Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2167     Entry time: Thursday, November 19, 2020, 12:00
Author: Adam Newsome 
Category: Spent Target Vault 
Type: Standard Operation 
Module:  
Target/Number: C#2 
Subject: Spent Target Move 

C#2 has been moved from the south hot cell to the spent target vault. It is in spot 8A of the vault in pail # 235 and was 185 mSv/hr upon removal from the south hot cell.

The Target Index spreadsheet has been updated on DocuShare.

ELOG V2.9.2-2455