Message ID: 2111     Entry time: Friday, June 26, 2020, 10:43
Author: Adam Newsome 
Category: Spent Target Vault 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Routine mechanical inspection: storage vault and mini-storage drive systems 

An inspection was performed on drive systems for both storage vaults (main and mini) by Adam Newsome and Dan McDonald. The functionality was not tested. Overall, nothing concerning was discovered.

Main Storage Vault:

  • Chain inspected (OK) and lubricated
  • Gearbox inspected - OK
  • All drive system set screws checked and tightened (note: chain drive screw slightly loose)
  • Sprocket alignment checked - OK
  • Limit switches checked - OK
  • Emergency close mechanism cable checked - OK

Mini-Storage:

  • Chain inspected - OK
  • Set screw checked - OK
  • Gearbox inspected - OK (need inventory/spare in stock)
  • Roller wheels checked - OK

 

Attachment 1: IMG_20200626_092538.jpg  4.368 MB  | Show | Hide all
Attachment 2: IMG_20200626_093208.jpg  1.922 MB  | Show | Hide all
Attachment 3: IMG_20200626_093924.jpg  2.063 MB  | Show | Hide all
Attachment 4: IMG_20200626_093951.jpg  1.128 MB  | Show | Hide all
ELOG V2.9.2-2455