Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2266     Entry time: Wednesday, November 10, 2021, 11:06
Author: Travis Cave 
Category: Spent Target Vault 
Type: Standard Operation 
Module:  
Target/Number: C#3 
Subject: Spent Target Move 

 The spent C#3 target has been moved from the south hot cell to the spent target vault it was placed in pail #270 and put in spot 2C of the vault. See attached PDF for more details.

Attachment 1: Target_Index_2021-11-10.pdf  441 kB  | Show | Hide all
ELOG V2.9.2-2455