Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2161     Entry time: Thursday, November 05, 2020, 10:23
Author: David Wang 
Category: Spent Target Vault 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: TM2 old source tray and TM4 optic tray in vault tray#9. 

TM2 old source tray and TM4 optic tray are stored together in vault tray#9. The fielding measurement at SHC post 0.5 meter distance:
 

March 1st 2019, maximum 14.6msv/hr, minimum 4.78 msv/hr

Nov 2nd 2020, max 7.11m sv/hr, min 2.5msv/hr.

ELOG V2.9.2-2455