2516
|
Monday, January 08, 2024, 14:47 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | TM2 Move - ITW to SHC |
TM2 was moved from ITW to the South Hot Cell with Ta#66 target. |
|
2517
|
Tuesday, January 09, 2024, 16:10 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | TM2 Move - SHC to Silo |
TM2 was moved with no target attached from the South Hot Cell to a silo. |
|
2523
|
Friday, January 12, 2024, 11:25 |
David Wang | South Hot-Cell | Standard Operation | TM2 | Ta#66 | Ta#66 post operation electrical check at SHC |
Ta#66 post operation electrical check was done at SHC this Monday. See attachment. |
Attachment 1: TM2_Ta66_post__oeration_electrical_check.pdf
|
|
|
2583
|
Tuesday, May 07, 2024, 09:47 |
David Wang | ITE/ITW | Maintenance | TM2 | | Broken TM2:TP2 has been replaced. |
Broken TM2:TP2 has been replaced otday by a new TV-1001 nav pump supplied by vacuum group. replaced pump seris number:201281. new pump series number:IT23431008. TPs replacement history sheet will be updated by Frank. I will put comment on this e fault and let operator to close it. |
|
2603
|
Thursday, May 30, 2024, 11:08 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 was moved from silo to TCS yesterday morning. |
TM2 was moved from silo to TCS yesterday morning. The move is smooth. TCS vacuum system was started after. TCS and TM2 pumping down is ok so far. |
|
2608
|
Wednesday, June 12, 2024, 10:18 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 is moved from TCS to silo this morning |
TM2 is moved from TCS to silo this morning. The move is smooth. |
|
2609
|
Thursday, June 13, 2024, 11:44 |
David Wang | Conditioning Station | Repair | TM2 | | Replaced several o ring seals on TM2 service cap. |
couple of E-8 to low E-7 atm.cc/sec leak were found on TM2 service cap top air to vacuum o rings. Replaced these leak o ring seals including o ring on IG1 and steerer service panel,o rings on MSP, EE, D blue nylon and copper feed through, and o ring on a round blank off beside MSP terminal on second row.
2024-july-03 update: TM2 was leak checked again at TCS. no air to vacuum leak on module top. i helium pressure tested(60psi) all water cooling lines (except HS) . They are leak free. |
|
2626
|
Wednesday, June 26, 2024, 13:49 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Tm2 has been moved from SW silo to TCS. |
Tm2 has been successfully moved from SW silo to TCS. |
|
2629
|
Wednesday, July 03, 2024, 14:01 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Tm2 has been moved from TCS to SW silo. |
Tm2 has been moved from TCS to SW silo. the move is smooth. |
|
2655
|
Monday, August 12, 2024, 15:55 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#67 LP-SIS | Target Loading |
Ta#67 Target loaded onto TM2
Leak check passed
Electrical test passed after loosening off target electrode conductor screws, and torqueing by feel
|
|
2656
|
Tuesday, August 13, 2024, 08:39 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Ta#67 | electrical check/leak check |
TM2 with new target Ta#67 had been electric/leak checked before moving to ITE. See attachment pls. |
Attachment 1: TM2_with_Ta@67_electric_and_leak_check_on_SHC.pdf
|
|
|
2657
|
Tuesday, August 13, 2024, 14:18 |
Frank Song | ITE | Standard Operation | TM2 | Ta#67 | Module Connection |
TM2 with new target Ta#67 was connected in ITE, all TP are running at their full speed now. |
Attachment 1: TM2_with_Ta#67_connection_in_ITE_20240813.pdf
|
|
|
2666
|
Monday, August 19, 2024, 15:29 |
Frank Song | ITW/ITE | Standard Operation | TM2 | Ta#67 | shielding blocks transfer |
5 shielding blocks have been transferred from ITW to ITE, MAA has been secured after moving. |
|
2695
|
Tuesday, October 01, 2024, 09:16 |
Frank Song | ITE | Standard Operation | TM2 | Ta#67 | module disconnection |
TM2 with spent target Ta#67 was disconnected in ITE. see attachment pls. |
Attachment 1: TM2_with_spent_target_Ta#67_disconnection_in_ITE_2024-10-01.pdf
|
|
|
2696
|
Tuesday, October 01, 2024, 10:55 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | TM2 has been moved from ITE to SHC. |
TM2 has been moved from ITE to SHC. Peter did the move with Travis on help. The move is smooth. |
|
2697
|
Tuesday, October 01, 2024, 12:40 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#67 | Target Ta#67 Removed from TM2 |
October 1, 2024 - Aaron Tam
Ta#67 LP-SIS removed from TM2
Ta#67 is sitting in SHC awaiting PIE
TM2 Containment Box Cover has not been reinstalled
Photos of target removal and module attached |
Attachment 1: Containment_Box.jfif
|
Attachment 2: Containment_Box_Cover_Internal.jfif
|
Attachment 3: Target_Fasteners_on.jfif
|
Attachment 4: Target_Fasteners_off.jfif
|
Attachment 5: Service_Tray_no_Target.jfif
|
Attachment 6: Ta#67_Left.jfif
|
Attachment 7: Ta#67_Right.jfif
|
Attachment 8: Ta#67_Top.jfif
|
Attachment 9: Ta#67_Bottom.jfif
|
|
2698
|
Tuesday, October 08, 2024, 11:20 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#68 | Ta#68 install onto TM2, w/ Troubleshooting |
October 7, 2024 - Aaron Tam
Ta#68 HP-SIS checks performed at B1 lab, moved to anteroom, and inserted into SHC via tool port w/ Aaron Schmidt.
