Tuesday, October 01, 2024, 12:40, Aaron Tam, South Hot-Cell, Standard Operation, TM2, Ta#67, Target Ta#67 Removed from TM2 9x
|
October 1, 2024 - Aaron Tam
Ta#67 LP-SIS removed from TM2
Ta#67 is sitting in SHC awaiting PIE |
Tuesday, October 08, 2024, 11:20, Aaron Tam, South Hot-Cell, Standard Operation, TM2, Ta#68, Ta#68 install onto TM2, w/ Troubleshooting 17x
|
October 7, 2024 - Aaron Tam
Ta#68 HP-SIS checks performed at B1 lab, moved to anteroom, and inserted into SHC via tool port w/ Aaron Schmidt.
Ta#68 fixed to source tray with 4 mounting bolts in order of: Right manip. holding, Top left, Right manip. removed, Bottom right, Top right, bottom |
Tuesday, October 08, 2024, 11:45, David Wang, South Hot-Cell, Standard Operation, TM2, , Tm2 electrical check with Ta#68 installed at SHC.
|
ABCD was dead shorted to 60kv bias during the first time measurement after target installation. Target was removed and reinstalled again with new VCR
seals by Ferran. during target removal process, short disappeared when Aaron remove bolts on CD tube heaters terminal. leak check and electrical
check result are good after second time target installation. |
Tuesday, October 08, 2024, 11:46, David Wang, ITE, Standard Operation, TM2, Ta#68., Tm2 has been moved form SHC to ITE.
|
Tm2 has been moved form SHC to ITE. The move is smooth. |
Wednesday, October 09, 2024, 14:04, Frank Song, ITE, Standard Operation, TM2, Ta#68, Module Connection
|
TM2 with new target Ta#68 installed is connected in ITE. Pls see form attached. |
Thursday, October 10, 2024, 10:24, Aaron Tam, South Hot-Cell, Standard Operation, TM2, Ta#67, Ta#67 PIE 35x
|
Post Irradiation Examination
October 9, 2024 - Aaron Tam w/ Chad Fisher, Aurelia Laxdal, and Lucas Backes
PIE conducted by Chad with direction from Aurelia. Aaron and Lucas observing/documenting |
Tuesday, December 03, 2024, 10:10, Frank Song, ITE, Standard Operation, TM2, Ta#68, module disconnection
|
TM2 with spent target TA#68 was disconnected in ITE and is being moved to SHC. All water lines are purged for module storage. |
Tuesday, December 03, 2024, 10:51, Adam Newsome, South Hot-Cell, Standard Operation, TM2, , TM2 move - ITE to SHC
|
TM2 was moved from ITE to SHC with Ta#68 target. During the move, a railing was lightly bumped by the corner of the module - no obvious damage or issues
have been observed. Otherwise, the move was smooth. |
Tuesday, December 03, 2024, 12:28, Adam Newsome, South Hot-Cell, Standard Operation, TM2, , TM3 move - TCS to ITE
|
TM3 was moved with UCx#47 from TCS to ITE. The move was smooth. |
Tuesday, December 03, 2024, 15:53, Aaron Tam, South Hot-Cell, Standard Operation, TM2, Ta#68, Ta#68 Removal 22x
|
Note: Ta#68 had a difficult install. See E-log ID# 2698 for more info
First look:
Containment box cover looks the same as previous (See:ID: 2697)
Target shows large amount of soot-like deposits (See photos |
Wednesday, December 04, 2024, 09:00, David Wang, Facilities, Standard Operation, TM2, , all water lines on TM2 have been purged.
|
all water lines on TM2 have been purged. Refilled them(except HS ) with 60psi nitrogen for module silo storage before next year using. |
Wednesday, December 04, 2024, 10:40, Adam Newsome, South Hot-Cell, Standard Operation, TM2, , TM2 move - SHC to silo
|
TM2 was remotely moved from the South Hot Cell to SW Silo. Reading at SHC = 89.8 mSv/h. The move was smooth. |
Thursday, June 30, 2011, 16:04, Pierre Bricault, Conditioning Station, Repair, TM1, , TM1 status
|
Friday June 24 2011
The target module has been moved to the Conditioning Station (CS)
Pumping overnight |
Thursday, July 21, 2011, 17:39, Bevan Moss, Conditioning Station, Repair, TM1, , TM1 Ground Electrode, Thermocouple line, Stem, panel, repairs
|
Over the period of July 20-21st TM1 had several repairs completed and tested. The easiest of the repairs was the installation
of a gasket and a blank off. The next repair was to replace the 2 oring on the side panels that were removed for inspection and repair. The instrument
panel oring was replaced again and the previous one measured. Both were found to have the correct diameter of 0.131 inches for the seal groove. When attempting |
Friday, July 22, 2011, 10:30, Bevan Moss, Conditioning Station, Repair, TM1, , TM1 Ground Electrode, Thermocouple line, Stem, panel, repairs
|
Bevan Moss wrote:
Over the period of July 20-21st TM1 had several repairs completed and |
Wednesday, July 27, 2011, 14:34, Travis Cave, South Hot-Cell, Standard Operation, TM1, , Module move
|
TM#1 has been moved from the Conditioning Station to the South Hot Cell for the installation of Ta#37. |
Thursday, July 28, 2011, 12:02, Travis Cave, South Hot-Cell, Standard Operation, TM1, Ta#37, Electrical check
|
TM#1 has passed the the electrical check. |
Thursday, July 28, 2011, 14:07, Travis Cave, Conditioning Station, Standard Operation, TM1, Ta#37, Module move
|
Tm#1 with Ta#37 moved from the south hot cell to the conditioning station. Move went well. |
Tuesday, August 02, 2011, 09:41, Pierre Bricault, Conditioning Station, Repair, TM1, ITW-TM1-Ta#37-LP-SIS, Test high voltage on TM1
|
TM1 has received the Ta#37-LP and has been pumping since thursday. This morning the pressure gauges read, IMG1: 1.6x10^-6 T and IG1: 7.4x10^-7
T.
The high voltage power supply has been connected to all high voltage feedthroughs and the voltage raise to 42 kV. |
Wednesday, August 03, 2011, 11:24, Travis Cave, ITW, Standard Operation, TM1, Ta#37, Module move
|
TM#1 with Ta#37 has been moved from the conditioning station to the the west target station, move went well. |
|