Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2205     Entry time: Thursday, March 25, 2021, 10:38
Author: David Wang 
Category: Spent Target Vault 
Type: Standard Operation 
Module:  
Target/Number: C#1 
Subject: Remove pail 237 spent target C#1 from storage vault to mini storage.  

Pail 237 only has 200u sv/hr field at 0.5 meter. On contact measurement: 0.9 to 1.6 m sv/hr.and less than 80 count contamination outside the pail.   It is moved to mini storage. We will transfer this pail to cyclotron vault and store it there later.

ELOG V2.9.2-2455