Message ID: 2078     Entry time: Friday, March 06, 2020, 09:35
Author: David Wang 
Category: Spent Target Vault 
Type: Standard Operation 
Module:  
Target/Number: SiC #39 
Subject: Spent target SiC#39 removal from SHC to storage vault. 

Spent target SiC#39 is removed from SHC to storage vault at 4C in pail #227.The move is successful.  Note:The small aluminum block holding wire on pail lid could be contaminated by SHC manipulator during the lid installation in SHC.