Ta#68 fixed to source tray with 4 mounting bolts in order of: Right manip. holding, Top left, Right manip. removed, Bottom right, Top right, bottom left. w/ Aaron Schmidt and Brady Borrmann
- Motion was smooth, no resistance when positioning onto pins
VCR fittings done up with ample force, leak check passed
Conductor bolts installed in order of: 2 Target electrode conductors (Checked washers), 3 target Inner and outer conductors.
All bolts checked for full contact with mirror and binos.
Electrical check failed: Dead short (look for David's ELOG for more detail when available)
Troubleshooting while David is checking resistance: w/ Ferran
- Intermittent success with heavy manipulation of water lines
- Loosening off Waterline bracket-to-source-tray
- Loosening off Bracket to water line bolts 5/32 hex's
- Rotating bracket towards operator (effectively raising waterlines in the back upwards) seems to yield more intermittent success, but never passing megger @ 250V
- Tube was inadvertently dented when handling the tube in a wrenching motion with manip tong. counterclockwise
- Target removed while David is still on the multimeter (calling for any sign of success)
- Starting to remove Target in order of: Tightening back waterline-to-bracket 5/32 hex screws, loosening off waterline bracket, loosening off VCR nuts, 2 Target electrode conductor bolts, 3 Target inner and outer conductor bolts, Fixing bolts Top left (dropped below source tray), Bottom right...
- (At this time David called with some success with electrical check)
- Reversing course to verify fault has passed, target was reassembled, only finger loose on the VCR nuts.
- Faults no longer present
- Target removed
- As target was being pulled off source tray locating pins, a piece of ceramic fell onto the source tray just behind window waterlines.
Target taken out of Hotcell by Ferran. New VCR gaskets installed. Target reinserted
Target installed no issues. Used fixing bolt used to replace dropped one.
Leak check passed, Electrical check passed
- Notably don't have a photo of reinstalled target or source tray before 2nd install attempt.
Containment cover reinstalled
Ceramic piece moved into Pail #285 (suspect this is a very hot piece)
TM2 ready for move to ITE |
Attachment 1: 1st_Install_Leak_check_passed.jfif
|
Attachment 2: 1st_Install_Complete_waiting_for_electrical_check.jfif
|
Attachment 3: Troubleshooting_1st_install_(dent_in_tube_visible).jfif
|
Attachment 4: Water_Line_Dent_Face.jfif
|
Attachment 5: Water_Line_Dent_profile.jfif
|
Attachment 6: Waterline_alignment_after_removing_VCR_connection.jfif
|
Attachment 7: Ceramic_piece_fell_untouched_position.jfif
|
Attachment 8: Ceramic_Piece.jfif
|
Attachment 9: 285_Pail_location.jfif
|
Attachment 10: Closer_look_Below_Target_between_electrodes.jfif
|
Attachment 11: Closer_Look_Taget_Electrode_Conductor_LEFT_(2).jfif
|
Attachment 12: Closer_Look_Taget_Electrode_Conductor_LEFT.jfif
|
Attachment 13: Closer_Look_Taget_Electrode_Conductor_RIGHT_(2).jfif
|
Attachment 14: Closer_Look_Taget_Electrode_Conductor_RIGHT.jfif
|
Attachment 15: Closer_Look_Target_Inner_and_Outer_conductors.jfif
|
Attachment 16: Closer_Look_waterline_bracket_after_manipulation.jfif
|
Attachment 17: TM2_Cover_Closed_completed_ready_for_move.jfif
|
|
2699
|
Tuesday, October 08, 2024, 11:45 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | Tm2 electrical check with Ta#68 installed at SHC. |
ABCD was dead shorted to 60kv bias during the first time measurement after target installation. Target was removed and reinstalled again with new VCR seals by Ferran. during target removal process, short disappeared when Aaron remove bolts on CD tube heaters terminal. leak check and electrical check result are good after second time target installation. |
Attachment 1: TM2_Ta#68_electrical_check.pdf
|
|
|
2700
|
Tuesday, October 08, 2024, 11:46 |
David Wang | ITE | Standard Operation | TM2 | Ta#68. | Tm2 has been moved form SHC to ITE. |
Tm2 has been moved form SHC to ITE. The move is smooth. |
|
2701
|
Wednesday, October 09, 2024, 14:04 |
Frank Song | ITE | Standard Operation | TM2 | Ta#68 | Module Connection |
TM2 with new target Ta#68 installed is connected in ITE. Pls see form attached. |
Attachment 1: TM2_with_new_target_Ta#68_connection_in_ITE.pdf
|
|