Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2069     Entry time: Thursday, February 20, 2020, 09:27
Author: David Wang 
Category: Spent Target Vault 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Inventory of mini storage and vault. 

Repacked nSiC#1 in SHC and moved it to mini storage vault. Transferred UCx26 and UCx28# from vault to mini-storage. See attachment for vault and mini-storage inventory.

Attachment 1: Mini_Vault_2020-02-20.pdf  72 kB  | Show | Hide all
Attachment 2: Vault__2020-02-20.pdf  77 kB  | Show | Hide all
ELOG V2.9.2-2455