  2697   Tuesday, October 01, 2024, 12:40 Aaron TamSouth Hot-CellStandard OperationTM2Ta#67Target Ta#67 Removed from TM2  October 1, 2024 - Aaron Tam 
Ta#67 LP-SIS removed from TM2
Ta#67 is sitting in SHC awaiting
 9x 
  2698   Tuesday, October 08, 2024, 11:20 Aaron TamSouth Hot-CellStandard OperationTM2Ta#68Ta#68 install onto TM2, w/ Troubleshooting October 7, 2024 - Aaron Tam 
Ta#68 HP-SIS checks performed at
B1 lab, moved to anteroom, and inserted into
 17x 
  2699   Tuesday, October 08, 2024, 11:45 David WangSouth Hot-CellStandard OperationTM2 Tm2 electrical check with Ta#68 installed at SHC. ABCD was dead shorted to 60kv bias during
the first time measurement after target installation.
Target was removed and reinstalled again
 TM2_Ta#68_electrical_check.pdf 
  2700   Tuesday, October 08, 2024, 11:46 David WangITEStandard OperationTM2Ta#68.Tm2 has been moved form SHC to ITE.Tm2 has been moved form SHC to ITE. The
move is smooth. 
  
  2701   Wednesday, October 09, 2024, 14:04 Frank SongITEStandard OperationTM2Ta#68Module Connection TM2 with new target Ta#68 installed
is connected in ITE. Pls see form attached.
 TM2_with_new_target_Ta#68_connection_in_ITE.pdf 
  2702   Thursday, October 10, 2024, 10:24 Aaron TamSouth Hot-CellStandard OperationTM2Ta#67Ta#67 PIE  Post Irradiation Examination
October 9, 2024 - Aaron Tam w/
Chad Fisher, Aurelia Laxdal, and Lucas Backes 
 35x 
  2725   Tuesday, December 03, 2024, 10:10 Frank SongITEStandard OperationTM2Ta#68module disconnectionTM2 with spent target TA#68 was disconnected 
in ITE and is being moved to SHC. All water
lines are purged for module storage.
 TM2_with_spent_target_TA#68_disconnection_in_ITE_2024-12-03.pdf 
  2726   Tuesday, December 03, 2024, 10:51 Adam NewsomeSouth Hot-CellStandard OperationTM2 TM2 move - ITE to SHCTM2 was moved from ITE to SHC with Ta#68
target. During the move, a railing was lightly
bumped by the corner of the module - no obvious
  
  2727   Tuesday, December 03, 2024, 12:28 Adam NewsomeSouth Hot-CellStandard OperationTM2 TM3 move - TCS to ITETM3 was moved with UCx#47 from TCS to ITE.
The move was smooth. 
  
  2728   Tuesday, December 03, 2024, 15:53 Aaron TamSouth Hot-CellStandard OperationTM2Ta#68Ta#68 Removal  Note: Ta#68 had a difficult
install. See E-log ID# 2698 for more info 
First look:
 22x 
  2730   Wednesday, December 04, 2024, 09:00 David WangFacilitiesStandard OperationTM2 all water lines on TM2 have been purged.all water lines on TM2 have been purged.
Refilled them(except HS ) with 60psi nitrogen
for module silo storage before next year
  
  2731   Wednesday, December 04, 2024, 10:40 Adam NewsomeSouth Hot-CellStandard OperationTM2 TM2 move - SHC to siloTM2 was remotely moved from the South Hot
Cell to SW Silo. Reading at SHC = 89.8 mSv/h.
The move was smooth. 
  
  4   Thursday, June 30, 2011, 16:04 Pierre BricaultConditioning StationRepairTM1 TM1 statusFriday June 24 2011
The target module has been moved
to the Conditioning Station (CS)
  
  11   Thursday, July 21, 2011, 17:39 Bevan MossConditioning StationRepairTM1 TM1 Ground Electrode, Thermocouple line, Stem, panel, repairsOver the
period of July 20-21st TM1 had several repairs
completed and tested. The easiest of the
 IMG_1681.JPGIMG_1662.JPGIMG_1686.JPGIMG_1695.JPG 
  12   Friday, July 22, 2011, 10:30 Bevan MossConditioning StationRepairTM1 TM1 Ground Electrode, Thermocouple line, Stem, panel, repairs

    

       
            
  
  14   Wednesday, July 27, 2011, 14:34 Travis CaveSouth Hot-CellStandard OperationTM1 Module moveTM#1 has been moved from the Conditioning
Station to the South Hot Cell for the installation
of Ta#37.
  
  15   Thursday, July 28, 2011, 12:02 Travis CaveSouth Hot-CellStandard OperationTM1Ta#37Electrical checkTM#1 has passed the the electrical check.  Electrical_Check_for_TM_1_with_Target_attached_Ta37.pdf 
  16   Thursday, July 28, 2011, 14:07 Travis CaveConditioning StationStandard OperationTM1Ta#37Module moveTm#1 with Ta#37 moved from the south hot
cell to the conditioning station. Move went
well.
  
  17   Tuesday, August 02, 2011, 09:41 Pierre BricaultConditioning StationRepairTM1ITW-TM1-Ta#37-LP-SISTest high voltage on TM1 TM1 has received the Ta#37-LP and
has been pumping since thursday. This morning
the pressure gauges read, IMG1: 1.6x10^-6
  
  18   Wednesday, August 03, 2011, 11:24 Travis CaveITWStandard OperationTM1Ta#37Module moveTM#1 with Ta#37 has been moved from the
conditioning station to the the west target
station, move went well.
  