EarleStandard OperationTarget 1CoolingT1 & T2 MRO StatusThe following tasks have been performed
at T1:
- T1 monolith painted using grey
  
  90   Wednesday, October 23, 2013, 15:30 Isaac EarleDevelopmentTarget 1CoolingT1 & T2 High Temp Safety Switch Tested An end-to-end test was performed
on the new T1 and T2 high temperature safety
switches yesterday during the maintenance
  
  17   Thursday, February 09, 2012, 17:19 Isaac EarleRepairTarget 1CoolingT1 & T2 General MRO The following work was performed
on the T1 cooling package:
- New filter housing installed for
  
  51   Tuesday, July 17, 2012, 15:30 Isaac EarleDevelopmentTarget 1CoolingT1 & T2 Expansion Tank Level Warnings Added Mike Mouat and Juan Pon have modified
the control system so that the control room
will receive a message when the warning or
  
  43   Friday, June 22, 2012, 13:48 Isaac EarleDevelopmentTarget 1CoolingT1 & T2 Expansion Tank Level Sensor Recording EnabledMike Mouat enabled recording for T1 and
T2 expansion tank warning and trip level
sensors on XTPAGE/XSTRIP.
  
  167   Wednesday, July 15, 2015, 10:33 Isaac EarleStandard OperationTarget 1CoolingT1 & T2 Cooling System Check- All T1 and T2 values on XTPAGE were stripped
back to April 1, 2015:  All systems
appear to be functioning normally, nothing
  
  102   Thursday, February 06, 2014, 17:05 Isaac EarleStandard OperationTarget 1CoolingT1 & T2 Cooling Package Filters ChangedWater was drained from the T1 and T2 cooling
packages, samples taken, and delivered to
RPG.
  
  193   Thursday, March 31, 2016, 11:48 Isaac EarleStandard OperationTarget 1TargetT1 & T2 Beryllium Target Manufacturing CompleteManufacturing of a new batch of T1 and
T2 beryllium targets has been completed.
The job was completed under Machine
 T1_T2_Be_Target_Documentation_(2016_Batch).xlsx 
  6   Thursday, January 05, 2012, 10:18 Isaac EarleMaintenanceTarget 2CoolingSwapped Resin in T2 Cooling PackageDrained T2 cooling package water, collected
sample and delivered to RPG.  Swapped
resin can, refilled, and restarted cooling
  
  97   Wednesday, January 15, 2014, 15:38 Isaac EarleStandard OperationTarget 2Water LeakSuck Tube Drained and RinsedThe suck tube vessel was drained, rinsed,
and transported to the active sink area in
the Meson Hall Hot Cell Lab.  There
 IMG_1276.JPGIMG_1291.JPGIMG_1295.JPGIMG_1296.JPGIMG_1297.JPG 
  343   Thursday, February 01, 2024, 11:16 Albert KongStandard OperationOtherCoolingSpent resin can rinse, purge, and drying The recently removed resin can from
the T2 target station was rinsed with city
water and flushed with compressed air for
  
  243   Tuesday, August 28, 2018, 11:16 Isaac EarleStandard OperationOtherOtherSouth TNF Holding Tank water released The water in the South TNF Holding
Tank was released today under work permit
#C2018-08-28-3.  The tank contained
  
  57   Thursday, September 13, 2012, 18:09 Isaac EarleMaintenanceTarget 1CoolingSeptember Shutdown T1 & T2 MRO The following tasks were performed
during the 2012 September Shutdown:
- Both targets moved to position
 IMG_0624.JPGIMG_0658.JPG 