  ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  2078   Friday, March 06, 2020, 09:35 David WangSpent Target VaultStandard Operation SiC #39Spent target SiC#39 removal from SHC to storage vault.Spent target SiC#39 is removed from SHC
to storage vault at 4C in pail #227.The move
is successful.  Note:The small aluminum
  
  2111   Friday, June 26, 2020, 10:43 Adam NewsomeSpent Target VaultStandard Operation  Routine mechanical inspection: storage vault and mini-storage drive systemsAn inspection was performed on drive systems
for both storage vaults (main and mini) by
Adam Newsome and Dan McDonald. The functionality
 IMG_20200626_092538.jpgIMG_20200626_093208.jpgIMG_20200626_093924.jpgIMG_20200626_093951.jpg 
  2126   Tuesday, July 21, 2020, 14:22 Adam NewsomeSpent Target VaultStandard Operation  Emergency Close Mechanism TestThe emergency close mechanism for the Storage
Vault door was tested by Adam Newsome and
Travis Cave. The door was opened to its fully
  
  2132   Thursday, August 06, 2020, 14:33 Adam NewsomeSpent Target VaultDevelopment  Safety Group Relay Interface InstallationA relay contact-based interface module
was installed in between Safety Group's storage
vault door enable junction box and Remote
 IMG_20200806_091438.jpg 
  2141   Thursday, August 27, 2020, 11:14 Travis CaveSpent Target VaultStandard Operation Graphite #1Spent Target Move Graphite #1 along with the broke
2A2M19 wire scanner have been placed in the
spent target vault see attached PDF for deatails.
 Target_Index_2020-08-27.pdf 
  2147   Thursday, September 24, 2020, 10:34 Travis CaveSpent Target VaultStandard Operation UC#30Spent Target Move UC#30 has been placed into the spent
target vault, it was placed in pail 238 and
in spot 1A of the vault. It was 81.5 mSv/hr
 Target_Index_2020-09-24.pdf 
  2159   Friday, October 30, 2020, 09:02 Travis CaveSpent Target VaultStandard Operation Ta#48,51,54 SiC#35, and UC#25Repacking of the targets. Targets Ta#48,51,54 SiC#35,
and UC#25 were repacked and placed in the
mini vault. In the following order back to
 Target_Index_2020-10-30.pdf 
  2161   Thursday, November 05, 2020, 10:23 David WangSpent Target VaultStandard Operation  TM2 old source tray and TM4 optic tray in vault tray#9.TM2 old source tray and TM4 optic tray
are stored together in vault tray#9. The
fielding measurement at SHC post 0.5 meter
  
  2163   Thursday, November 12, 2020, 10:02 Travis CaveSpent Target VaultStandard Operation UC#31Spent Target Move UC#31 has been moved from the south
hot cell to the spent target vault. It is
in spot 8B of the vault in pail # 224 and
  
  2167   Thursday, November 19, 2020, 12:00 Adam NewsomeSpent Target VaultStandard Operation C#2Spent Target MoveC#2 has been moved from the south hot cell
to the spent target  vault. It is in spot
8A of the vault in pail # 235 and was 185
  
  2205   Thursday, March 25, 2021, 10:38 David WangSpent Target VaultStandard Operation C#1Remove pail 237 spent target C#1 from storage vault to mini storage. Pail 237 only has 200u sv/hr field at 0.5
meter. On contact measurement: 0.9 to 1.6
m sv/hr.and less than 80 count contamination
  
  2216   Friday, May 14, 2021, 11:29 David WangSpent Target VaultStandard Operation  Repack of 4 spent targets.Repack of 4 spent targets in TH and SHC. 
SiC#37 to new pail249#. SiC#36 to new pail
250#. Nb#8 to new pail 247#, SiC#33 to new
  
  2234   Thursday, July 15, 2021, 09:02 Adam NewsomeSpent Target VaultStandard Operation  Emergency Close Mechanism TestThe emergency close mechanism for the Storage
Vault door was tested  by Adam Newsome and
Travis Cave. The door was opened to its fully
  
  2241   Wednesday, August 11, 2021, 11:15 Adam NewsomeSpent Target VaultDevelopment  Mini-Storage: Cable track for e-chain installedA cable track was installed between the
mini-storage vault and the silos, for the
purpose of implementing a retractable cable
 PXL_20210811_165201449.jpg 
  2247   Friday, September 17, 2021, 14:28 Travis CaveSpent Target VaultStandard Operation Ta#62Spent Target Move The spent Ta#62 target along with
2A2M19 were placed in pail #256 and placed
in spot 7A of the spent target vault. See
 Target_Index_2021-09-17.pdf 
  2249   Wednesday, September 22, 2021, 11:13 Travis CaveSpent Target VaultStandard Operation UC#34Spent Target Move The spent UC#34 target was moved
from the north hot cell to the spent target
vault. See attached PDF for details.
 Target_Index_2021-09-22.pdf 
  2250   Thursday, September 23, 2021, 19:04 Adam NewsomeSpent Target VaultDevelopment  Mini-Storage: Remote CapabilityRemote capability was added for the mini-storage
door control. The control signals originate
from the Opto 22 Module box that is used
  
  2261   Friday, October 29, 2021, 12:27 Travis CaveSpent Target VaultStandard Operation Ta#56Repacking of the target. Ta#56 in pail #169 was repacked and
placed into #269 and was placed in the mini
vault at the back. It was 3.86mSv/hr upon
 Target_Index_2021-10-29.pdfTarget_Index_2021-10-29_mini_vault.pdf 
  2266   Wednesday, November 10, 2021, 11:06 Travis CaveSpent Target VaultStandard Operation C#3Spent Target Move The spent C#3 target has been moved
from the south hot cell to the spent target
vault it was placed in pail #270 and put
 Target_Index_2021-11-10.pdf 
  2267   Monday, November 15, 2021, 12:00 Travis CaveSpent Target VaultStandard Operation Ta#53Repacking of the target. Ta#53 was repacked and placed in
the mini vault it was changed from pail#164
to pail#262. See attached PDF for further
 Target_Index_2021-11-15.pdfTarget_Index_2021-11-15_mini_vault.pdf 