2697
|
Tuesday, October 01, 2024, 12:40 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#67 | Target Ta#67 Removed from TM2 | October 1, 2024 - Aaron Tam
Ta#67 LP-SIS removed from TM2
Ta#67 is sitting in SHC awaiting |
9x |
|
2698
|
Tuesday, October 08, 2024, 11:20 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#68 | Ta#68 install onto TM2, w/ Troubleshooting | October 7, 2024 - Aaron Tam
Ta#68 HP-SIS checks performed at
B1 lab, moved to anteroom, and inserted into |
17x |
|
2699
|
Tuesday, October 08, 2024, 11:45 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | Tm2 electrical check with Ta#68 installed at SHC. | ABCD was dead shorted to 60kv bias during
the first time measurement after target installation.
Target was removed and reinstalled again |
|
|
2700
|
Tuesday, October 08, 2024, 11:46 |
David Wang | ITE | Standard Operation | TM2 | Ta#68. | Tm2 has been moved form SHC to ITE. | Tm2 has been moved form SHC to ITE. The
move is smooth. |
|
|
2701
|
Wednesday, October 09, 2024, 14:04 |
Frank Song | ITE | Standard Operation | TM2 | Ta#68 | Module Connection | TM2 with new target Ta#68 installed
is connected in ITE. Pls see form attached. |
|
|
2702
|
Thursday, October 10, 2024, 10:24 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#67 | Ta#67 PIE | Post Irradiation Examination
October 9, 2024 - Aaron Tam w/
Chad Fisher, Aurelia Laxdal, and Lucas Backes |
35x |
|
2725
|
Tuesday, December 03, 2024, 10:10 |
Frank Song | ITE | Standard Operation | TM2 | Ta#68 | module disconnection | TM2 with spent target TA#68 was disconnected
in ITE and is being moved to SHC. All water
lines are purged for module storage. |
|
|
2726
|
Tuesday, December 03, 2024, 10:51 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | TM2 move - ITE to SHC | TM2 was moved from ITE to SHC with Ta#68
target. During the move, a railing was lightly
bumped by the corner of the module - no obvious |
|
|
2727
|
Tuesday, December 03, 2024, 12:28 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | TM3 move - TCS to ITE | TM3 was moved with UCx#47 from TCS to ITE.
The move was smooth. |
|
|
2728
|
Tuesday, December 03, 2024, 15:53 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#68 | Ta#68 Removal | Note: Ta#68 had a difficult
install. See E-log ID# 2698 for more info
First look: |
22x |
|
2730
|
Wednesday, December 04, 2024, 09:00 |
David Wang | Facilities | Standard Operation | TM2 | | all water lines on TM2 have been purged. | all water lines on TM2 have been purged.
Refilled them(except HS ) with 60psi nitrogen
for module silo storage before next year |
|
|
2731
|
Wednesday, December 04, 2024, 10:40 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | TM2 move - SHC to silo | TM2 was remotely moved from the South Hot
Cell to SW Silo. Reading at SHC = 89.8 mSv/h.
The move was smooth. |
|
|
4
|
Thursday, June 30, 2011, 16:04 |
Pierre Bricault | Conditioning Station | Repair | TM1 | | TM1 status | Friday June 24 2011
The target module has been moved
to the Conditioning Station (CS) |
|
|
11
|
Thursday, July 21, 2011, 17:39 |
Bevan Moss | Conditioning Station | Repair | TM1 | | TM1 Ground Electrode, Thermocouple line, Stem, panel, repairs | Over the
period of July 20-21st TM1 had several repairs
completed and tested. The easiest of the |
|
|
12
|
Friday, July 22, 2011, 10:30 |
Bevan Moss | Conditioning Station | Repair | TM1 | | TM1 Ground Electrode, Thermocouple line, Stem, panel, repairs |
|
|
|
14
|
Wednesday, July 27, 2011, 14:34 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | | Module move | TM#1 has been moved from the Conditioning
Station to the South Hot Cell for the installation
of Ta#37. |
|
|
15
|
Thursday, July 28, 2011, 12:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#37 | Electrical check | TM#1 has passed the the electrical check. |
|
|
16
|
Thursday, July 28, 2011, 14:07 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Ta#37 | Module move | Tm#1 with Ta#37 moved from the south hot
cell to the conditioning station. Move went
well. |
|
|
17
|
Tuesday, August 02, 2011, 09:41 |
Pierre Bricault | Conditioning Station | Repair | TM1 | ITW-TM1-Ta#37-LP-SIS | Test high voltage on TM1 | TM1 has received the Ta#37-LP and
has been pumping since thursday. This morning
the pressure gauges read, IMG1: 1.6x10^-6 |
|
|
18
|
Wednesday, August 03, 2011, 11:24 |
Travis Cave | ITW | Standard Operation | TM1 | Ta#37 | Module move | TM#1 with Ta#37 has been moved from the
conditioning station to the the west target
station, move went well. |
|